 Paving the west leg of 172nd ST SW
Traffic Impacts
- The east leg of 172nd St SW will be closed on March 30th, 2020 for construction of the roundabout.
- Only North and South bound traffic will be allowed at the intersection of 36th Ave W and 172nd St SW while the roundabout is constructed.
Local access will be maintained for residents within the closure. Please be aware of and follow the detour routes.
Temporary channelization on 36th Ave W has moved the north and southbound lanes to the east side of the road. Please follow traffic control.
Week of April 13th
- Between 179th St SW and 165th Pl SW
- Form and place concrete for curbs at 36th Ave W and 172nd ST SW roundabout
- Placing mast arms for the signal at 36th Ave W and 179th St SW
- Final lift of hot mix pavement on 179th ST SW, Maple, and the west leg of 172nd ST SW
- Grinding asphalt and crack sealing in preparation for next week’s final lift pavement on 36th Ave W
- Hydro seed
Week of April 20th
- Between 180th St SW and 165th Pl SW
- Hot mix asphalt paving 36th Ave W
Milestone Events:
- Paving the final lift of asphalt from 180th Pl SW to 165th Pl SW will take place April 20th through May 1st.
- Signal activation will take place the latter part of May or early June