Please make sure to plan ahead and
know your route before your travels this weekend and slow down in
work zones.
If you are heading out of town, you
can view the Statewide
Traffic Impacts Map to see new and existing traffic impacts on
greater Minnesota state highways. You also can visit 511mn.org
for real-time travel information anywhere in Minnesota at any given time.
These traffic impacts are new as of
this weekend.
Hwy 3 in Inver Grove Heights
- Hwy 3 is closed between Co. Rd. 26 and 60th St. through mid-November.
Visit the City of Inver Grove Heights project page for more details: http://www.ci.inver-grove-heights.mn.us/809/65th-Street-Hwy-3.
Hwy 5 near Victoria and Chanhassen
- From 8 a.m. to 4 p.m. and again from 6 p.m. to 9 p.m. on Fri, Aug. 3, Hwy 5 will have alternating lane and turn lane closures controlled by flaggers between Co. Rd. 11 and Hwy 41. Then again on Sat, Aug. 4 and Sun, Aug. 5 from 7 a.m. to 5 p.m. each day.
Hwy 7 Minnetonka to St. Louis Park
- Beginning 7 p.m. Fri, Aug. 3, Hwy 7 will be reduced to a single lane in both directions between Shady Oak Rd. and Louisiana Ave. through 5 a.m. Mon, Aug. 6.
Visit the Hwy 7 Minnetonka to SLP project page for more details.
Hwy 25 near Scott and Carver County border
- From 8 a.m. to 4 p.m. and again from 6 p.m. to 9 p.m. on Fri, Aug. 3, Hwy 25 will have alternating lane and turn lane closures controlled by flaggers Scott/Carver County Border to west of Co. Rd. 14.
35W@94: Downtown to Crosstown in Minneapolis
- The following are now open: The ramp from WB I-94 to 11th St., 5th Ave. S ramp to EB I-94, All lanes and sidewalks fully open on the Franklin Ave. Bridge.
- Beginning Fri, Aug. 3, the 40th St. bridge over I-35W will be closed to pedestrians and bicyclists through fall 2020. Detour: Paved trail on the east side of MLK park, 42nd St, 2nd Ave.
Visit the 35W@94: Downtown to Crosstown project page for more details.
I-35W in Minneapolis
- Beginning 9 p.m. Fri, Aug. 3, I-35W will be closed in both directions between Hwy 62 and I-694 in Minneapolis. Crews will begin closing the on and off ramps for I-35W about one to two hours before closing the interstate.
- Beginning 9 p.m. Fri, Aug. 3, Hwy 280 also will be closed during the I-35W closure. Both directions of Hwy 280 will remain open to local traffic between University Ave. and Larpenteur Ave. SB I-35W from Co. Rd. C to SB Hwy 280 will be closed. WB Hwy 36 to SB Hwy 280 will be closed.
- The ramp from Hennepin Ave. to SB I-35W will be closed until 5 a.m. Mon, Aug 6.
- Access from SB I-694 to Co. Rd. C will remain open.
- Detour: Hwy 62, Hwy 100 and I-694
Hwy 41 near Chanhassen
- From 8 a.m. to 4 p.m. and again from 6 p.m. to 9 p.m. on Fri, Aug. 3, Hwy 41 will have alternating lane and turn lane closures controlled by flaggers between Hwy 7 and Hwy 5. Then again on Sat, Aug. 4 and Sun, Aug. 5 from 7 a.m. to 5 p.m. each day.
Hwy 62 in Eden Prairie and Edina
- The ramp from Tracy Ave. to EB Hwy 62 is now open.
- The ramps from SB Hwy 169 to EB Hwy 62 and from EB Hwy 62 to NB Hwy 169 will open Fri, Aug. 3
- The ramp from Gleason Rd. to WB Hwy 62 will open Sat, Aug. 4.
Visit the Hwy 62 project page for more details.
Hwy 65 Ham Lake to East Bethel
- Beginning Fri, Aug. 3, work begins at the intersection of Hwy 65 and 187th Ave. through fall.
- Beginning Fri, Aug. 3, SB Hwy 65 will be reduced to a single lane at 187th Ave. and there will be no access to 187th Ave. west of Hwy 65 until 5 a.m. Mon, Aug. 6.
Visit the Hwy 65 project page for more details.
Hwy 95 in Stillwater
- Beginning 12:01 a.m. Sat, Aug. 4, Hwy 95 in both directions will have temporary, short-term lane closures between Nelson St. and Elm St. until 5 a.m. the same day.
Hwy 149 High Bridge in St. Paul
- Hwy 149/Dodd Rd. from Wentworth Ave. to Delaware Ave. is now open. This work was part of an Xcel Energy project.
Hwy 169 in Champlin
- 114th and 120th Avenues east of Hwy 169 are schedule to open by Sun, Aug. 5.
These traffic impacts will happen early next week.
Hwy 3 in Inver Grove Heights
- Beginning Tue, Aug. 7, the intersection of Hwy 3 and Rich Valley Rd/Co. Rd. 71 will be closed through mid-September.
Visit the Hwy 3 in Inver Grove Heights project page for more details.
Hwy 25 near Scott and Carver County border
- From 8 a.m. to 4 p.m. and again from 6 p.m. to 9 p.m. on Mon, Aug. 6 and Tue, Aug. 7, Hwy 25 will have alternating lane and turn lane closures controlled by flaggers Scott/Carver County Border to west of Co. Rd. 14.
Hwy 62 in Eden Prairie and Edina
- Beginning Mon, Aug. 6, the ramp from EB Hwy 62 to SB Hwy 169 will be closed through Sun, Aug. 12 and the ramp from EB Hwy 212 to EB Hwy 62/Hwy 169 will be closed through Wed, Aug. 15.
- Beginning Mon, Aug. 6, Clearwater Dr. will be open to right turns in and out. Access to Beach Rd. from WB Hwy 62 will be closed through Tue, Aug. 28. Follow the signed detour.
Visit the Hwy 62 project page for more details.
Hwy 65 in Fridley
- Beginning Mon, Aug. 6, preliminary work begins along the west side of SB Hwy 65 between 64th Ave. and W. Moore Lake Dr. Watch for shoulder closures and construction traffic.
These projects have already begun and continue to have traffic impacts. No new impacts related to these projects are beginning this weekend.
Hwy 3 in Inver Grove Heights
- Hwy 3 will be closed between Hwy 149 and Hwy 55 through fall 2018. Detour: I-494 and Hwy 149
- The intersection Hwy 3 and 65th St. will be closed through mid-November. This is a city of Inver Grove Heights project. Visit the City of Inver Grove Heights project page for more details: http://www.ci.inver-grove-heights.mn.us/809/65th-Street-Hwy-3.
Visit the Hwy 3 in Inver Grove Heights project page for more details.
Hwy 7 Minnetonka to St. Louis Park
- The free right turn lane from Fifth Ave. N. in Hopkins to Hwy 7 is closed through August. Motorists should go to the light and turn right.
- Watch for lane closures on Hwy 7 and to accesses to local streets through September.
Visit the Hwy 7 Minnetonka to SLP project page for more details.
35W@94: Downtown to Crosstown in Minneapolis
- The access to downtown (11th
St./5th Ave. S/E. Grant St.) from NB I-35W is closed through fall 2018 and
the access out of downtown (from 12th St./4th Ave.) to SB I-35W is closed
through fall 2021. Routes into and out of downtown.
- WB I-94 is reduced to two lanes
from Chicago Ave. to Nicollet Ave. through fall 2018. SB I-35W is reduced
to two lanes from downtown Minneapolis to 43rd St. through fall 2019. NB
I-35W is reduced to three lanes from 43rd St. to downtown Minneapolis
through fall 2021. View map of all lane closures.
-
The following ramps are closed: EB I-94 to SB I-35W is closed through fall 2021, NB I-35W to WB I-94 is closed through fall 2021, SB I-35W to 35th St. is closed through fall 2020, 4th Ave./16th St. to WB I-94 closed through early October 2018.
- The following bridges are closed: 26th St. bridge over I-35W and 24th St. pedestrian bridge over I-35W until fall 2021
- There are several other road,
lane, ramp and local street closures.
Visit the 35W@94: Downtown to Crosstown project page for
more details.
I-35 North Metro Split from Lino Lakes to Forest Lake
- NB I-35 is reduced to two lanes and separated with concrete barriers between Hwy 97 and Hwy 8 through mid-August. Motorists, should expect congestion and allow yourself extra time if driving through the area.
- SB I-35 will periodically be reduced to two lanes near Hwy 8 in Forest Lake through mid-August.
Visit the I-35 North Metro Split project page for more details.
I-35E in Little Canada
- The ramp from NB I-35E to EB Hwy 36 is closed through late August.
I-35W Minneapolis to Roseville
- NB/SB I-35W is reduced by one lane between 4th St. and Co. Rd. C through Fri, Oct. 12, when weekend closures are not occurring.
- The following ramps to/from NB I-35W will be closed from 10 p.m. to 6 a.m. Mon. through Fri. through Fri, Oct. 12 (these ramps will not be closed consecutively): 4th St. SE, SE 11th St., Johnson St/New Brighton Blvd/Stinson Blvd., Industrial Blvd.
Visit the I-35W Resurfacing project page for more details.
Hwy 36 Stillwater Lift Bridge
- The Hwy 36 Stillwater Lift Bridge over the St. Croix River between Stillwater, MN and Houlton, WI is closed to ALL traffic. It will reopen for pedestrian and bicycle traffic in June of 2019.
- Traffic has been transferred to the new St. Croix Crossing Bridge to the south in Oak Park Heights.
Visit the Stillwater Lift Bridge project page for more details.
Hwy 41 Chaska
- Hwy 41 is closed between Hundertmark Rd. and Pioneer Trl. through early September. Primary Detour: Hwy 212, Powers Blvd., Lyman Blvd.
Visit the Hwy 41 Project – Jonathan Area website for more details: www.co.carver.mn.us/Hwy41ProjectJonathan.
Hwy 50 in Farmington
- Hwy 50 is reduced to a single lane with flaggers in both directions between 4:30 a.m. and 5 p.m. through mid-August. While crews work, there may be early morning noise throughout the project area.
- The Co. Rd. 80 intersection at Hwy 50 is closed through late August.
Visit the Hwy 50 in Farmington project page for more details.
Hwy 62 in Eden Prairie and Edina
- EB and WB Hwy 62 are reduced to a single lane from Shady Oak Rd. to I-494 through Mon, Aug. 13.
- Access to and from Hwy 62 at Clearwater Dr. is closed through Mon, Aug. 6.
Visit the Hwy 62 project page for more details.
Hwy 65 Ham Lake to East Bethel
- The center median of Hwy 65 is closed at 157th Ave. Right turns only allowed from Hwy 65 and 157th Ave. through fall.
Visit the Hwy 65 RCI project page for more details.
I-94 East Metro (Woodbury to St. Paul)
- All major road construction is complete. However, crews are finishing up several minor wrap-up items over the next few weeks. Work is expected to be complete by late August.
Visit the I-94 East Metro project page for more details.
I-94 Minneapolis to Brooklyn Center
Visit the I-94 Minneapolis to Brooklyn Center project page for more details.
Hwy 95/Manning Ave. Woodbury to Denmark Twp.
- Hwy 95 is closed in both directions from Bailey Rd. to 70th St. through Fri, Sept. 7. Primary Detour: 70th St, Woodbury Dr. (Co. Rd. 19), Bailey Rd.
Visit the Hwy 95 Safety Improvement Projects project page for more details.
Hwy 149 High Bridge in St. Paul
- The Hwy 149 High Bridge is closed through December 2018. Primary Detour: Annapolis St. to Robert St to Kellogg Blvd to West 7th St. to Smith Ave/Hwy 149
- An Xcel Energy project is underway along Hwy 149/Dodd Rd. Motorists should anticipate the following traffic impacts due to project work: Hwy 149/Dodd Rd. traffic will be shifted and lanes will be narrowed from Hwy 110 to Lake Dr. to replace and relocate gas main through mid-August.
- There are several other road, lane and trail/sidewalk closures.
Visit the Hwy 149 High Bridge project page for details.
Hwy 169 in Belle Plaine, Jordan
- Hwy 169 is a single lane with head to head traffic traveling on the southbound lanes from south of Hwy 25 in Belle Plaine to Hwy 19 in Blakely Township through early August. Note: For business access, use Hwy 25.
- Hwy 169 is a single lane with head to head traffic traveling on southbound lanes from just south of Hwy 282 in Jordan to north of Hwy 25 in Belle Plaine through mid-September. Business Detour Map.
Visit the Hwy 169 in Belle Plaine, Jordan project page for more details.
Hwy 169 in Champlin
- All Hwy 169 traffic is a single lane in each direction on the southbound roadway between the Mississippi River and Hwy 610 through late September.
- 101st Ave. east of Hwy 169 is closed through September.
- The ramp from WB Hwy 610 to NB Hwy 169 will be closed through late September.
Visit the Hwy 169 in Champlin project page for more details.
Visit: mndot.gov/weekendtrafficimpacts
This map is meant to be a helpful
tool as you plan your weekend travel in the Twin Cities metro area. We welcome
your feedback on how we can best deliver this information.
And feel free to share this
Metro Weekend Traffic Impacts Map with your family and friends!
|