Lane Closure Scheduled for Cherry Blossom Way/US 62 in Scott County
Concrete repair operations
LEXINGTON, Ky. (Dec. 15, 2025) – Concrete repair operations are necessary for a section of Cherry Blossom Way/US 62 in Scott County. One lane will remain open at all times.
Tuesday, Dec. 16 through Saturday, Dec. 20 – a closure will be in effect at 4 p.m. on Tuesday, Dec. 16 through Saturday, December 20 at 4 p.m.
Note: this is a 24/7 closure
Cherry Blossom Way/US 62 - Eastbound
- a right/slow lane closure will be in effect between milepoints 11.3 and 11.5
- one lane will remain open at all times
- this location is between the Interstate Overpass Bridges and the Walmart and Lowes intersection
All work and/or closures are scheduled on a tentative basis, and subject to change depending on weather conditions, emergencies and other factors beyond the control of the Department of Highways.
District 7 includes: Anderson, Bourbon, Boyle, Clark, Fayette, Garrard, Jessamine, Madison, Mercer, Montgomery, Scott and Woodford Counties
Keep up with the Kentucky Transportation Cabinet:
Navigate traffic with GoKY or via Waze on your smartphone!
###
|