Lane Closures for JBAB Ground Mounted Sign Structures Installation Starting Jan. 5
(WASHINGTON, DC) — The District Department of Transportation (DDOT) will be investigating signs throughout the District’s highway network from Monday, January 5 to Friday, January 9, 2026. These activities will require single and/or multiple lane closures and take place during off-peak hours between 9:00 A.M. to 3:00 P.M., weather permitting.
The required lane closures and installation activities are scheduled to occur as follows:
Install Proposed Foundations for JBAB GM Sign Structure (Overlook Ave North towards JBAB)
Monday - Friday, Jan. 5 to Jan. 9
There will be a right lane and shoulder closure.
Install Proposed Foundations for JBAB GM Sign Structure (I-295 SB)
Monday - Friday, Jan. 5 to Jan. 9
There will be a shoulder closure.
On any day which on-site conditions prohibit closures in the areas noted above, the daily activities will be completed the following day when conditions permit.
Traffic controls will be in place to warn motorists as they approach the areas.
Motorists are advised to stay alert while traveling through these locations and to be observant of the installation personnel.
|