Sidewalk Repair Work on 16th Street NW from Swann Street NW to T Street NW Begins August 1
(WASHINGTON, DC) — The District Department of Transportation (DDOT) is scheduled to begin sidewalk repair work on 16th Street NW from Swann Street NW to T Street NW starting on or about Friday, August 1, 2025, weather permitting. The roadway project is anticipated to be completed by Friday, September 5, 2025. Temporary Lane closures are to be expected with one travel lane remaining open.
Work will take place on Monday through Friday, from 9:30 a.m. to 3:30 p.m. and some Saturdays as needed.
Adjacent curbside parking may be restricted during the repair work. If so, Emergency No Parking (ENP) signs will be posted at least 72 hours in advance at locations where parking will be restricted.
The ENP signs will provide details of the hours of construction operations, dates, duration of the work, and information on the engineer in charge.
Traffic control devices will be in place to warn pedestrians, cyclists, and drivers approaching the work zone(s). Drivers are advised to stay alert while traveling near the work locations, be prepared for possible detours and to be observant of the work zone. Cyclists should be prepared to adjust their route accordingly. Metro bus will continue their routes. Flaggers will be available to manage traffic and arrow boards will be utilized, as necessary.
|