West Seattle Bridge Program Weekly Update Friday, November 12, 2021

Department of Transportation logo large

West Seattle Bridge Weekly Update

News about the week ahead for the West Seattle Bridge Program. 


Planned construction this weekend

We will be installing new overhead signs on SR 99 between S Lander St and S Spokane St in the southbound direction. There will be no traffic impacts as the lane is currently closed, however you will see crews in the area as early as 6 AM Saturday. The work is anticipated to end as soon as 4 PM.  

On 9th Ave SW & SW Portland St and 16th Ave SW & SW Holly Stour crews will be constructing speed humps on Saturday and Sunday from 7 AM to 3 PM. With all planned construction, please be cautious as you navigate the area. 

Example of crews in the area working to build speed humps. Please navigate the area with caution and follow all traffic signs

Work platforms, like those from last fall’s stabilization work, will be used again to complete final repairs of the high bridge.

We will also be demolishing and pouring new building curb ramps on SW 28th St and SW Thistle St. This work will occur on both Saturday and Sunday as soon as 6 AM and will be completed at 5 PM. 

We are anticipating weather impacts this weekend and you may see crews responding to various emerging issues. There may be some unexpected repair work, please monitor traffic conditions, incidents, and road closures before you leave home.  


Coming soon – construction crews return to the high bridge!

This month, construction crews return to the West Seattle High-Rise Bridge to start the final phase of repairs and get us closer to re-opening the bridge to traffic in mid-2022. Kraemer North America will perform the repair work inside and outside of the bridge, building on stabilization work completed last year.  

We’ll begin mobilizing equipment into place on the high bridge as soon as next week. When crews return, they’ll first begin preparing the bridge to install the work platforms that will enable crews to access the underside of the bridge. This work includes hydro-blasting to create holes in the bridge at key locations to attach the work platforms, which will be constructed off-site and lifted into place starting in December.  

As repair work progresses, stay tuned to these weekly emails. We’ll share photos of work underway inside the bridge, video updates, and technical content so you’ve got the most current information as we prepare to reopen the bridge in mid-2022!   


Other news to know for the week ahead:

  • Ride in the rain challenge. The Cascade Bicycle Club and Washington Bikes invites seasoned peddlers, new riders, and people who bike from all over the state to bike as much as possible from November 1 - 30. The goal is for riders to face the drizzle, develop familiarity with winter riding, and stay active during the colder, shorter Pacific Northwest days. Sign up for the challenge on the Love to Ride Platform. 
  • Flip Your Trip offers support and free rides to those who live or work in West Seattle. Sign up today at FlipYourTrip.org to receive a special welcome bonus worth $25 in FREE trips you can use on transit, water taxi, and bike/scooter-share (using the Transit GO Ticket app)—as well as the first month free on Metro vanpools, personalized trip planning, informational events, and more. 
  • Plan ahead for sports in SoDo. As more in-person sporting events return, you may see increased traffic on game days. Metro provides a wide range of transportation options and choices for King County. In addition to the region’s largest bus network, our choices include vanpools, paratransit services, and many new forms of transportation solutions. Learn more about upcoming events on the King County Metro website 

Phone line in many languages:

If you or someone you know wants to talk with us, give feedback, or could benefit from having this information read to them in another language, please call (206) 400-7511.   

  • 如果您需要此信息翻譯成中文 請致電 (206) 400-7511. 
  • Kung kailangan mo ang impormasyon na ito na nakasalin sa (206) 400-7511. 
  • Tagalog mangyari lamang na tumawag sa (206) 400-7511. 
  • Si necesita traducir esta información al español, llame al (206) 400-7511. 
  • Odeeffannoon kun akka siif (206) 400-7511. 
  • Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi (206) 400-7511. 
  • የዚህን መረጃ ትርጉም ከፈለጉ፣ በዚህ ስልክ ቁጥር ይደውሉ፡ (206) 400-7511. 
  • ናይዚ ሓበሬታ ትርጉም እንተደሊኹም፣ በዚ ቁጽሪ ስልኪ ይድውሉ፡ (206) 400-7511. 
  • 당신이 번역이 정보를 필요로하는 경우에, (206) 400-7511 로 전화해주십시오.