|
|
Beginning April 28, 2025, construction activities for the Levi’s® Stadium Capital Improvement Projects will temporarily affect vehicle, pedestrian, and bicycle traffic around the stadium.
Tasman Drive (Traffic Lane Closure)
- April 28 - 29: Eastbound vehicle and bike lane closures will occur during the day (9 a.m. to 3 p.m.), with pedestrian and bicycle traffic redirected to the sidewalk adjacent to Tasman Drive.
- May 19 - 23: Eastbound vehicle and bike lane closures will be in effect 24 hours a day, with pedestrian and bicycle traffic also detoured to the sidewalk next to Tasman Drive.
Marie P. DeBartolo Way (Full Street Closure)
- May 6 - June 2: This street will be completely closed 24 hours a day during this period. For participants, parents, and coaches using the Youth Soccer Park, please note that the Stars and Stripes gate will be the only entrance and exit during this time.
San Tomas Aquino Creek Trail (Intermittent Temporary Closures)
- April 28 - June 2: The trail will experience intermittent temporary closures (lasting 2-3 minutes) as crane loads cross it. Traffic control flaggers and advance signage will be present to halt pedestrian and bicycle traffic during hoisting operations, which will take place from 7 a.m. to 5 p.m.
Traffic control measures, including signage and flaggers, will be put in place to ensure public safety. Travelers are encouraged to consider alternative routes during the specified dates and times. For any questions, contact the City Manager's Office at 408-615-2210.
|
|
|
|