Lane Closure Scheduled for Cherry Blossom Way/US 62 in Scott County
Concrete repair operations
LEXINGTON, Ky. (Dec. 5, 2025) – Concrete repair operations are necessary for a section of Cherry Blossom Way/US 62 in Scott County. One lane will remain open at all times.
Monday, December 8 through Friday, December 12 – 8 a.m. Monday until 4 p.m. Friday
- a right/slow lane closure will be in effect between milepoints 11.3 and 11.5
- one lane will remain open at all times
- this location is between the Interstate Overpass Bridges and the Walmart and Lowes intersection
All work and/or closures are scheduled on a tentative basis, and subject to change depending on weather conditions, emergencies and other factors beyond the control of the Department of Highways.
District 7 includes: Anderson, Bourbon, Boyle, Clark, Fayette, Garrard, Jessamine, Madison, Mercer, Montgomery, Scott and Woodford Counties
Keep up with the Kentucky Transportation Cabinet:
Navigate traffic with GoKY or via Waze on your smartphone!
###
|