For Immediate Release: Jan. 3, 2020 20-0009
OAHU LANE CLOSURES
FOR THE WEEK OF JANUARY 4 - 10
PLEASE NOTE:
Lane closure schedules may change at any time without further notice. All projects are weather permitting.
--- H-1 FREEWAY ---
1) AIRPORT VIADUCT (NIGHT WORK)
Nightly closures of up to three lanes of the H-1 Freeway in both directions between the Pearl Harbor Hickam Offramp and the Dillingham Boulevard/Middle Street Offramp (Exit 18B) for bridge inspections Tuesday, Jan. 7 through Friday, Jan. 10 from 9 p.m. to 4 a.m. Onramps and Offramps within the closure area may be impacted. See https://hidot.hawaii.gov/blog/2019/12/31/night-work-on-the-airport-viaduct-for-bridge-inspection-scheduled-jan-7-9/
2) AIRPORT VIADUCT (HART WORK)
Closure of the far-right lane of the eastbound H-1 Freeway between the vicinity of Elliott Street and Aolele Street from 8 p.m. to 5 a.m. the week of Jan. 6 – 10. This work has been coordinated with our nightly closure for bridge inspections (see No. 1 above).
3) AIRPORT (HART WORK)
Closure of the Aolele Street/Paiea Street Offramp from the eastbound H-1 Freeway from 8 p.m. to 5 a.m. the week of Jan. 6 – 10.
4) KAPOLEI (NIGHT WORK)
Nightly full closure of eastbound H-1 Freeway between the Campbell Industrial Park/Barbers Point Harbor Offramp (Exit 1A) and the Wakea Street Onramp Monday, Jan. 6 through Friday, Jan. 10 from 9 p.m. to 4:30 a.m. for the Kapolei Interchange Project. Details at https://hidot.hawaii.gov/blog/2020/01/03/nightly-closures-of-the-h-1-freeway-at-the-kapolei-interchange-monday-jan-6-through-friday-jan-10/
--- H-2 FREEWAY ---
1) WAHIAWA
Right lane closure on southbound H-2 Freeway between Wilikina Drive and the Leileihua Golf Course Monday, Jan. 6 to Wednesday, Jan. 8 from 8:30 a.m. to 3 p.m. for installation of an impact attenuator to guardrail.
2) WAIPIO
Right lane closure on southbound H-2 Freeway in the vicinity of Lumipolu Street in Waikele to the H-1/H-2 Merge Monday, Jan. 6 to Wednesday, Jan. 8 from 8:30 a.m. to 3 p.m. for installation of an impact attenuator to guardrail. Lane on offramp to the H-1 may be shifted.
--- H-3 FREEWAY ---
1) HALAWA TO KANEOHE
Moving shoulder closure in both directions on the H-3 Freeway between the Kahuapaani Street Underpass and the end of the H-3 Freeway in Kaneohe on Monday, Jan. 6 from 9 a.m. to 11 a.m. for street sweeping and debris removal.
2) HALAWA
Right lane closed in the Halawa-bound direction on the H-3 Freeway from the Harano Tunnels to the Kahuapaani Street Underpass in Halawa Tuesday, Jan. 7 from 8:30 a.m. to 12:30 a.m. for maintenance.
--- H-201 MOANALUA FREEWAY ---
1) AIEA (NIGHT WORK)
Two left lanes closed on eastbound H-201 Moanalua Freeway between the Aiea Access Road Onramp and the offramp to H-3 from 9 p.m. Thursday, Jan. 9 to 3 a.m. Friday, Jan. 10 for permit work.
2) FORT SHAFTER (24 HOURS)
The left storage lane on the H-201 Moanalua Freeway leading to the Fort Shafter Exit has been shortened in preparation for drainage/pothole repairs.
3) MOANALUA TO MIDDLE STREET
Right lane and shoulder closures in both directions of the H-201 Moanalua Freeway between the Kikowaena Street Overpass (ramp from Kaua Street to Kikowaena Street) and the Middle Street Overpass from Monday, Jan. 7 to Friday, Jan. 10, 8:30 a.m. to 3 p.m. for lighting improvements.
4) MOANALUA TO MIDDLE STREET (NIGHT WORK)
Right lane and shoulder closure on eastbound H-201 Moanalua Freeway between the Kikowaena Street Overpass (ramp from Kaua Street to Kikowaena Street) and the Middle Street Overpass from Monday, Jan. 7 to Friday, Jan. 10, 9 p.m. to 4 a.m. for lighting improvements.
--- FARRINGTON HIGHWAY (ROUTE 93) ---
1) MAILI
Right lane closure on Farrington Highway in the Honolulu-bound direction near the intersection with Maipalaoa Road from Monday, Jan. 6 to Friday, Jan. 10 between 8:30 a.m. and 3 p.m. for bridge work.
2) MAKAHA
Shoulder closure on Farrington Highway in both directions between Kili Drive and Kaena Point/Satellite Tracking Station Road from Monday, Jan. 6 to Friday, Jan. 10 between 8:30 a.m. and 3 p.m. for shoulder work and landscaping.
--- FARRINGTON HIGHWAY (ROUTE 7101) ---
1) WAIPAHU TO PEARL CITY (HART JURISDICTION)
Farrington Highway (Route 7101) between Kahi Mohala and Waipahu High School is City Maintained State Highway.
- Right lane closures on Farrington Highway (Route 7101) between Acacia Road and Waiawa Road from Monday, Jan. 5 to Friday, Jan. 10, 8:30 a.m. to 3 p.m. for rail work.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
--- KAMEHAMEHA HIGHWAY (ROUTE 83) ---
1) HAUULA
Single lane closure in the southbound direction of Kamehameha Highway (Route 83) between Hulahula Place and Sacred Falls on Tuesday, Jan. 7 from 8:30 a.m. to 2:30 p.m. for HECO work.
2) HAUULA
Single lane closure in the southbound direction of Kamehameha Highway (Route 83) between the connections to Kaipapau Loop on Monday, Jan. 6 from 8:30 a.m. to 3 p.m. for HECO work.
3) KAWELA BAY
Single lane closure with alternating traffic control on Kamehameha Highway (Route 83) between Honokawela Drive and Marconi Road Monday, Jan. 6 through Friday, Jan. 10 8:30 a.m. to 3 p.m. for bridge work. Flaggers will be on site to direct traffic.
--- KAMEHAMEHA HIGHWAY (ROUTE 99) ---
1) WAHIAWA
Single lane closure in the southbound direction of Kamehameha Highway (Route 99) for approximately one mile from Paalaa Uka Pupukea Road Monday, Jan. 6 through Friday, Jan. 10 8:30 a.m. to 2:30 p.m. for HECO work.
2) WAIPIO
Shoulder closure on the northbound side of Kamehameha Highway (Route 99) between Kipapa Gulch and Lanikuhana Avenue Monday, Jan. 6 through Friday, Jan. 10 from 8:30 a.m. to 3 p.m. for maintenance.
3) HALAWA TO PEARL CITY (HART JURISDICTION)
Kamehameha Highway (Route 99) between Aloha Stadium and the vicinity of Sam’s Club by Acacia Road is City Maintained State Highway.
- Full closure of the eastbound lanes of Kamehameha Highway between Waihona Street and Kuala Street Monday, Jan. 6 to Friday, Jan. 10 between 8:30 a.m. and 3 p.m. Eastbound motorists will be detoured via Kuala Street.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
4) HALAWA TO JOINT BASE PEARL HARBOR HICKAM (HART JURISDICTION)
Kamehameha Highway (Route 99) between Aloha Stadium and Center Drive is City Maintained State Highway.
- Single lane closures in both directions between Salt Lake Boulevard and Ford Island Boulevard Monday, Jan. 6 through Friday, Jan. 10 8:30 a.m. to 3 p.m.
- Lanes closed on Kamehameha Highway eastbound between Center Drive and the onramp to H-1/Nimitz Highway Sunday, Jan. 5 through Thursday, Jan. 9 from 8 p.m. to 4 a.m. Onramp will be closed.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
--- KAMEHAMEHA HIGHWAY (ROUTE 7401) ---
1) HONOLULU
Left lane closed in both directions on Kamehameha Highway between Middle Street and Puuhale Street Monday, Jan. 6 to Friday, Jan. 10 from 8:30 a.m. to 3 p.m. for rail work.
--- LIKELIKE HIGHWAY/KALIHI STREET (ROUTE 63) ---
1) KALIHI (NIGHT WORK)
Moving closure of both lanes on Kalihi Street in the northbound direction between Dillingham Boulevard and North School Street on Monday, Jan. 6 to Thursday, Jan. 9 from 7 p.m. to 4:30 a.m. for permanent striping.
--- NIMITZ HIGHWAY (ROUTE 92) ---
1) AIRPORT (HART WORK)
Right lane closed on eastbound Nimitz Highway (Route 92) between Elliot Street and Aolele Street starting at 8 p.m. Sunday, Jan. 5 and ending at 4 a.m. Monday, Jan. 6 for rail work. See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
2) HONOLULU (HART JURISDICTION)
Right lane closed on eastbound Nimitz Highway (Route 92) in the vicinity of Valkenburgh Street starting at 8 p.m. Sunday, Jan. 5 and ending at 4 a.m. Monday, Jan. 6 for rail work. See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
3) HONOLULU (HART JURISDICTION)
Lanes closed on eastbound Nimitz Highway (Route 92) from the vicinity of the Kamehameha Highway Onramp to the H-1 Viaduct Onramp starting at 9 p.m. Sunday, Jan. 5 and ending at 4 a.m. Monday, Jan. 6 for rail work. Closure includes the mauka frontage ramp between Sand Island Access Road and Lagoon Drive. See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
4) HONOLULU (HART JURISDICTION)
Nimitz Highway (Route 92) between Richards Street and Awa Street is City Maintained State Highway.
Lanes closed in both directions between River Street and Richards Street from Sunday, Jan. 5 to Saturday, Jan. 11.
See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.
--- PALI HIGHWAY (ROUTE 61) ---
1) NUUANU (DAY + NIGHT WORK)
Single lane closure on Pali Highway (Route 61) in the Kailua-bound direction between Vineyard Boulevard and Coelho Way Monday, Jan. 6 to Friday, Jan. 10 for median and electrical work. Day work to take place from 7 a.m. to 3 p.m. Night work to take place from 8 p.m. to 5 a.m.
2) NUUANU (DAY + NIGHT WORK)
Single lane closure on Pali Highway (Route 61) in the Honolulu-bound direction between Coelho Way and Vineyard Boulevard Monday, Jan. 6 to Friday, Jan. 10 for median and electrical work. Day work to take place from 9 a.m. to 5 p.m. Night work to take place from 8 p.m. to 5 a.m.
3) NUUANU – CITY’S DOWSETT HIGHLANDS SEWER PROJECT
Closure of two lanes of Pali Highway (Route 61) in the Honolulu-bound direction between Wylie Street and Dowsett Avenue on Monday, Jan. 6, through Friday, Jan. 10, from 9 a.m. to 3:30 p.m., for the Dowsett Highlands Sewer Relief project.
Detours will be in place for side streets such as Dowsett Avenue, Ahi Place, and Country Club Road. See http://palisewer.org/schedule-updates/ for details.
4) NUUANU – CITY’S DOWSETT HIGHLANDS SEWER PROJECT
Closure of two lanes of Pali Highway (Route 61) in the Kailua-bound direction between Wylie Street and Dowsett Avenue on Monday, Jan. 6, through Friday, Jan. 10, from 8:30 a.m. to 3 p.m., for the Dowsett Highlands Sewer Relief project.
Detours will be in place for side streets such as Dowsett Avenue, Ahi Place, and Country Club Road. See http://palisewer.org/schedule-updates/ for details.
5) NUUANU TO MAUNAWILI (DAY + NIGHT WORK)
Single lane closure on Pali Highway (Route 61) in the Kailua-bound direction between Vineyard Boulevard and Kamehameha Highway Monday, Jan. 6 to Friday, Jan. 10 for median, electrical, rock shed, and striping work. Day work to take place from 7 a.m. to 3 p.m. Night work to take place from 8 p.m. to 5 a.m.
6) MAUNAWILI TO NUUANU (DAY + NIGHT WORK)
Single lane closure on Pali Highway (Route 61) in the Honolulu-bound direction between Vineyard Boulevard and Kamehameha Highway Monday, Jan. 6 to Friday, Jan. 10 for median, electrical, rock shed, and striping work. Day work to take place from 9 a.m. to 5 p.m. Night work to take place from 8 p.m. to 5 a.m.
###
|