State Road 912 to have alternating lane closures
LAKE COUNTY, Ind. - The Indiana Department of Transportation announces the start of two projects on State Road 912 between U.S. 41/Calumet Ave and Ridge Rd (south of the I-94 interchange) next week resulting in alternating lane closures and changing traffic configurations through the fall.
Pavement replacement will take place between U.S. 41/Calumet Ave and U.S. 12 starting on or after Monday, April 24. Work will begin with shoulder strengthening under lane closures for future phases. Alternating lane closures and ramp closures will be needed during construction.
Concrete pavement restoration and bridge deck overlay projects will take place between Ridge Rd and 169th St starting on or after Wednesday, April 26. State Road 912 will be reduced to one lane in each direction, and the eastbound I-94 loop ramp to northbound State Road 912 will be reduced to one lane. Work will be conducted in phases.
Motorists should be prepared for changing traffic patterns in the area. INDOT encourages drivers to allow extra time when driving through this area and follow traffic directions carefully. Motorists should slow down, exercise caution and drive distraction-free through all work zones.
Stay Informed Motorists in Northwest Indiana can monitor road closures, road conditions, and traffic alerts any time via:
About the Indiana Department of Transportation INDOT continues to solidify the Hoosier State as the Crossroads of America by implementing Gov. Eric J. Holcomb’s $30 billion Next Level Roads plan. With six district offices and 3,500 employees, the agency is responsible for constructing and maintaining more than 29,000 lane miles of highways, more than 5,700 bridges, and supporting 4,500 rail miles and 127 aviation facilities across the state. INDOT was recently ranked #1 in the United States for infrastructure in CNBC’s 2022 “America’s Top States for Business” ranking. Learn more about INDOT at in.gov/indot.
|