Project 23-07-C1- Basin 10 & 14 Capacity Improvement, Phase 3
This project includes the realignment and installation of approximately 1,300 linear-feet of 24-inch and 100 linear-feet of 12" diameter sanitary sewer main, including seven manholes, to replace an existing 12-inch main. Pipe installation will be by open cut, horizontal directional drilling, and hand tunneling.
Design Engineer: Hawkins-Weir Engineering, Inc Construction Contractor: Crawford Construction Company Estimated Completion Date: 01/31/2025 Project Cost: $5,083,072.00
View the project map - https://www.fortsmithar.gov/home/showpublisheddocument/11234/638550152853270000
Learn more about the Consent Decree and City of Fort Smith Water Utilities projects at -
|
|
|
|