Region 4 Weekly Construction Update

Having trouble viewing this email? View it as a Web page.

November 1, 2024 - November 8, 2024

Region 4 Weekly Construction Update

Here at ODOT, we are committed to providing a safe and efficient transportation system for everyone. We invest in Oregon's future through roadway improvement projects. The following projects are located within Region 4; Central Oregon from The Dalles to Klamath Falls on the east side of the Cascades.

There are two ways to learn about construction taking place for the upcoming week. 

1. Visit TripCheck.com. Constantly updated with construction and crash data, TripCheck is the best way to learn about road conditions around the state. Click on a traffic cone symbol on the map to see construction impacts for that area.


2. Scroll down to the counties and highways listed below to see impacts that could affect you. Construction information is shown for one week, giving you the most up-to-date information.

All work is dependent on weather conditions, and schedules are subject to change.


DESCHUTES COUNTY

U.S. 97 and U.S. 20 Bend North Corridor 

Travelers will encounter single lane closures on U.S. 97 from Empire to Grandview Sunday night through Friday night.

Work for the week includes:

  • U.S. 20 from Cooley to Robal: Crews will be performing cleanup work.
  • Between Grandview Cooley and Empire: Crews will be working on sign installation, flatwork, and cleanup work.
  • On the existing U.S. 97 Business Park: Flatwork, sign installation, electrical, and cleanup work will continue.

Expected completion - December 2024

More project information here.

 

U.S. 97: Lower Bridge Way - Northwest 10th Street (Terrebonne) 

Crews will be working on the retaining walls on the east and west sides of the highway around Lower Bridge way.

Smith Rock Way will be closed to through traffic from November 4 through December 13 for sewer and roadway work. Please use posted detour.

Expected completion- May 2026.

More project information here. 

 

U.S. 97 Redmond to Bend Phase 2

Crews will be installing center median barrier on U.S. 97 Sunday through Tuesday nights from 7p.m. - 6a.m. with single lane closures in place. Minimal delays expected.

Expected completion- December 2024.

More project information here.

 

U.S. 20: 3rd Street - 15th Street (Greenwood, Bend) Project

Crews will be performing daytime single lane closures on U.S. 20 (Greenwood) between 4th and 12th Streets Monday to Friday for sidewalk, signal, and paving operations. No delays expected.

Expected completion- December 2024

More project information here.

 

U.S. 20 at Locust Street Roundabout

North bound Locust will be intermittently closed for sidewalk concrete work. No highway delays are expected.

Expected completion - October 2024

More project information here.

 

OR 126: Redmond - Powell Butte

Project is mostly complete with the exception of bridge work and in town paving. Work will resume in late February.

Expected completion - May 2025

More project information here.

 

CLACKAMAS COUNTY

OR 35: U.S. 26 Overcrossing Bridge (Mt. Hood Highway)

Motorists may experience single-lane closures controlled by flaggers at times on OR 35 while crews install rumble strips and temporary striping.

Expected Completion - May 2025.

More project information here.

 

CROOK COUNTY

U.S. 26 Meadow Lakes Drive – Combs Flat Road (Prineville)

Crews will be performing lane closures Wednesday morning from 4a.m. to 7a.m. at Combs Flat Road for paving operations. Minor delays are expected.

More project information here.

Expected completion- November 2024.

 

GILLIAM COUNTY

OR 206: Rock Creek Bridge Project

Work continues on-site with crews performing paving and striping. The full 3-week closure of OR 206 has been lifted and the new bridge is now open to all traffic. Motorists should anticipate daytime single-lane closures controlled by flaggers on OR 206.

Expected completion - November 2024

More project information here.

 

KLAMATH COUNTY

OR 140 Brett Way Extension (South Klamath Falls Highway, MP 3.74 - 4.75)

No work expected this week. 

More project information here.

Expected completion - August 2025

 

U.S. 97: OR 58 - California Border Project (The Dalles - California Highway, MP 252.44 - MP 278.81)

Link River Bridge at MP 275.03: George Way is closed to thru traffic, please follow detour in place.

Expected completion - June 2025

More project information here. 

 

U.S. 97: SCL Crescent - Willamette Highway 58 Junction Section

No work expected this week.

Expected completion- October 2024

 

SHERMAN COUNTY

I-84: US197-The Dalles, Rufus & Arlington Bridges

Crews will be in Rufus performing drainage work associated with the construction of the Rufus crossover. Motorists should anticipate full-time single-lane closures weekdays on I-84 near milepost 109 in both eastbound and westbound directions.

More project information here.

Expected completion- May 2026


 

Questions or comments?

Meghan Blyth, community affairs coordinator 

541-316-3941 or Meghan.L.Blyth@odot.oregon.gov

For current road and weather conditions visit TripCheck.com or call 511

 

Accommodation or Translation Requests

To request information in an alternative format or to request an accommodation under Civil Rights Title VI, call 541-316-3941 or use the statewide Oregon Relay Service: 7-1-1.

Where traffic is routed through or around a work zone, pedestrians, including those with disabilities, will also be provided routes through or around the work zone.

To request information in other languages, call 541-316-3941.

Para solicitar información en otros idiomas, llame a 541-316-3941.