|
Welcome to the weekly construction updates for the 2025 road reconstruction project happening in your neighborhood. We want to keep you as updated as possible, so we will send these emails every Friday or as needed until construction is complete.
There are two neighborhood locations that are included with this project:
-
Greenhaven Neighborhood (Phase 1): Boone Avenue, 78th Avenue, Zealand Avenue, Aquila Avenue, Brooklyn Blvd
- Schedule: April 14 – October 15, 2025
-
Birch Grove Neighborhood (Phase 2): Abbott Avenue, York Avenue, 83rd Avenue
Construction Map
View map of the construction project
Here is the schedule of work the contractor plans to do within the next few weeks:
Greenhaven Neighborhood (Phase 1)
- The contractor will finish installing more gravel in the street today.
- Paving the first layer of asphalt on the streets will happen on Monday. Please do not park on the street or your vehicle will be towed.
- Asphalt driveways are tentatively schedule for 9/11 through 9/17.
- The contractor will work in the boulevards to clean up and level dirt.
- Mailboxes and irrigation systems will be installed starting the week of 9/15.
- Sodding and topsoil installation is scheduled to start the week of 9/22.
- Tree replacements: We hand delivered a letter for replacement options to those residents that had a tree removed due to construction. Please let us know what your choice is by next week Wednesday. The contractor needs to know so they can place their order with the tree nursery.
Birch Grove Neighborhood (Phase 2)
Garbage and Recycling Cans
If the contractor is working near your property on garbage or recycling day, we have requested that the contractor move your cans to an area where the haulers can have access to them. After the cans are emptied the contractor will bring your cans back to your property. Please, if you’re able to, put a piece of duct tape on your cans with your address to ensure you get your can back. If you’re not able to do this, the contractor will. Also, please have your cans out to the curbside the evening prior.
Irrigation Systems
If you have an irrigation system and haven’t contacted us yet, please do so as soon as possible.
Colorful Locate Flags and Wooden Survey Stakes
You will see these items in your yard during construction. The flags are marking locations of utilities such as gas, electric, TV, internet, and phone buried underground, so the contractor knows not to hit and damage those. The wooden stakes are survey informational points for the contractor to build the watermain, storm sewer, sanitary sewer and road. Please do not disturb any of these items or we’ll need to have them resurveyed which will cost money and delay the project. Thank you in advance!
Emergency contact after hours
If you have an emergency related to the project after work hours or on weekends, please call 911. The Police Department will notify the 24 hour on-call project superintendent from the contractor.
Construction Working Hours
Monday-Friday, 7 a.m. to 8 p.m.
Saturday, 8 a.m. to 7 p.m. (the contractor will try to not work on Saturdays)
Please note, dates are subject to change with weather and unforeseen construction obstacles. We will try to update you as soon as we know about them.
Questions?
Alex Moe (first point of contact) Project Inspector, City of Brooklyn Park 763-493-8113 Email Alex Moe
Jason Ives Project Manager, City of Brooklyn Park 763-493-8118 Email Jason Ives
|