|
Having trouble viewing this email? https://content.govdelivery.com/accounts/AZDOT/bulletins/2c22d7e
|
|

Drivers should allow extra travel time and plan for daytime delays
|
|
|
|
|
|
| |
|
The Arizona Department of Transportation advises motorists with March travel plans on US 60, between Show Low and Springerville (mileposts 353 to 367), to expect delays of up to 20 minutes for pavement maintenance.
US 60 will be narrowed to one lane only with alternating north- and southbound travel. Flaggers and a pilot car will escort traffic through the work zone.
Work will occur weekdays from 6 a.m. to 5 p.m.:
- Monday, March 1, through Friday, March 5.
- Monday, March 8, through Friday, March 12.
- Monday, March 15, through Wednesday, March 17.
The speed limit will be reduced in the work zone. Motorists should be prepared to slow down and use caution around construction personnel and equipment.
The restrictions are necessary so crews can apply a sealant on the existing asphalt, which helps protect and extend the life of the roadway.
|
| |
|
|
|
|
Schedules are subject to change based on weather and other unforeseen factors. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or go to azdot.gov/contact and select Projects from the drop-down menu. For real-time highway conditions statewide, visit ADOT's Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.
|
|