Regional Street Sweeping Beginning on Sunday, April 6
Occasional single lane closures as contractors sweep narrow shoulders
COVINGTON, Ky. (April 2, 2025) – The Kentucky Transportation Cabinet (KYTC) District 6 Office advises motorists of street sweeping around our region beginning Sunday, April 6, between 6 p.m. and 6 a.m. Sweepers will be out Sunday night through Friday morning until the work is complete.
Street sweeping is done to remove potentially harmful materials. The sweeper collects debris, loose gravel, nails, metal, dirt, etc. all things that could impact motorists if they need to utilize the highway shoulder for an emergency. This work is performed once a month to clean and maintain highway shoulders along barrier walls, bridges and bicycle lanes.
Contractors will occasionally utilize a single lane closure for the sweeper to complete passes along narrow shoulders on I-71/75 and other needed areas.
Interstate locations:
- I-75 (143 – 192 mile marker; both directions): from the Ohio River to Grant/Scott county line. Sweeper will move through Boone, Kenton and Grant counties.
- I-471 (entire interstate, both directions): from the Ohio River to I-275 Interchange
- I-275 (entire interstate, both directions): from Ohio to Indiana. Sweeper will move through Boone, Kenton and Campbell counties
- I-71 (77.7 – 54.9 mile point): from the I-75 split in Boone County to Exit 55 (to KY 1039) to Vevay, Indiana, in Gallatin County
- KY 1039 (0.64 – 7 .11 mile point) in Gallatin County
Bike lane locations:
- Kenton County:
- KY 17 from I-275 Interchange to KY 16 in Independence
- Pride Parkway/Taylor Mill Road (KY 16) from I-275 Interchange to Klette Road (KY 2047)
- Turkeyfoot Road (KY 1303) from I-275 interchange to Richardson Road (KY 842) in Independence
- Boone County:
- Houston Road (KY 842) from Burlington Pike (KY 18) to Commonwealth Ave (KY 236) in Kenton County
- U.S. 42 from Pleasant Valley Road/Gunpowder Road (KY 237) to Ryle High School in Union.
- North Bend Road (KY 237) from I-275 interchange to Graves Road
Motorists should slow down and be aware of slow-moving equipment and potential lane closures during this mobile operation.
Weather permitting, this work should be completed by Friday, April 18.
The date, time, and duration of work may be adjusted if inclement weather or other unforeseen delays occur. Motorists can get Northern Kentucky road construction updates on the District 6 Roadshow. Follow KYTC District 6 on Facebook or Twitter. For Kentucky’s latest traffic and travel information, visit GoKy, TRIMARC, and WAZE.
###
|