|
Department of Transportation
DAVID Y. IGE GOVERNOR
JADE T. BUTAY DIRECTOR
|
|
For Immediate Release: Aug. 20, 2020 20-0396
WAILUA BEACH PARKING OFF KUHIO HIGHWAY TO CLOSE TEMPORARILY FOR BRIDGE REPAIR PROJECT
LIHUE — The Hawaii Department of Transportation (HDOT) is constructing additional protective measures at the Wailua River Bridge (Mauka Bridge) on Kuhio Highway (Route 56). The Wailua Beach Park lot makai (oceanside) of Kuamoo Road will be used as a staging area for the work and will be closed to the public starting Monday, Aug. 24.
The protective measures will include the installation of rip rap to protect the existing bridge piers and north abutment. The Wailua River Bridge was damaged during the heavy rains on March 27 and 28, 2020. This work will complement the scour countermeasures installed following the April 2018 floods that largely protected the piers on which they were installed.
HDOT anticipates needing the parking lot for a period of five to six weeks.
###
|
|
|
|