For Immediate Release: Feb. 10, 2023 23-0049
OAHU LANE CLOSURES
FOR THE WEEK OF FEB. 11 – FEB. 17
PLEASE NOTE:
Lane closure schedules may change at any time without further notice. All projects are weather permitting.
--- H-1 FREEWAY ---
1) HALAWA (NIGHT WORK)
Right lane closure on the H-1 Freeway in both directions between the Aiea Heights Drive overpass and Salt Lake Boulevard underpass on Monday, Feb. 13, through Friday, Feb. 17, from 9 p.m. to 4 a.m., for roadwork.
2) HONOLULU (NIGHT WORK)
Full closure of the H-1 Freeway in the eastbound direction between the Punahou Street overpass and the Kapiolani Interchange on Monday night, Feb. 13, through Friday morning, Feb. 17, from 7:30 p.m. to 4:30 a.m., for resurfacing work.
3) HONOLULU
Two right lane closures on the H-1 Freeway in the westbound direction between the Pearl Harbor Interchange and Salt Lake Boulevard underpass on Monday, Feb. 13, through Friday, Feb. 17, from 8 p.m. to 2:30 a.m., for guardrail installations.
4) HONOLULU (WEEKEND/NIGHT WORK)
Lane closure on the Middle Street/Dillingham Boulevard offramp (Exit 18B) from the H-1 Freeway in the eastbound direction on Sunday, Feb. 12, through Friday, Feb. 17, from 8 p.m. to 5 a.m., for The Rail project.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
5) HONOLULU (NIGHT WORK)
Closure of the Airport offramp (Exit 16) from the H-1 Freeway in the eastbound direction, on Monday, Feb. 13, through Friday, Feb. 17, from 8 p.m. to 4 a.m., for The Rail project.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
6) KAPOLEI TO AINA HAINA (NIGHT WORK)
Lane shifts on the H-1 Freeway in both directions from Ainakoa Avenue to Kapolei Interchange on Monday, Feb. 13, through Friday, Feb. 17, from 9 p.m. to 4 a.m., for drain inspection and cleaning.
7) WAIMALU (WEEKEND WORK)
Three right lane closures on the H-1 Freeway in the eastbound direction in the vicinity of the Kaahumanu Street overpass, for attenuator maintenance.
- Lanes closed on Sunday, Feb. 12, from 1 a.m. to 9 a.m.
- Lanes closed on Thursday, Feb. 16, from 8:30 a.m. to 12:30 p.m.
--- H-2 FREEWAY ---
1) MILILANI TO WAIKELE
Right lane closure on the H-2 Freeway in the northbound direction between the H-1 Freeway and Meheula Parkway overpass on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for asphalt work.
2) MILILANI (NIGHT WORK)
Left lane closure on the H-2 Freeway in the northbound direction between Meheula Parkway overpass and Wilikina Drive on Monday, Feb. 13, through Friday, Feb. 17, from 8 p.m. to 5 a.m., for striping work.
--- H-201 MOANALUA FREEWAY ---
1) HALAWA
Left lane closure on the H-201 Moanalua Freeway in the eastbound direction between Aiea Access Road and Kahuapaani Street overpass on Tuesday, Feb. 14, from 8:30 a.m. to 12:30 p.m., for trouble shooting street lights.
2) HALAWA
Left lane closure on the H-201 Moanalua Freeway between the H-3 Freeway and Funston Road overpass on Monday, Feb. 13, through Friday, Feb. 17, for road improvements.
- Eastbound closure scheduled from 9 a.m. to 3 p.m.
- Westbound closure scheduled from 8:30 a.m. to 3 p.m.
3) MOANALUA
Left lane closure on the H-201 Freeway between Puuloa Road and Funston Road overpasses on Monday, Feb. 13, through Friday, Feb. 17, for street light repair.
- Eastbound lane closed from 9 a.m. to 3 p.m.
- Westbound lane closed from 8:30 a.m. to 2:30 p.m.
4) MOANALUA (WEEKEND/NIGHT WORK)
Two left lane closures on the H-201 Freeway in both directions between the Puuloa Road overpass and Funston Road overpass on Sunday, Feb. 12, through Friday, Feb.17, from 7 p.m. to 4 a.m., for lighting work.
5) MOANALUA
Right lane closure on the H-201 Freeway in the westbound direction between Ahua Street overpass and Ala Napunani Street on Monday, Feb. 13, through Friday, Feb. 17, from 9 a.m. to 3 p.m., for street light repair.
6) MOANALUA (WEEKEND/NIGHT WORK)
Two left lane closures on the H-201 Freeway in the westbound direction between the Funston Road overpass and Halawa Interchange on Sunday, Feb. 12, through Friday, Feb.17, from 7 p.m. to 4 a.m., for lighting work.
7) MOANALUA (WEEKEND/NIGHT WORK)
Left lane closure on the H-201 Freeway in the eastbound direction in the vicinity of the Puuloa Road overpass on Sunday, Feb. 12, through Friday, Feb.17, from 7 p.m. to 4 a.m., for lighting work.
8) MOANALUA (WEEKEND/NIGHT WORK)
Two left lane closures on the H-201 Freeway in the eastbound direction between the H-3 Freeway onramp and the Ala Napunani Street overpass on Sunday, Feb. 12, through Friday, Feb. 17, from 7 p.m. to 4 a.m., for road improvements.
9) MOANALUA
Left lane closure on the H-201 Moanalua Freeway in the eastbound direction between the Puuloa Road overpass and Ahua Street overpass on Monday, Feb. 13, through Friday, Feb. 17, from 9 a.m. to 3 p.m., for road repairs.
--- H-3 FREEWAY ---
1) KANEOHE
Right lane closure on the H-3 Freeway in both directions in the vicinity of the Harano Tunnel on Monday, Feb. 13, from 8:30 a.m. to 12:30 p.m., for camera installations.
2) KANEOHE
Right lane closure on the H-3 Freeway in the eastbound direction in the vicinity of the Harano Tunnel on Thursday, Feb. 16, from 8:30 a.m. to 12:30 p.m., for preventative maintenance.
3) KANEOHE
Right lane closure on the H-3 Freeway in the westbound direction in the vicinity of the Harano Tunnel on Tuesday, Feb. 14, from 9 a.m. to 1 p.m., for preventative maintenance.
--- FARRINGTON HIGHWAY (ROUTES 93/99/930) ---
1) MAKAHA
Lane shift on Farrington Highway in both directions between Upena Street and Kili Drive on Tuesday, Feb. 14, from 8:30 a.m. to 3 p.m., for foundation work of the bridge.
2) WAIANAE (NIGHT WORK)
Right lane closure on Farrington Highway (Route 93) in both directions between Maipalaoa Road and Manununu Street on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for bridge work. https://hidot.hawaii.gov/blog/2022/12/16/nighttime-closure-of-westbound-farrington-highway-at-maipalaoa-bridge-monday-dec-19/
3) WAIPAHU
Roving lane closure on Farrington Highway (Route 99) in both directions between Fort Weaver Road and the H-1 Freeway Overpass (near Leeward Community College), on Monday, Feb. 13, through Friday, Feb. 17, and Friday, Nov. 25, from 8:30 a.m. to 3 p.m., for landscaping work.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
--- KAHEKILI HIGHWAY (ROUTE 83) ---
1) KANEOHE
Lane closure on Kahekili Highway in both directions between Hui Iwa Street and Ahuimanu Place on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for paving work. Traffic will be contraflowed.
2) KANEOHE
Lane closure on Kahekili Highway in both directions between Haiku Road and Likelike Highway on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for striping work.
— KALANIANAOLE HIGHWAY (ROUTES 61/72) —
1) KAILUA
Lane closure on Kalanianaole Highway (Route 61) in both directions between Kamehameha Highway and Auloa Road on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for striping work.
2) KAILUA
Right lane closure on Kalanianaole Highway (Route 61) in the eastbound direction between Kamehameha Highway and Uluhala Street on Monday, Feb. 13, through Tuesday, Feb. 14, from 8:30 a.m. to 3 p.m., for crack sealing.
3) WAIMANALO
Lane closures on Kalanianaole Highway (Route 72) in both directions between Aloiloi Street and Poalima Street on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for sidewalk, drainage, and guardrail work.
--- KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) ---
1) AIEA
Lane shifts on Kamehameha Highway (Route 99) in both directions in the vicinity of Aiea Kai Place on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for crosswalk installations.
2) AIEA
Left lane closure on Kamehameha Highway (Route 99) in the eastbound direction between Laulima Street and Uahi Street on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for utility work.
3) HALEIWA (NIGHT WORK)
Roving lane closure on Kamehameha Highway (Route 99) in both directions between Nui Avenue and Weed Circle on Monday, Feb. 13, through Friday, Feb. 17, from 8 p.m. to 4:30 a.m., for maintenance work.
4) HALEIWA
Right lane closure on Kamehameha Highway (Route 83) in both directions between Weed Circle and Plantation Road on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for mowing.
5) HALEIWA
Roving lane closure on Kamehameha Highway (Route 83) in both directions in the vicinity of Weed Circle on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 1:30 p.m., for maintenance.
6) HAUULA
Roving lane closure on Kamehameha Highway (Route 83) in both directions between Hauula Homestead Road and Aakahi Gulch Road on Monday, Feb. 13, through Friday, Feb. 17, from 8 a.m. to 2:30 p.m., for maintenance work.
7) HAUULA
Roving lane closure on Kamehameha Highway (Route 83) in both directions between Kahikole Place and Aakahi Gulch Road on Monday, Feb. 13, through Tuesday, Feb. 14, from 8:30 a.m. to 3 p.m., for installation of speed tables.
8) HAUULA
Alternating lane closure on Kamehameha Highway (Route 83) in both directions between Imua Place and Kawaipuna Street on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for electrical and waterline work.
9) KAAAWA
Right lane closure on Kamehameha Highway (Route 83) in the northbound direction between Hiiaka Road and Kaaawa Park Lane on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 2:30 p.m., for guardrail repairs.
10) KAAAWA
Right lane closure on Kamehameha Highway (Route 83) in the northbound direction between Lau Place and Trout Farm Road on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 2:30 p.m., for guardrail repairs.
11) KAAAWA
Lane closure on Kamehameha Highway (Route 83) in both directions between Waikane Valley Road and Kaaawa Valley Road on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 1:30 p.m., for shoulder repairs.
12) KALIHI (24/7 CLOSURE)
Kamehameha Highway between Middle Street and Laumaka Street will be reduced to one westbound and one eastbound lane 24-hours a day, seven days a week, for The Rail. Other adjustments to the area include:
- No left turns from Kamehameha Highway will be allowed.
- Pedestrian access will be maintained.
- Driveway and Business access will be maintained.
- The H-1 eastbound off-ramp to Dillingham Blvd. will be reduced to one lane. Middle Street southbound left turn reduced to single turn lane.
- The sidewalk on the makai side of Dillingham Boulevard between Puuhale Road and Mokauea Street will be closed 24/7 with pedestrians rerouted to the mauka sidewalk.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
13) KANEOHE
Left lane closure on Kamehameha Highway (Route 83) in the southbound direction in the vicinity of Kaneohe Bay Drive on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3:30 p.m., for soil testing.
14) KANEOHE
Roving lane closure on Kamehameha Highway (Route 83) in both directions in the vicinity of Koolau View Drive on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 2:30 p.m., for sign installations.
15) PUPUKEA
Lane closure on Kamehameha Highway (Route 83) in both directions between Waimea Valley Road and Dairy Road on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for manhole work.
16) PUPUKEA
Alternating lane closure on Kamehameha Highway (Route 83) in both directions in the vicinity of Kapuhi Street on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 2:30 p.m., for storm drain cleaning.
17) SALT LAKE (NIGHT WORK)
Lane shifts on Kamehameha Highway (Route 99) in both directions between Radford Drive and Center Drive on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 5 p.m., and from 8 p.m. to 5 a.m., for The Rail project.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
18) WAHIAWA (NIGHT WORK)
Lane closure on Kamehameha Highway (Route 80) in both directions between Olive Avenue and Kilani Avenue on Monday, Feb. 13, through Friday, Feb. 17, from 9 p.m. to 4:30 a.m., for striping.
19) WAHIAWA (NIGHT WORK)
Lane closure on Kamehameha Highway (Route 83) in both directions in the vicinity of Plantation Road on Monday, Feb. 13, through Friday, Feb. 17, from 8 p.m. to 4:30 a.m., for paving work.
--- LIKELIKE HIGHWAY (ROUTE63) ---
1) KANEOHE TO KALIHI (WEEKEND/NIGHT WORK)
Closure of Likelike Highway in the southbound direction between the Wilson Tunnel and Valley View Drive on Sunday, Feb. 12, through Friday, Feb. 17, from 7 p.m. to 5 a.m., for pavement preservation work. Use alternate routes.
2) KANEOHE
Roving lane closure on Likelike Highway in both directions between the H-3 Freeway and Kahekili Highway on Monday, Feb. 13, through Friday, Feb. 17, from 7:30 a.m. to 12:30 p.m., for pothole repairs.
--- NIMITZ HIGHWAY (ROUTE 92) ---
1) HONOLULU
Shoudler closure on the Nimitz Highway in both directions between Ahua Street and Middle Street on Monday, Feb. 13, through Friday, Feb. 17, from 8 a.m. to 4 p.m., for resurfacing of the Nimitz Bike Path.
2) HONOLULU (NIGHT WORK)
Right and left turn pockets closed on Nimitz Highway in both directions onto Halekauwila Street on Monday, Feb. 13, through Friday, Feb. 17, over a 24-hour period, for The Rail work.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
3) HONOLULU
Two right lane closures on Nimitz Highway in the eastbound direction in the vicinity of Aolele Street on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for The Rail work.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
4) HONOLULU
Two right lane closures on Nimitz Highway in the eastbound direction in the vicinity of Sand Island Access Road on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for The Rail work.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
— PALI HIGHWAY (ROUTE 61) —
1) HONOLULU
Alternating lane closure on the Pali Highway in the Kailua-bound direction between Pauoa Road and Vineyard Boulevard on Monday, Feb. 13, through Friday, Feb. 17, from 7 a.m. to 3 p.m., for concrete work.
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
2) NUUANU
Lane closure on the Pali Highway in the Kailua-bound direction between the Wylie Street overpass and Nuuanu Pali Drive on Monday, Feb. 13, through Friday, Feb. 17, from 7 a.m. to 3 p.m., for joint work.
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
3) NUUANU
Two lane closures on the Pali Highway in the Kailua-bound direction between Wylie Street overpass and Nuuanu Pali Drive on Monday, Feb. 13, through Friday, Feb. 17, from 8 a.m. to 3 p.m., for resurfacing work.
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
4) NUUANU
Alternating lane closure on the Pali Highway in the Kailua-bound direction between the Pauoa Road overpass and Wylie Street overpass on Monday, Feb. 13, through Friday, Feb. 17, from 7 a.m. to 3 p.m., for concrete work.
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
5) NUUANU
Lane closure on the Pali Highway in both directions between Vineyard and Milo Lane on Monday, Feb. 13, through Friday, Feb. 17, from 9 a.m. to 3 p.m., for electrical, striping, and manhole work.
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
6) NUUANU
Lane closure on the Pali Highway in the southbound direction between Wylie Street and Nuuanu Pali Drive on Monday, Feb. 13, through Friday, Feb. 17, from 9 a.m. to 6 p.m., for crack sealing.
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
—ALA MOANA BOULEVARD —
1) HONOLULU
Alternating lane closure on Ala Moana Boulevard in both directions between Ward Avenue and Ala Moana Park Drive on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for utility work.
—VINEYARD BOULEVARD —
1) HONOLULU
Lane closure on Vineyard Boulevard in both directions between Nuuanu Avenue and Punchbowl Street on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for the Pali Highway project.
2) HONOLULU (NIGHT WORK)
Full closure of Vineyard Boulevard in the eastbound direction between Miller Street and the H-1 Freeway onramp on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 p.m. to 4:30 a.m., for pavement preservation work.
--- SAND ISLAND PARKWAY ---
1) SAND ISLAND (WEEKEND/NIGHT WORK)
Right lane closure on Sand Island Parkway in the southbound direction at the Bascule bridge, on Sunday, Feb. 12, through Friday, Feb. 17, from 9 p.m. to 5 a.m., for utility maintenance.
--- LAGOON DRIVE ---
1) HONOLULU (NIGHT WORK)
Right lane closure on Lagoon Drive in the northbound direction between Aolele Street and Waiwai Loop on Monday, Feb. 13, through Friday, Feb. 17, from 7 a.m. to 5 p.m., and from 8 p.m. to 4 a.m., for The Rail work.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
--- ALA AUANA STREET ---
1) HONOLULU (NIGHT WORK)
Closure of Ala Auana Street in both directions between Ala Onanona Street and Rodgers Boulevard on Monday, Feb. 13, through Friday, Feb. 17, from 8 p.m. to 5 a.m., for The Rail project. Motorists will be detoured.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299
— KALIHI STREET —
1) KALIHI (NIGHT WORK)
Lane closure on Kalihi Street in both directions in the vicinity of Dillingham Boulevard on Monday, Feb. 13, through Friday, Feb. 17, from 7 p.m. to 5 a.m., for The Rail work.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
--- UALENA STREET ---
1) HONOLULU (NIGHT WORK)
Full closure of Ualena Street nightly Monday, Feb. 13, through Friday, Feb. 17, from 8 p.m. to 4 a.m., for The Rail. Motorists and pedestrians will be detoured and on street parking will not be allowed.
One-way traffic in the westbound direction will take place daily, from 4 a.m. to 8 p.m.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299
— FORT BARRETTE ROAD —
1) KAPOLEI
Center lane closure on Fort Barrette Road in the northbound direction between Kamaaha Avenue and Makakilo Drive on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for utility work.
— FORT WEAVER ROAD —
1) EWA
Center lane closure on Fort Weaver Road in both directions in the vicinity of the H-1 Freeway onramp on Tuesday, Feb. 14, from 8:30 a.m. to 12:30 p.m., for attenuator maintenance.
2) EWA
Center lane closure on Fort Weaver Road in the eastbound direction in the vicinity of the H-1 Freeway onramp on Wednesday, Feb. 15, from 8:30 a.m. to 12:30 p.m., for attenuator maintenance.
— HALAWA HEIGHTS ROAD —
1) AIEA
Lane closure on Halawa Heights Road in both directions between Ulune Street and Elrod Road on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 3 p.m., for raised crosswalks.
— KAUKONAHUA ROAD —
1) WAIALUA
Right lane closure on Kaukonahua Road in both directions in the vicinity of Thompson Corner on Monday, Feb. 13, through Friday, Feb. 17, from 8:30 a.m. to 2:30 p.m., for storm drain cleaning.
###
|