Repairs scheduled for Interstate 75 in
Fayette County
District 7 Structures Personnel
LEXINGTON, Ky. (Sept. 15, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled bridge deck pothole repairs. The work will be located two miles south of Exit 120.
Interstate 75 – Southbound
Tuesday, Sept. 16 – 6 p.m. until 12 a.m.
- the right/slow lane will be closed at milepoint 118.3
- the location for operations will be two (2) miles south of Exit 120 (the two bridges over Kearney Road and Interstate 64)
Motorists in Kentucky may report potholes for state routes through the following:
- Toll free: 1-877-FOR-KYTC (1-877-367-5982)
"Contact Us" menu at the top of the KYTC website found here:http://transportation.ky.gov or via this link: https://bpm.kytc.ky.gov/appbuilder/forms?code=810A005056A2147711773A3B03F6EFEF&Process=PA-DV-ReportAPothole
All work and/or closures are scheduled on a tentative basis and subject to change depending on weather, emergencies and other factors beyond the control of the Department of Highways.
District 7 includes: Anderson, Bourbon, Boyle, Clark, Fayette, Garrard, Jessamine, Madison, Mercer, Montgomery, Scott and Woodford Counties
Keep up with the Kentucky Transportation Cabinet:
Navigate traffic with GoKY or via Waze on your smartphone!
|