 Contractor crews work on sidewalk improvements on N 35th St in Fremont
Hello community members,
Happy Halloween! Our contractor crews are hard at work to make sure Fremont is easy to navigate for trick or treaters and holiday shoppers. We are continuing to upgrade sidewalks and curb ramps throughout the neighborhood into December but clear pedestrian detours will be in place. Neighbors can also expect construction activities on the west side of the neighborhood, near Phinney Ave N and N 36th St. The bulk of construction will continue to be focused around Fremont Ave N and Fremont Pl N.
We also have some important updates in the Ballard and Westlake neighborhoods.
In Ballard, contractor crews are in the process of updating a bus stop on Leary Way NW and 15th Ave NW. Community members can expect construction to continue through December. Please note, there will be fewer general parking spots available while crews complete these upgrades.
Westlake Ave N & 9th Ave N – New Bus-Only Lane and Traffic Changes
The map below shows traffic changes at the intersection of Westlake Avenue N and 9th Avenue N as part of the Route 40 Transit-Plus Multimodal Corridor Project.
- Area 1 (in red): This section of Westlake Ave N is a new bus-only lane. Buses will use this lane to make a protected left turn onto 9th Ave N from the far-right side of the roadway.
- Area 2 (in black with green dashed line): Crews will be adjusting signal timing and pavement markings in the intersection to accommodate the new bus movement.
What to Expect
- People driving should watch for buses merging into and turning from the far-right lane.
- King County Metro operators will receive specific training to navigate this new lane configuration safely and efficiently.
- Access to nearby businesses, residences, and driveways will remain open throughout the transition.
 Buses will use a special signal to perform this movement, so people driving may see buses perform turns when their signal is "red".
 A rendering shows improvements heading north on Fremont Ave N.
What to expect during construction
- Crews will demolish existing sidewalks and install new, wider sidewalks and ADA-compliant curb ramps.
- Work will involve trenching for underground electrical conduit and concrete paving in some locations.
- Construction will take place along key blocks of Fremont Avenue N, N 36th St, N 35th St, and nearby intersections.
- Sidewalk closures and pedestrian detours will be in place. Please follow posted signs for the safest route.
- Some driveways and business access points may be temporarily impacted. Crews will coordinate closely with property owners to maintain access whenever possible.
- Noise, dust, and construction equipment will be present during work hours.
Why this work matters
- New sidewalks and curb ramps will create safer, more accessible connections for everyone traveling in Fremont.
- Utility upgrades will support better lighting, signals, and future improvements along the corridor.
- These investments are part of a broader effort to improve reliability, safety, and comfort on Route 40 — one of Metro’s busiest bus routes.
To learn more about anticipated construction impacts, read the types of construction activities involved in this work.
 For more than forty years, Dusty Strings has been the Pacific Northwest’s premiere dealer of high-quality acoustic and electric guitars, mandolins, banjos, ukuleles, amps, pedals, folk harps, hammered and mountain dulcimers, accessories, books, and much more. Our instrument and accessory lines are thoughtfully curated and represent the highest quality in artisanship at fair and affordable prices. Every instrument is hand inspected by knowledgeable staff before it is listed for sale. Our services include repairs and rentals. We also have a bustling music school - both in person and online, including private lessons, group classes, workshops and jam sessions.
If you own or manage a business in Fremont or Westlake Ave near the project corridor and would like to be featured, please email us at Route40@seattle.gov and send us a short description and picture of your business.
Every Tuesday from 9:30 to 10:00 AM, residents and business owners have the opportunity to actively participate in our online open house for Route 40. These sessions provide an opportunity to connect directly with the project team, ask questions, share comments, or simply listen. They are a valuable way for the community to stay informed and engaged throughout the project. We encourage everyone to join us and be part of the conversation—your input is important and helps shape the project’s success!
You can access the online meetings with the details below: https://us02web.zoom.us/j/83530373889
Route 40 has over 8,500 average weekday daily boardings (Fall 2024) - an 11% increase from Fall 2023. It is the fifth (5th) highest ridership route in the Metro network.
In addition to the 5-10% transit travel time savings, 14-17% in Ballard to Downtown, the Route 40 project will maintain and modernize vital infrastructure
- Temporary lane reductions
- Temporary driveway closures
- Temporary bus stop closures
- Temporary parking restrictions
- Temporary sidewalk detours
- Temporary storage of construction supplies in the street
- Temporary noise, dust and vibrations
- Bus stop relocations
- Drainage work: This involves digging trenches to help manage water flow
- Signal pole foundation excavation: This work involves digging for the pole foundations prior to when we order custom signal poles which takes a while to build and to make sure we know there are no underground obstructions
- Trenching for conduit: This involves digging trenches to lay down pipes or cables underground
- Sidewalk curb bulb out: This involves making the curbs stick outward for safety or accessibility
- Mill and fill overlay: This is when the top layer of the road gets removed and replaced with new asphalt
The construction timeline is always subject to change depending on weather conditions and materials availability. We are committed to keeping you informed and maintaining open communication throughout the remainder of this project.To learn more about the project and designs, visit our online open house.
-
Phone: (206) 775-8731 (leave a voicemail and we will return your call)
Our project team is in close coordination with the following projects. Please visit their project webpage to see the latest update:
If you need this information translated, please call 206-775-8731.
如果您需要此信息翻譯成中文 請致電 206-775-8731.
Kung kailangan mo ang impormasyon na ito na nakasalin sa Tagalog mangyari lamang na tumawag sa 206-775-8731.
Si necesita traducir esta información al español, llame al 206-775-8731.
Odeeffannoon kun akka siif 206-775-8731.
Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi 206-775-8731.
የዚህን መረጃ ትርጉም ከፈለጉ፣ በዚህ ስልክ ቁጥር ይደውሉ፡ 206-775-8731.
ናይዚ ሓበሬታ ትርጉም እንተደሊኹም፣ በዚ ቁጽሪ ስልኪ ይድውሉ፡ 206-775-8731.
당신이 번역이 정보를 필요로하는 경우에, 206-775-8731 로 전화 해주십시오.
اذا تريد ترجمة هذه المعلومات, يرجى الاتصال برقم 206-775-8731
Contact us
If you have any questions, please contact us at Route40@seattle.gov
Sincerely,
Jules Posadas
Route 40 Transit-Plus Multimodal Corridor Project
(206) 775-8731
Route40@seattle.gov
|