|
Westbound Interstate 10 will be closed between State Route 143 and I-17 from 10 p.m. Friday, Aug. 20, to 4 a.m. Monday, Aug. 23 for more rubberized asphalt removal and work-zone set up work in preparation for the I-10 Broadway Curve Improvement Project. The ramp from southbound SR 143 to westbound I-10 will be closed, as will the westbound US 60 (Superstition Freeway) HOV ramp to westbound I-10. The westbound I-10 on-ramps at Elliot, Baseline and Broadway roads and 40th and 32nd streets will be closed. The westbound US 60 on-ramp at Mill Avenue also will be closed.
Detours: ADOT advises motorists to expect heavy traffic and allow extra travel time, especially those headed to the airport. Motorists should use detour routes on the state highway system and avoid using local roads and streets which are not designed or constructed to handle high volumes of interstate traffic.
- Drivers on westbound I-10 can exit to northbound SR 143 and use westbound Loop 202 (Red Mountain Freeway) to access westbound I-10 beyond the closure.
- Drivers on westbound US 60 and from other areas of the East Valley should consider using the northbound Loop 101 (Price Freeway) to westbound Loop 202 (Red Mountain Freeway)
- Drivers on westbound I-10 traveling to the West Valley can bypass the work zone by using the westbound/northbound Loop 202 (South Mountain Freeway) and connecting with I-10 at 59th Avenue
-
Airport traffic: Use exits for Phoenix Sky Harbor International Airport from SR 143 or Loop 202 (Red Mountain Freeway).
Watch the detour video
For real-time traffic information and project updates, download The Curve, ADOT’s free mobile app for the project, now available for iPhone and Android users.
|