West Seattle Bridge Program Weekly Update: Friday, July 1, 2022

Department of Transportation logo large

West Seattle Bridge Weekly Update  

News about the week ahead for the West Seattle Bridge Program.     


Watch our May Progress Video

Progress video for May 2022

In May 2022, we completed the foundation of the new post-tensioning system. Watch our latest progress video to see crews pouring the final structural post-tensioning components and making progress on major maintenance work.


High bridge repair: Pre-tensioning epoxy injection and carbon-fiber wrap work complete; post-tensioning prep continues

Schedule graphic for the high bridge repairs

This week marks the completion of our pre-tensioning phase of epoxy crack injection and carbon-fiber wrapping that began back in February. This work was necessary to strengthen sections of the bridge’s concrete that had weakened over time and reinforce the areas that surround the new structural components for the post-tensioning system.

Injecting cracks with epoxy and wrapping sections of the bridge in carbon-fiber.

Injecting cracks with epoxy and wrapping sections of the bridge in carbon-fiber (seen above) were an important first step in strengthening and reinforcing the bridge. After tensioning the bridge, we will complete a final round of epoxy injection and carbon-fiber wrapping work.

We continued assembling protective ducts that will encase the post-tensioning cables. We are working to position the assembled ducts inside the bridge by using temporary rigging lines and support towers. Once the ducts are in their final position, we will be able to start installing the cables in them using specialized equipment. When the cables are installed, we will begin the tightening process to compress the bridge structure’s concrete.

We built temporary support towers to elevate and brace the ducts that will encase the post-tensioning cables.

We built temporary support towers to elevate and brace the ducts that will encase the post-tensioning cables.

We continue to make progress on major maintenance work. We wrapped up concrete grinding and surface preparation work on the Fauntleroy Expressway this week. With the top half inch of concrete removed on about 2 acres of the expressway, we will start pouring new concrete overlay in the coming weeks.


Low bridge rehabilitation: east span platform hoist complete

Two platforms were hoisted to the underside of the low bridge’s eastern span.

Two platforms were hoisted to the underside of the low bridge’s eastern span. This allows us to begin our low bridge rehabilitation work.

Last weekend, we successfully hoisted two platforms to the underside of the low bridge’s eastern span. This effort begins our low bridge rehabilitation work that will strengthen the low bridge to keep it strong for years to come.

We will begin epoxy crack injection and carbon-fiber wrapping to reinforce the concrete on the low bridge in the coming months. This is the same concrete strengthening method we’ve been using on the high bridge.

We’ll hoist work platforms on the bridge’s western span in the next few weeks so that crews can easily access the underside of the bridge’s girder.


Construction in West Seattle and South Park this weekend

On Saturday and Sunday, we will be repairing potholes on the Spokane Street Viaduct in the eastbound direction. The repairs will close the access to the Spokane Street Viaduct and the SR 99 Loop Ramp. People driving will have access to East Marginal Way S, 1st Ave S, 4th Ave S, and I-5. However, there will be a detour in place. Work will begin as early as 6 AM and conclude by 4:30 PM both days. Please navigate the area with caution.

On Saturday and Sunday, we’ll close the on-ramp from eastbound SW Spokane St to the Spokane St Viaduct as we work to fill potholes.

We’re planning to complete two projects this Saturday, July 2. For all planned construction, we expect to begin work as early as 6 AM and conclude by 5 PM. Please anticipate delays, drive safely in work zones, and follow directions from signs and flaggers.

  • We’ll be finishing the repairs on eastbound SW Spokane St in the vicinity of 11th Ave SW near Harbor Island. This is phase three of three phases to repair the damaged lane divider. Traffic impacts include closure of the East Marginal Way S and the lower SW Spokane St ramps. There will be a detour in place for those traveling in the area.
  • Updating signal lights on 7th Ave S and S Cloverdale St in South Park. A majority of the work will be completed on 7th Ave S with minimal impacts to S Cloverdale St.

Port truck parking meetings in Georgetown and South Park

Trucks parked on the side of the street.

Trucks parked along the street in Seattle.

Do you live or work in Georgetown or South Park? The City of Seattle and Port of Seattle/The Northwest Seaport Alliance will be addressing the issues related to Port truck parking in your neighborhood. Join us and let your voice be heard.

¿Trabaja o vive en Georgetown o South Park? City of Seattle y Port of Seattle/The Northwest Seaport Alliance abordarán los temas relacionados al estacionamiento de camiones del puerto en su vecindario. Acompáñenos y permita que su voz sea escuchada.

Georgetown Meeting / Reunión en Georgetown

Monday, July 11

6:00 – 7:30 PM

Mini Mart City Park

6525 Ellis Ave S

South Park Meeting / Reunión en South Park

Monday, July 18

6:00 – 7:30 PM

Duwamish River Community Hub

8600 14th Ave S

Virtual Event / Evento virtual

Thursday, July 14

6:00 – 7:00 PM

https://bit.ly/trucktractormeeting

*Food will be provided at the in-person events / *Se ofrecerá alimentación en los eventos presenciales

Please contact westseattlebridge@seattle.gov or call (206) 400-7511 if you have accessibility needs or would like to request translations. Si tiene necesidades especiales o requiere interpretación (traducción), por favor contacte a westseattlebridge@seattle.gov o llame al (206) 400-7511.


Question of the week: What will happen to the low bridge restrictions when the high bridge reopens?

Once the West Seattle Bridge reopens, all restrictions on the Spokane St Swing Bridge (low bridge) will be removed. We will be turning off and removing the cameras used for automated photo enforcement. Until the high bridge reopens, please continue to avoid the low bridge unless authorized. As a reminder, the restrictions are:

The low bridge will be restricted through the high bridge reopening.
  • Low bridge is closed to most vehicles weekdays from 5 a.m. to 9 p.m. and weekends 8 a.m. to 9 p.m. Unauthorized vehicles will receive a $75 ticket for every trip across the bridge.
  • Low bridge is open to everyone weeknights from 9 p.m. to 5 a.m. and weekends from 9 p.m. to 8 a.m.
  • Low bridge pedestrian path is open all days and all hours for people walking, rolling, using an electric foot scooter, or biking.

Visit our Low Bridge Access page for more information.


Other news to know

  • Seattle Transportation Plan: Help reimagine how we move around the city. The Seattle Transportation Plan is our commitment to building a safe, efficient, and affordable transportation system. On the Seattle Transportation Plan Online Engagement Hub, you can take a new survey, come to an upcoming event, and tell us where you see places for change.
  • Flip Your Trip offers support and free rides to those who live or work in West Seattle. Sign up today at FlipYourTrip.org to receive a special welcome bonus worth $25 in FREE trips you can use on transit, water taxi, and bike/scooter-share (using the Transit GO Ticket app)—as well as the first month free on Metro vanpools, personalized trip planning, informational events, and more.       
  • How does West Seattle shop? Take this University of Washington survey and you may win $50. The University of Washington's Supply Chain Transportation & Logistics Center invites you to take part in a 5-minute survey. Their goal is to understand how people shop, travel to stores, and make online purchases, and how shopping patterns relate to transportation systems. All responses are confidential.

Phone line in community languages

If you or someone you know wants to talk with us, give feedback, or could benefit from having this information read to them in another language, please call (206) 400-7511.     

  • 如果您需要此信息翻譯成中文請致電(206) 400-7511.     
  • Kung kailangan mo ang impormasyon na ito na nakasalin sa (206) 400-7511.     
  • Tagalog mangyari lamang na tumawag sa (206) 400-7511.     
  • Si necesita traducir esta información al español, llame al (206) 400-7511.     
  • Odeeffannoon kun akka siif (206) 400-7511.     
  • Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi (206) 400-7511.     
  • የዚህንመረጃትርጉምከፈለጉ፣በዚህስልክቁጥርይደውሉ፡(206) 400-7511.     
  • ናይዚሓበሬታትርጉምእንተደሊኹም፣በዚቁጽሪስልኪይድውሉ፡(206) 400-7511.     
  • 당신이번역이정보를필요로하는경우에, (206) 400-7511전화해주십시오