|
Weekend Service Impacts
-
Routes 3, 4, and 60 will have stop #12910 9th Avenue & Jefferson Street (southbound) closed from Saturday, October 31 to Sunday, November 1 8 a.m. to 8 p.m. daily due to construction;
-
Routes 7 and 70 will have stop #880 Virginia Street & 6th Avenue (eastbound) closed from Saturday, October 31 at 7 a.m. to Sunday, November 1 at 8 p.m. due to construction;
-
Route 40 will have stop #19260 24th Avenue NW & NW 80th Street (southbound) closed from Saturday, October 31 to Sunday, November 1 7 a.m. to 5 p.m. daily due to construction;
-
Route 220 will have stop #82742 112th Avenue NE & Main Street (southbound) and stop #80492 112th Avenue NE & NE 4th Street (southbound) closed from Saturday, October 31 to Sunday, November 1 from 8 a.m. to 6 p.m. daily due to construction;
-
Route 240 will have stop #82735 Main Street & 110th Place SE closed from Saturday, October 31 to Sunday, November 1 from 8 a.m. to 6 p.m. daily due to construction;
-
ST 522 to Woodinville will be rerouted off I-405 between Beardslee Boulevard and SR-522 from Friday, October 30 to Monday, November 2 from 10 p.m. to 4 a.m. nightly due to construction;
-
ST 545 to Redmond will be rerouted in the Downtown Seattle area from Friday, October 30 at 9 p.m. to Monday, November 2 at 5 a.m. due to construction;
-
ST 556 to Bellevue TC will be rerouted off Bellevue Way NE and NE 4th Street between Main Street and 108th Avenue NE from Saturday, October 31 to Sunday, November 1 from 7 a.m. to 6 p.m. daily due to construction;
Full information available on our Service Advisories page.
Service Reminders
|
|
Pacific Standard Time officially starts at 2 a.m. on Sunday, November 1, 2026
 The November 1 time change can create a one hour longer wait for riders on some overnight routes between the last Saturday night bus trip and the first Sunday morning bus trip.
If the trip you are riding is shown on the Saturday timetable, it will operate on Pacific Daylight Time. If the trip is shown on the Sunday timetable, it will operate on Pacific Standard Time.
Northbound full weekend closure ahead as Revive I-5 work takes a pause
Critical repair work to the northbound lanes of I-5 across the Ship Canal Bridge is complete and workers will begin removing equipment during a total shutdown in that direction the weekend of October 30, said the Washington State Department of Transportation (WSDOT).
In the event weather is not suitable for restriping the roadway that weekend, the closure will be rescheduled and the two-lane reduction across Ship Canal Bridge will remain in place.
It’s the last step before all repaired northbound lanes permanently reopen.
WSDOT said crews require a full weekend to complete construction pick up activities which, include reconfiguring lanes, picking up pinned barriers and restriping lanes and shoulders. Once pick up is complete, major scheduled Revive I-5 closures will conclude for the year. People should, however, continue to expect overnight closures and early closures of the express lanes, which will return to normal operations, as crews continue with bridge maintenance and drainage improvements on the underside of the Ship Canal Bridge. The northbound express lanes will remain open only until 4 a.m. Monday, November 2.
|
|
Metro completes study on possible transit improvements for Route 60
 This blog post is also available in: አማርኛ (Amharic) 简体中文 (Simplified Chinese) Af Soomaali (Somali) Español (Spanish) Tiếng Việt (Vietnamese)
King County Metro, in collaboration with the Seattle Department of Transportation, is exploring transit improvements for Route 60 to reduce bus travel times and improve reliability. Route 60—which runs from Capitol Hill to White Center— connects riders to jobs, schools, health care, essential services, and local businesses, which plays an important role in daily mobility for thousands of people.
Route 60 serves an average of 6,200 riders each weekday. About 70% of all Route 60 buses arrive on time, performing below Metro’s on-time performance goal of at least 80%. This makes the route a candidate for investments to address delays and inconsistent travel times. The project team identified potential transit improvements that can provide faster, more reliable bus service.
Learn more about possible improvements to Route 60 on the Metro Matters blog.
|
|
Local students learn the ins and outs of transit through Metro’s Youth Transit Summer Internship
 For three weeks this summer, 14 teenagers from around King County participated in Metro’s fourth annual Youth Transit Summer Internship.
The program provided an opportunity for the young people to learn about transit, engage with our frontline staff and local community, paint a bus shelter mural, explore careers, and develop social media content. They also provided great input to Metro about how to improve our transit messaging for young people.
Read about the 2026 internship class on the Metro Matters blog.
|
|
 Metro is hiring transit operators (bus drivers) and trades professionals to keep the region moving. Visit kingcounty.gov/MetroCareers to learn more.
|
|
|
|
|