FB2020: Subway Restaurant Construction - Concrete slab coring

 

Oakland International Airport

OAKLAND INTERNATIONAL AIRPORT
AIRPORT BULLETIN 

SUBJECT:                         Subway Restaurant Construction - Concrete slab coring

SCHEDULED DATE:        Wednesday, April 14, 2021

SCHEDULED TIME:         6:00 am to 12:00 pm

 

As part of the Subway Restaurant construction, Westeren Construction will be conducting concrete slab coring approximately above the Vino Volo storage room and the Southwest Airline Maintenance closet at T2X. Construction staff will access the work location through Door 2102B. Although the Vino Volo storage room and Southwest Airline Maintenance closet will not be closed during coring, Westeren has notified affected tenants of the proposed work. 

 

Contacts:

 

Westeren Construction

Isaac Andrade (Superintendent)

(c): (925) 519-6615

 

Airport Engineering

Bill Jeng

(c): (510) 499-2535

 

Brian Matsumura, Inspector

(c): (510) 406-5588