2024 FQ Right of Way Project
Scope: Roadway resurfacing, re-striping, sidewalk repairs, installation of Americans with Disabilities Act (ADA)-compliant ramps, and driveway apron repairs
Locations:
- Gov. Nicholls Street: 600 – 1000 blocks
- Ursulines Avenue: 500 – 1000 blocks
- St. Philip Street: 600 – 1000 blocks
- St. Ann Street: 600, 900 – 1000 blocks
- St. Louis Street: 1100 block
- Madison Street: 600 block
- St. Peter Street: 700-1000 block
- Conti Street: 500 – 600 / 900 – 1100 blocks
- Clinton Street: 200 block
- Chartres Street: 100 – 600 / 800 – 1300 blocks
- Frenchmen Street: 400 – 600 blocks
- Burgundy Street: 2200 – 2500 blocks
- Decatur Street: 2200 – 2500 blocks
Status: Last week, crews milled Bienville and Conti streets between N. Peters and N. Front Street and completed sidewalk replacements in the 600–1000 blocks of Gov. Nicholls. Over the weekend, demolition work was performed on the Simon Bolivar Monument (Basin St.).
This week, paving operations are underway on Bienville and Conti, while Dumaine is scheduled for milling and paving in the 600–1000 blocks. Crews are also replacing sidewalks in the 600–1000 blocks of St. Philip St., milling Royal St. from 2800–4300, and removing the concrete and paving binder in the 600–700 blocks of Iberville.
2024 CBD Right of Way Project
Scope: Roadway resurfacing, re-striping, sidewalk repairs, installation of Americans with Disabilities Act (ADA)-compliant ramps, and driveway apron repairs
Locations:
- Old Poydras St (S. Broad - S. Galvez)
- Old Poydras St. (S. Galvez – Dead End)
- Perdido St. (S. Galvez St. – Claiborne Ave.)
- Perdido St. (Loyola Ave. – St. Charles Ave.)
- Gravier St. (LaSalle St. – Loyola Ave.)
- Union St. (S. Rampart St. – Carondelet St.)
- Natchez St. (Camp St – Tchoupitoulas St.)
- Maestri Pl. (St. Charles Ave. – Camp St.)
- Maestri Pl. (St. Charles Ave. – Camp St.)
- Girod St. (Loyola Ave. – Convention Center Blvd.)
- Howard Ave. (Loyola Ave. – Tivoli Circle)
- Prieur St. (Perdido St. – Tulane Ave.)
- Carondelet St. (Poydras St. – Canal St.)
- St. Charles Ave. (Poydras St. – Canal St.)
- Broad St. (Howard Ave.- Euphrosine St.)
- Johnson St. (Perdido St. – Tulane Ave.)
- Rampart St. (Canal St. – Tulane Ave.)
- Gaiennie St. (S. Peters St. – Convention Center Blvd.)
- John Churchill Chase St. (Annunciation St. – Dead End at Calliope St.)
- Poeyfarre St. (Annunciation St. – Magazine St.)
- Constance St. (John Churchill Chase St. – Andrew Higgins Blvd.)
Status: This week, paving is scheduled for the following streets: Gravier, Old Poydras, St. Charles, Girod, Natchez, Carondelet, Union, Gaiennie, and John Churchill Chase. The remaining streets to be milled and paved after the Super Bowl include: Constance, Rampart, Dryades, S. Johnson, and Poeyfarre. Concrete work is continuing.
Hotel Collapse Site Rehabilitation
 |
|
Scope: Waterline installation, drainage upgrades, pavement, and sidewalk restoration
Status: All streets (N. Rampart, Iberville Canal, and Burgundy) will be completed by the end of this week, with striping scheduled to begin on Thursday. No work will take place next week due to the Super Bowl. Remaining work, including granite sidewalk repairs on Canal Street and final grout repairs at Canal and Rampart, will resume after the Super Bowl.
|
Downman Road / Lincoln Beach Project
Scope: Road resurfacing, striping, sidewalk repairs, and underground utility updates
Locations:
-
Downman Road: Chef Menteur Hwy to Hayne Blvd
-
Lincoln Beach Blvd: Press Dr to France Rd
-
Providence Place: Press Dr to New York St
-
Leon C. Simon: Press Dr to Elysian Fields Ave
Status: Crews are expected to complete the remaining sidewalk work on Downman this week and will also begin striping the roadway. On Leon C. Simon between Franklin and Elysian Fields, crews have started removing and replacing concrete roadway panels. While this work is underway, westbound lane closures are anticipated to last through February 2025.
|
Scope: Repairing and upgrading concrete and specialty sidewalks (brick/stone)
Status:
-
Jackson Square: Crews are currently resetting broken stones and grouting areas where grout is missing. This work is expected to continue through the end of the month.
-
Barracks (Rampart to Dauphine): Concrete work on Barracks (from Rampart to Dauphine) will begin this week and is scheduled to last for two weeks.
-
Perdido (Loyola and S. Claiborne): Sidewalk and handicap accessibility work is set to begin this week and will continue through the end of February.
Please Help Us Get the Message Out
We want to ensure our updates reach as many people as possible, including Central Business District and French Quarter businesses, residents, hospitality workers, and more.
Please help us get the message out by sharing our weekly updates with your neighbors and staff. Feel free to post this information in your breakrooms or common areas.
If you know anyone or any group that would like to be added to our distribution list, please sign up here.
Stay Informed
To stay informed about street closures related to these repairs, sign up for the Department of Public Works Road Construction Alerts. Receive direct updates from the City of New Orleans on city-related road construction, including traffic notifications, road closures, and other impacts. Thank you for your patience and cooperation as we improve the streets of New Orleans.