Temporary Lane Closures on the 14th Street Bridge
(WASHINGTON, DC) — The District Department of Transportation (DDOT) will temporarily close lanes on the following roadways for bridge preventative maintenance construction activities beginning June 21 through June 26, 2023, weather permitting.
Operation hours and locations are listed below:
14th Street Bridge NB- BR.170-1, single right lane closure needed on 14th Street Bridge Northbound to facilitate emergency electrical repairs. PEPCO needs access to manholes in the right lane of the bridge to access failed cables. A proper variable message board will be in place to notify the public of changes.
Lane closures will be between the hours of 9:30 AM and 3:30 PM, weather permitting on Wednesday, June 21 through Monday, June 26, 2023. Please note, on June 21st, 2023, workers are to be on site from 9:30 AM to 7:00 PM.
Traffic controls will be in place to warn drivers approaching the areas. Motorists should anticipate moderate-to-heavy delays due to the lane closures. Drivers are advised to stay alert while traveling through these locations and to be observant of the inspection personnel.
###
|