ODOT Region 1 Weekly Construction Update: June 2-9
Oregon Department of Transportation sent this bulletin at 06/01/2018 12:35 PM PDTJune 1, 2018
For more information: Katelyn Jackson 503-731-8503
Katelyn.Jackson@odot.state.or.us
Weekly Construction Update:
June 2-9, 2018*
*Schedules are subject to change due to weather and site conditions.
1. Visit TripCheck. Constantly updated with construction and crash data, TripCheck is the best way to learn about roadway conditions around the state.
2. Scroll down to the highways listed below to see impacts that affect you. Construction information is shown for one week, giving you the most up-to-date information for targeted areas in the Portland-metro region
3. Review this "quick glance" schedule. Construction information is shown for one week in a visual format, giving you the most up-to-date information for targeted areas in the Portland-metro region.
Interstate 5 – Pacific Highway – Exit 283 on-ramp (City of Wilsonville)
Project Description: The City of Wilsonville is making improvements to the I-5 on-ramp for Exit 283 from Wilsonville Road.
Traffic Impacts: Day lane closures on the southbound Exit 283 on-ramp from Wilsonville Road from 8 a.m. to 2 p.m. Shoulder closures during work.
Interstate 5 – Pacific Highway – Paving and Auxiliary Lane
Project Description: This project will add a southbound auxiliary lane on I-5 from Lower Boones Ferry Road to I-205, add a second lane to the Lower Boones Ferry Road off-ramp from I-5 north, and pave I-5 from OR 99W to I-205.
Traffic Impacts: Nighttime single and double lane closures of I-5 in both directions from 8 p.m. to 5:30 a.m. and ramp closures. Periodic shoulder closures.
Sunday through Friday nights, the following ramps will be closed periodically: Southbound Haines Street (Exit 293) on-ramp and northbound off-ramp, northbound on-ramp to OR 217 (Exit 292A), northbound Carmen Drive (Exit 291) on- and off-ramps, and the northbound and southbound Kruse Way on- and off-ramps (Exit 292B).
For more information: www.tinyurl.com/I5ODOTProject
Interstate 5 – Pacific Highway – Interstate Sign Replacement
Project Description: This project will install, replace, repair and upgrade existing interstate signs and sign structures to meet current federal standards. The project area along I-5 will occur south of the Iowa Street viaduct and north of the OR 217 interchange.
Traffic Impacts: No traffic impacts.
For more information: www.tinyurl.com/i5SignReplacementODOT2
Interstate 84 – Banfield Expressway – Regional Connections
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently. New electronic signs will be installed on U.S. 26 between I-405 and OR 217. During sign installations, there will be several full nighttime freeway closures. Work will be complete spring 2018.
Traffic Impacts: Double lane closures on I-84 (from I-5 to I-205) Monday through Friday, from 8 p.m. to 5:30 a.m. Shoulder closures.
For more information: www.odotrealtime.org
Interstate 84 – Banfield Expressway – Interstate Sign Replacement
Project Description: This project will install, replace, repair and upgrade existing interstate signs and sign structures to meet current federal standards. The project area along I-84 will occur between the NE 102nd Avenue overcrossing and slightly east of the NE 148th Avenue overcrossing.
Traffic Impacts: No traffic impacts.
For more information: www.tinyurl.com/i84SignReplacementODOT
Interstate 84 – Columbia River Highway – Farley Slide
Project Description: The project will repair a landslide area to prevent future movement near milepost 48, just east of Cascade Locks. The work will include building a retaining wall north side of I-84 below the highway.
Traffic Impacts: Single lane closures for westbound I-84 near Cascade Locks from 6 a.m. to 8 p.m. Monday through Thursday and until noon Friday.
For more information: www.i84construction.org
Interstate 84 – Columbia River Highway – Wyeth to Lindsey Creek
Project Description: This project is constructing the next phase of the Historic Columbia River Highway State Trail. This segment will connect Wyeth Campgrounds to the State Trail at Lindsey Creek. Construction will occur through summer 2019.
Traffic Impacts: Daytime single lane closures for eastbound I-84 from milepost 51-53 from 6 a.m. to 6 p.m. Tuesday through Wednesday, until 2 p.m. Thursday. Periodic shoulder closures.
For more information: www.oregon.gov/ODOT/Regions/Pages/State-Trail.aspx
Interstate 205 – East Portland Freeway – Glenn Jackson Bridge to Johnson Creek Boulevard
Project Description: This project will pave 9 miles of I-205 between Johnson Creek Boulevard and the Glenn Jackson Bridge, including some ramps, build auxiliary lanes in three locations, install ODOT RealTime electronic signs and make pedestrian improvements at Glisan Street.
Traffic Impacts: Nighttime single and double lane closures in both directions. Shoulder closures.
For more information: www.i205construction.org
U.S. 26 – Sunset Highway – Cornelius Pass Road to 185th Avenue
Project Description: This project will widen U.S. 26 to three lanes in each direction between Cornelius Pass Road and NW 185th Avenue, replace the two Rock Creek bridges with one bridge, improve the north side of the Cornelius Pass Road interchange and build a sound wall on the north side of U.S. 26 in the Rock Creek neighborhood.
Traffic Impacts: Nighttime single and double lane and shoulder closures on U.S. 26 from 8 p.m. to 5:30 a.m. weekdays. Night ramp closures at Exit 62 and Exit 64.
For more information: www.cornpass185.org
U.S. 26 – Sunset Highway – Regional Connections
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently. New electronic signs will be installed on U.S. 26 between I-405 and OR 217 and on I-84 between I-5 and I-205. New technology will be installed on TV Highway from OR 217 to Brookwood Parkway and on local Washington County roads.
Traffic Impacts: Night and day shoulder closures on U.S. 26. Single lane closure for U.S. 26 from 8 p.m. to 5:30 a.m. weekdays.
For more information: www.odotrealtime.org or 24-hour noise hotline at 971-673-5239.
U.S. 26 – Powell Boulevard – Safety Improvements
Project Description: This project will make safety improvements on Powell Boulevard from Southeast 20th to 34th Avenues. Improvements include installing pedestrian activated beacons, new signs improved lighting, and crosswalk and sidewalk improvements.
Traffic Impacts: Day and night lane closures. Nighttime flagging at intersections. Periodic 20 minute closures.
Daytime single lane closures from 9 a.m. to 3 p.m. weekdays. Nighttime lane closures from 8 p.m. to 5 a.m. and flaggers directing traffic at the intersections of SE 21st, 26th, and 33rd Avenues. Periodic 20 minute full closures of intersections at night while new utility poles are installed.
For more information: www.powellblvdsafety.org
U.S. 26 – Mt. Hood Highway – Boring Road Bridge Raising
Project Description: The SE 282nd Avenue/Boring Road overpass will be raised, repaired and resurfaced in 2018
Traffic Impacts: Single lane closures on U.S. 26 weekdays. Westbound lane closures from 9 a.m. to 3 p.m. and eastbound lane closures from 8 a.m. to 2 p.m.
For more information: www.boringrdbridge.org
U.S. 26 – Mt. Hood Highway – Mirror Lake (Milepost 52)
Project Description: Relocate the Mirror Lake trailhead and parking lot along U.S. 26 west of Government Camp.
Traffic Impacts: Flaggers will direct travelers Monday through Friday during daylight hours. Expect 20-minute delays.
For more information: flh.fhwa.dot.gov/projects/or/mirror-lake
Oregon 8 – Tualatin Valley Highway – Regional Connections
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently.
Traffic Impacts: Single lane closures and shoulder closures on 185th Avenue, Cornelius Pass, Murray Road and Scholls Ferry Road from 9 a.m. to 3 p.m. weekdays.
For more information: www.odotrealtime.org
Oregon 99E – McLoughlin Boulevard – Rockfall Improvement
Project Description: This project will increase the stability of the hillside and traffic safety of OR 99E in Oregon City. Rock work will occur from the south side of the Railroad Avenue tunnel through Old Canemah Park.
Traffic Impacts: Periodic single lane closures. Beginning Wednesday, expect traffic shifts, lane closures in both directions and long delays 24/7 in Oregon City.
For more information: bit.ly/OR99ERock
Oregon 99W – Interstate Avenue – Victory Boulevard Bridge Repair
Project Description: Crews will replace rotting wooden bridge supports with steel supports on a bridge carrying Interstate Avenue for this emergency maintenance project. The bridge is located where North Interstate Avenue crosses over North Victory Boulevard, just west of Interstate 5 in North Portland
Traffic Impacts: Periodic single lane closures for eastbound Victory Boulevard. Sidewalk users will be directed by flaggers or experience minor delays.
Sidewalk users will be directed by flaggers.
Oregon 213– 82nd Avenue – SE Lindy Street to SE King Road
Project Description: This project will pave SE 82nd Avenue from SE Lindy Street to SE King Road and install new sidewalk curb ramps.
Traffic Impacts: Expect single lane closures from 5 a.m. to 3 p.m. Tuesday through Friday. Pedestrian and cyclist detours. Pedestrian and cyclist detours.
For more information: lmsc.82ndaveprojects.com
Oregon 213– 82nd Avenue – Signal Upgrades
Project Description: This project will upgrade traffic signals and install sidewalk curb ramps on SE 82nd Avenue at the intersections of SE Foster Road, SE Woodstock Boulevard and SE Flavel Street. Construction is expected through 2018.
Traffic Impacts: Daytime single lane closures from 6 a.m. to 3 p.m. weekdays between SE Flavel to SE Clatsop Streets. Pedestrian and cyclist detours.
For more information: www.Tinyurl.com/82ndAveSignals
Oregon 213– 82nd Avenue – Sidewalk Improvements
Project Description: This project is making it easier for pedestrians to get around on 82nd Avenue by removing old driveways and replacing them with regular sidewalks. This means fewer tripping hazards, as well as less confusion for drivers about which driveway to use. Work will take place at 17 locations, near the intersections of SE Main Street, SE Woodstock Boulevard, SE Harney Street and SE Clatsop Street.
Traffic Impacts: Daytime single lane closures from 6 a.m. to 3 p.m. weekdays from Main Street to Clatsop Street. Pedestrian and cyclist detours.
Oregon 213– 82nd Avenue – Powell traffic separator
Project Description: This project is improving safety at the intersection of SE 82nd Avenue and SE Powell Boulevard by installing two traffic separators turn reduce left-turn crashes. A traffic separator will be installed on 82nd Avenue immediately north of Powell Boulevard.
Traffic Impacts: Nighttime single lane closures on 82nd Avenue and Powell Boulevard. Single lane closures Monday through Friday nights from 8 p.m. to 9 a.m., Saturday night from 7 p.m. to 10 a.m. and Sunday night from 7 p.m. to 5:30 a.m.
Oregon 213– Cascade Highway South – South Union Mills
Project Description: This project will improve safety on OR 213 at the intersection of South Union Mills Road by leveling out the crest of the hill to increase driver’s ability to see oncoming and turning traffic. This project will also add a standard right-turn lane on Union Mills and a center turning lane on OR 213 for southbound traffic.
Traffic Impacts: Day work on Union Mills and OR 213 weekdays.
Daytime lane closures with flaggers directing traffic from 7 a.m. to 5 p.m. weekdays on South Union Mills Road and work alongside OR 213, with no to minimal delays.
For more information: www.OR213UnionMills.org
Oregon 213– Cascade Highway South – Highway repairs in Mulino
Project Description: Repair work is underway to install drains to create a path for water under the highway. Record setting rains reactivated an ancient landslide in March 2017. Roadway conditions will continue to change as additional movement of the landslide is expected.
Traffic Impacts: One lane in each direction is open. Speed is reduced to 45 mph.
For more information: www.oregon.gov/odot/projects/pages/project-details.aspx?project=SHHR
Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону (503) 731-4128.
이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: (503) 731-4128.
如果 您想了解这个项目翻译成简体中文的相关信息,请致电 (503) 731-4128.
For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call (503) 731-4128, TTY (800) 735-2900 or Oregon Relay Service 7-1-1.