PROJECT COMPLETE!
23-14-C1: I-49 & Hwy 22 Transmission Line Realignment
This project consisted of an open-cut installation of approximately 328 linear feet of concrete-encased 66-inch steel casing pipe, in two locations, in preparation of future water transmission line installation. The work was required to be completed prior to construction of I-49 and is 100% reimbursable by ARDOT.
Design Engineer: Burns & McDonnell Engineering
Construction Contractor: Crawford Construction Company
Completion Date: 08/09/2024
Project Cost: $593,715.50
View the project map - https://www.fortsmithar.gov/home/showpublisheddocument/11312/638562080981830000
|
|
|
|