ROADSHOW for The Week of March 5, 2023
New items or changes in project status are shown in bold
Inclement weather or other unforeseen circumstances may occur, so the information below is strictly of an advisory nature and is subject to change with no notice.
JEFFERSON COUNTY
-
I-Move Kentucky (I-64 / I-71 / I-265): Find the latest project updates here: https://i-moveky.com/.
-
Sherman Minton Bridge (I-64 & US 150 over the Ohio River between Louisville, KY, and New Albany, IN): Find the latest project updates here: https://shermanmintonrenewal.com/.
-
U.S. 31E (Bardstown Road/Baxter Avenue): Lane closures and delays are possible from Bonnycastle Avenue to Broadway for asphalt resurfacing and related work. Drivers will be directed through these work zones via flagging operations. Motorists take note: On-street parking will be restricted. This is part of an overall Highway Safety Improvement Program within the Bardstown Road corridor.
-
U.S. 31E (Bardstown Road): Expect southbound lane closures between 7 a.m. and 4 p.m. on Saturday, March 4, at Southpointe Boulevard for barrier wall removal. The contractor will have flaggers for traffic control. The intersection is being reconstructed to include dual turn lanes. The work is scheduled to be completed in summer 2023.
-
U.S. 31E/U.S. 150 (Buechel Bypass): Motorists should expect northbound and southbound lane closures and delays at a bridge over the Norfolk Southern Railroad tracks at mile point 10.4. One lane of traffic will remain open in both directions. The various closures were instituted after a February 2021 inspection found deterioration on one of the bridge’s pier caps. The repair was delayed as KYTC and the contractor sought approval from the railroad to work on the bridge section over the tracks. Much of the work is taking place under the bridge in an area not visible to motorists crossing the span. The repair is expected to be completed in spring 2023.
-
U.S. 42: Daily lane closures are possible from 9 a.m. to 3 p.m. at the set of I-71 overpass bridges (mile point 7). That’s between Seminary Drive and Mt. Rainier Drive. The contractor will first complete the work requiring a westbound lane closure before switching to the eastbound lane. The bearing pads are being replaced on the south side of both bridges. Electronic message boards will direct motorists through the work zone. The project is expected to be completed in spring 2023.
- U.S. 42 (Brownsboro Road): Minor lane closures from 9 a.m. to 3 p.m. through March 2023 from North Spring Street (mile point 0.587) to Chenoweth Lane (mile point 3.89) for sidewalk work. This work is being done in advance of an asphalt resurfacing project expected to be completed in fall 2023.
-
KY 1450 (Blue Lick Road): Weekday lane closures are possible between I-265 (Gene Snyder Freeway) and KY 61 (Preston Highway) for road widening work. Traffic will be shifted to the new roadway lanes between 9 a.m. and 12 p.m. on Monday, March 6, beginning at the south end of the project near I-265 and ending at KY 61. Flaggers will be moving traffic to the new section in phases. The new signal at Foreman Lane will be activated as well. The existing diversion pavement will begin to be removed after this shift. Delays likely; plan commute accordingly. The project is expected to be completed in summer 2023.
- KY 1694 (Brownsboro Road): Flaggers are possible from 9 a.m. to 3 p.m. from Tuesday, March 7, through Friday, March 10, near Norton Commons or mile point 0.6. Surveyors will be in and around the roadway. No detours will be posted but motorists are advised to use caution.
-
South Pope Lick Road: Road closed to thru traffic between KY 155 (Taylorsville Road) and Rehl Road. Local access only. Motorists should follow posted detours. The closure to thru traffic is for the reconstruction of the KY 155 and South Pope Lick Road intersection and bridge over Pope Lick Creek. The project is expected to be completed in fall 2023.
BULLITT COUNTY
-
I-65 North: Sound barrier walls being constructed between mile points 117.4 and 117.8, just north of Exit 117 for KY 44 to Shepherdsville and Mt. Washington. Message boards will warn motorists to watch for trucks entering and exiting the interstate. The project is estimated to be completed in spring 2023.
-
KY 44 (Old Mill Road): Daily lane closures possible between Bluegrass Way and Love Avenue for the construction of a left turn lane and relocation of a waterline at Bullitt East High School in Mt. Washington (mile point 23.7). Motorists may be directed through the work zone via flagging operations as construction progresses. Striping changes will occur on Tuesday, March 7, narrowing the existing lanes to begin the widening process. New striping and barrels will be in place throughout the project. Work will take place between 9 a.m. and 2 p.m. The project is expected to be completed in late summer 2023.
-
KY 44 @ Bogard Lane: Weekday lane closures and delays are possible at the intersection of KY 44 (Old Mill Road) and Bogard Lane (mile point 18.580). A new traffic signal is being installed at this location. Motorists will be directed through the work zone via flagging operations. The project is expected to be completed in spring 2023.
-
KY 61 @ KY 2553: Weekday lane closures and delays are possible at the intersection of KY 61 (Preston Highway) and KY 2553 (Old Preston Highway). A new traffic signal is being installed at this location. Motorists will be directed through the work zone via flagging operations. The project is expected to be completed in spring 2023.
-
KY 480 (Cedar Grove Road): Weekday lane closures and delays are possible between Omega Parkway and Park Loop Road/Valley View Drive for work involving the road widening project. Traffic will be shifted to the new pavement before 3 p.m. on Wednesday, March 8. Flaggers will be moving traffic to the new roadway as striping changes are completed. Removal of the existing roadway will begin following this shift. Delays likely; plan commute accordingly. The project is expected to be completed in fall 2023.
-
KY 2723 (Raymond Road): Periodically closed during the daytime and evening from Monday, March 6, through Friday, March 10, from the intersection of Chillicoop Road and continuing south to KY 44. Crews replacing multiple cross drains.
FRANKLIN COUNTY
-
I-64 East & West: Daily lane shifts, rolling roadblocks and traffic delays are possible between mile marker 47 and mile marker 52 for an ongoing bridge replacement project. Oversized vehicles are alerted to an 11-inch width restriction for both eastbound and westbound directions in the construction zone. These vehicles can utilize U.S. 60 and U.S. 127 as a detour. The four sets of bridges being replaced are over KY 2817 (Cardwell Lane) at mile point 51.5; KY 151 (Graefenburg Road) at mile point 46.4, South Benson Creek at mile point 49.1 and KY 1665 (Evergreen Road) at mile point 49.8. Flagging operations will be required at times on KY 151, KY 1665 and KY 2817. The project is expected to be completed in late fall 2023.
-
U.S. 60 (Versailles Road): Lane closures and delays possible between Jett Boulevard/Chenault Road and KY 1681 (Duncan Road) at the I-64 interchange. Motorists are encouraged to use caution while traveling through the work zone. The route is being widened for additional left-turn lanes to the Interstate 64 eastbound and westbound on-ramps. Another right-turn lane will also be constructed on the I-64 westbound off-ramp to U.S. 60. The project is expected to be completed in winter 2022-’23.
-
KY 1659 (Glenns Creek Road/McCracken Pike): Full roadway closure due to 500-foot slide caused by heavy rain and flooding. The slide is between Glenns Creek Road/McCracken Pike/KY 1659 (mile marker 1) and Harrod Carter Concrete (mile marker 2) in Franklin County. Motorists should follow the signed detour: Duncan Road/KY 1681 to Versailles Road/U.S. 60 (in Woodford County) to the East-West Connector/KY 676 (in Franklin County). KYTC anticipates soliciting bids for the repair project this winter with the goal of starting construction in summer 2023.
HENRY COUNTY
-
KY 146 (LaGrange Road): Traffic may be reduced to one lane during daytime hours from KY 153 (Lake Jericho Road) at mile points 2.169 to Broko Lane at mile points 5.333. That’s between Pendleton and New Castle. This is a widening and realignment project. Motorists will be directed through the work zone via flagging operations and are encouraged to use caution. The project is expected to be completed in fall 2024.
OLDHAM COUNTY
-
I-71 South: Possible shoulder closures between mile marker 21 and mile marker 20 for the construction of a new interchange at KY 2857 (LaGrange Parkway) between KY 53 and KY 393. Motorists should proceed with caution and heed the 55 mph speed limit thru work zone. The construction is expected to be completed in fall 2024.
-
KY 53: Safety improvements will take place between KY 55 in Shelby County and KY 22 in Oldham County. The construction includes widening shoulders, extension of culvert pipes, ditch cleaning and tree clearing. KY 53 may be reduced to one lane of traffic during the project. Motorists will be directed through the work zone via flagging operations and temporary traffic signals. There are no time restrictions on daily lane closures. The project is expected to be completed in Fall 2023.
SHELBY COUNTY
-
KY 53: Safety improvements will take place between KY 55 in Shelby County and KY 22 in Oldham County. The construction includes widening shoulders, an extension of culvert pipes, ditch cleaning and tree clearing. KY 53 may be reduced to one lane of traffic during the project. Motorists will be directed through the work zone via flagging operations and temporary traffic signals. There are no time restrictions on daily lane closures. The project is expected to be completed in Fall 2023.
-
KY 53 (Mt. Eden Road): Possibly delays and lane shifts between St. Regis Drive at mile point 6.4 and U.S. 60 at mile point 8 as work continues to widen that section of the roadway. The project is expected to be completed in spring 2023.
-
KY 55: Safety improvements will take place between KY 155 in Spencer County and KY 148 (Finchville Road) in Shelby County. The construction includes widening shoulders, an extension of culvert pipes, ditch cleaning and tree clearing. The project also includes curve realignments. KY 55 may be reduced to one lane of traffic during the project. Motorists will be directed through the work zone via flagging operations and temporary traffic signals. There are no time restrictions on daily lane closures. The project is expected to be completed in summer 2023.
SPENCER COUNTY
-
KY 44 (Little Mount Road): Traffic reduced to one lane in each direction, via crossovers, on KY 44 (Little Mount Road) between Spencer County High School and Early Wyne Drive for bridge repairs to the span over Brashears Creek. The project is expected to be completed in spring 2023.
-
KY 55: Safety improvements will take place between KY 155 in Spencer County and KY 148 (Finchville Road) in Shelby County. The construction includes widening shoulders, an extension of culvert pipes, ditch cleaning and tree clearing. The project also includes curve realignments. KY 55 may be reduced to one lane of traffic during the project. Motorists will be directed through the work zone via flagging operations and temporary traffic signals. There are no time restrictions on daily lane closures. The project is expected to be completed in summer 2023.
TRIMBLE COUNTY
WORK ZONE TIPS
- Expect the unexpected.
- Slow down.
- Don’t tailgate. Keep a safe distance between you and the car ahead of you.
- Keep a safe distance between your vehicle and the construction workers and equipment.
- Pay attention to the signs.
- Obey road crew flaggers.
- Stay alert and minimize distractions.
- Keep up with the traffic flow.
- Navigate traffic with GoKY or via Waze on your smartphone!
- You can follow us on the social media links below.
- Knowing where the construction zones are prior to the trip can minimize frustration and delays.
- Be patient and stay calm.
* Pothole patching, sweeping, drain & ditch cleaning, striping, pavement marking and maintenance crews may work on major interstates in the Louisville Metro area only during non-peak daytime hours and at night. Motorists should watch for roadside maintenance on interstates and highways throughout the rest of the district daily.
Get road construction updates on KYTC District 5 web page. Follow KYTCDistrict5 on our Facebook page or on our Twitter page.
###
|