|
 BNSF to close crossings for repairs
BNSF Railway’s downtown crossings are scheduled to close for repairs next month.
The Main Street crossing will be closed from 7 a.m. Aug. 6 through 5 p.m. Aug. 16.
Following that work, the Broadway crossing will be closed from 7 a.m. Aug. 19 to 5 p.m. Aug. 23.
Detour routes will be posted. Be sure to allow extra time for your alternate route, especially with back-to-school traffic.
|
|
|
|