This week fill was placed over the cellular concrete placed
last week. Base rock has been placed making ready
for asphaltic paving after curbs have been poured. The driveways and
curbs have been marked out and some have been removed. The Lynnwood Operations and Maintenance Center (LOMC) driveways are
still closed and will remain closed for another 2 to 3 weeks.
Next week Kamin’s intends to have their concrete
sub-contractor to begin placing curbs and driveways. The fiber optic
wiring will be placed back into the permanent conduits along the East side of
the roadway and spliced back into permanently at the LOMC building. The
remaining roadway excavation to be done will be completed and new base rock
will be placed. Kamin’s intends to work Tuesday through Friday of the
upcoming week.
For more information and to see pictures of this project visit the project website.
 |
|
This project will replace the water and sewer line on 60th Avenue
West between 204th Street SW and 207th Place SW repairing the roadway
settlement, realigning storm utility, replacing sidewalk/curb/gutter,
replacing driveway aprons, adjusting existing utilities, and general
landscaping restoration.
|
|