|
All lanes of Highway 19
west of Cannon Falls are expected to open to traffic on Friday, June 15 at 5 p.m.
now that construction to rehabilitate a bridge over Prairie Creek is completed.
The bridge located about 3.5 miles west of Highway 52
has new pavement on the bridge deck, new guardrail and the bridge rail was
repaired. Total cost of the project was $326,637.
Motorists had encountered a detour during
construction and we thank you again for your patience during that time. Those restrictions will be removed once striping of the highway
is completed Friday, June 15 (weather permitting).
MnDOT urges motorists to always be attentive, drive
with caution, slow down in work zones
and never enter a road blocked with barriers or cones.
Visit: http://www.dot.state.mn.us/d6/projects.html to learn about other construction projects in southeast Minnesota.
|