Westside Highway SW road closure, July 29 - September 9

Westside Highway SW road closure, July 29 - September 9

On Monday, July 29, at 9 a.m., repair work will begin on a storm-damaged section of Westside Highway SW, from McIntyre Road SW to SW Cove Road, on Vashon Island. The work includes repairing the adjacent slope and improving drainage, and requires a full closure of this section of roadway. The road is expected to reopen on Monday, September 9 at 5 p.m.

A detour route will be posted on site along with signage to guide traffic around the construction area.

Visit the My Commute webpage to view the map. Click here to view the detour route. 

Follow us on Twitter: www.twitter.com/kcroads.Follow us on Twitter