2024 FQ Right of Way Project
Scope: Roadway resurfacing, re-striping, sidewalk repairs, installation of Americans with Disabilities Act (ADA)-compliant ramps, and driveway apron repairs
Locations:
- Gov. Nicholls Street: 600 – 1000 blocks
- Ursulines Avenue: 500 – 1000 blocks
- St. Philip Street: 600 – 1000 blocks
- St. Ann Street: 600, 900 – 1000 blocks
- St. Louis Street: 1100 block
- Madison Street: 600 block
- St. Peter Street: 700-1000 block
- Conti Street: 500 – 600 / 900 – 1100 blocks
- Clinton Street: 200 block
- Chartres Street: 100 – 600 / 800 – 1300 blocks
- Frenchmen Street: 400 – 600 blocks
- Burgundy Street: 2200 – 2500 blocks
- Decatur Street: 2200 – 2500 blocks
Status: Resurfacing is nearly complete, with most streets finished. The remaining work includes milling and paving on:
- Frenchmen Street (400 – 600 blocks)
- Iberville Street (Royal – N. Peters)
 |
|
2024 CBD Right of Way Project
Scope: Roadway resurfacing, re-striping, sidewalk repairs, installation of Americans with Disabilities Act (ADA)-compliant ramps, and driveway apron repairs
Locations:
- Old Poydras St (S. Broad - S. Galvez)
- Old Poydras St. (S. Galvez – Dead End)
- Perdido St. (S. Galvez St. – Claiborne Ave.)
- Perdido St. (Loyola Ave. – St. Charles Ave.)
- Gravier St. (LaSalle St. – Loyola Ave.)
- Union St. (S. Rampart St. – Carondelet St.)
- Natchez St. (Camp St – Tchoupitoulas St.)
- Maestri Pl. (St. Charles Ave. – Camp St.)
- Maestri Pl. (St. Charles Ave. – Camp St.)
- Girod St. (Loyola Ave. – Convention Center Blvd.)
- Howard Ave. (Loyola Ave. – Tivoli Circle)
- Prieur St. (Perdido St. – Tulane Ave.)
- Carondelet St. (Poydras St. – Canal St.)
- St. Charles Ave. (Poydras St. – Canal St.)
- Broad St. (Howard Ave.- Euphrosine St.)
- Johnson St. (Perdido St. – Tulane Ave.)
- Rampart St. (Canal St. – Tulane Ave.)
- Gaiennie St. (S. Peters St. – Convention Center Blvd.)
- John Churchill Chase St. (Annunciation St. – Dead End at Calliope St.)
- Poeyfarre St. (Annunciation St. – Magazine St.)
- Constance St. (John Churchill Chase St. – Andrew Higgins Blvd.)
Status: No milling or paving work was scheduled this week due to Super Bowl restrictions. Work will resume next week on the remaining five streets: Constance, Rampart, Dryades, and Poeyfarre. Striping will continue through next week. All concrete work has been completed.
|
Hotel Collapse Site Rehabilitation
Scope: Waterline installation, drainage upgrades, pavement, and sidewalk restoration
Status: The majority of work is complete. The remaining tasks include sidewalk repairs on Iberville Street and Canal Street, as well as striping on N. Rampart Street. Additionally, RTA grout repairs at the Canal and Rampart intersection are scheduled but will take place after Mardi Gras.
Downman Road / Lincoln Beach Project
Scope: Road resurfacing, striping, sidewalk repairs, and underground utility updates
Locations:
-
Downman Road: Chef Menteur Hwy to Seabrook Bridge
-
Lincoln Beach Blvd: Press Dr to France Rd
-
Providence Place: Press Dr to New York St
-
Leon C. Simon: Press Dr to Elysian Fields Ave
Status: Sidewalk and striping work on Downman Road is wrapping up.
- On Leon C. Simon Drive, crews continue to remove and replace concrete roadway panels between Elysian Fields to the Seabrook Bridge, with alternating lane closures in effect.
- Work on ADA ramps is underway between Elysian Fields and Press.
|
Scope: Repairing and upgrading concrete and specialty sidewalks (brick/stone)
Status:
-
Jackson Square: Next week crews will resume resetting broken stones and grouting areas where grout is missing. This work is expected to continue through the end of the month.
-
Barracks Street (Rampart – Decatur): Work is scheduled to begin Monday and will continue through the end of the month.
Please Help Us Get the Message Out
We want to ensure our updates reach as many people as possible, including Central Business District and French Quarter businesses, residents, hospitality workers, and more.
Please help us get the message out by sharing our weekly updates with your neighbors and staff. Feel free to post this information in your breakrooms or common areas.
If you know anyone or any group that would like to be added to our distribution list, please sign up here.
Stay Informed
To stay informed about street closures related to these repairs, sign up for the Department of Public Works Road Construction Alerts. Receive direct updates from the City of New Orleans on city-related road construction, including traffic notifications, road closures, and other impacts. Thank you for your patience and cooperation as we improve the streets of New Orleans.
Department of Public Works City of New Orleans 1300 Perdido Street | 6W03 New Orleans, LA 70112
|