|
Having trouble viewing this email? https://content.govdelivery.com/accounts/AZDOT/bulletins/17b1d6b
|
|

Pima County Loop Trail at Ina Road will close
in January
|
|
|
The I-10/Ina Road Traffic Interchange project in Marana just north of
Tucson is completing its first phase of construction. Phase 1 is scheduled to
wrap up in mid-February 2017. The intersection of I-10 and Ina Road is
scheduled to close Wednesday, Feb. 15, 2017, barring weather-related or other
unforeseen delays. The closure will be in place for about 25 months. The
Arizona Department of Transportation will maintain access to all businesses in
the work zone for the duration of the project.
The project also includes reconstruction of the Ina Road
bridges over the Santa Cruz River beginning in January 2017. This work will
close the Pima County Loop Trail, south of Ina Road at Ted Walker Road and
north of Ina Road at the Crossroads at Silverbell District Park for
approximately two years. Once the bridge project is completed, there will be
Loop Trail underpasses on each side of the Santa Cruz River, new ADA-accessible
ramps to Ina Road and new bike lanes and sidewalks along Ina Road.
Drivers should proceed through the work zone with caution,
slow down and watch for construction personnel and equipment while
the following closures and restrictions are in place:
Interstate 10 Frontage Road
- The eastbound I-10 frontage road south of Ina Road
and north of Starcommerce Way is narrowed to one lane daily through the
end of the year.
- The westbound I-10 frontage road is closed between
Ina and Cortaro roads through the end of the year.
- Access to all businesses will be maintained.
Traffic control signs will guide drivers through the work zone.
Ina Road
- Ina Road, just east and west of I-10, is narrowed
to one lane through end of year.
- Ina Road, east of I-10, has left-turn lane
restrictions at Camino de Oeste (in both directions) and at Camino de la
Cruz (from eastbound Ina Road only) through end of year for utility work.
Watch for possible U-turn restrictions while work is underway.
Massingale Road
- Massingale Road is closed at the westbound I-10
frontage road through 2017 while the frontage road is reconstructed.
Drivers should use Camino de Oeste instead.
The project to reconstruct the interchange fully will improve traffic
operations on I-10 and on the Ina Road traffic interchange. The project
consists of widening I-10 to accommodate an additional lane in each direction
and widening Ina Road from Silverbell Road to Camino de la Cruz.
|
|

Managed by ADOT, this project is funded by the Regional Transportation Authority of Pima County. The voter-approved, $2.1 billion RTA plan will be implemented through 2026. Details about the full plan are available at www.RTAmobility.com.
ADOT works to inform the public about planned highway restrictions and closures, but it’s possible that unscheduled impacts might occur because of weather or other factors. For the most current information about highway conditions statewide, visit ADOT’s Travel Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.
For more information about this project, please call Paki Rico, ADOT senior community relations officer, at 520.388.4233 or email prico@azdot.gov or visit the website at http://azdot.gov/inati.
|
|
|
|
|