For the Week of August 08, 2021
Weekly Hydro Ship Activity Report
Welcome to NOAA's Weekly Hydrographic Ship Activity Report! We hope you enjoy this reader-friendly layout for our weekly report as we update you on the progress of our NOAA-ship and contractor-run surveys. Please continue to direct your correspondences to progress.sketches@noaa.gov.
Highlights of this edition
- NOAA Ship Fairweather resumed acquisitions on OPR-P358-FA-21 Prince William Sound, AK. The field unit also conducted UAS testing in conjunction with RSD Augmenters in Odiak Channel.
- DEA continued hydrographic survey operations in OPR-J315-KR-21 Pascagoula, MS. They are currently in port for Tropical Storm Fred and will be monitoring Tropical Depression Grace.
NOAA Ships
FERDINAND R. HASSLER
OPR-C319-FH-21 Approaches to New York
Recap
-
Ferdinand R. Hassler filled all holidays on H13474, and continued work on sheets H13475 and H13476. Sheet H13477 was opened and is 50% complete.
|
|
|
|
-
Ferdinand R. Hassler will enter into a crew rest and shelter-in-place period until 29AUG2021
THOMAS JEFFERSON
OPR-E349-TJ-21 Central Chesapeake Bay, MD
Recap
-
Thomas Jefferson is inport for ship maintenance and crew reset alongside Norfolk, VA.
|
|
|
|
-
Thomas Jefferson is alongside Norfolk, VA, until the scheduled departure on 18AUG2021.
FAIRWEATHER
OPR-P358-FA-21 Prince William Sound, AK
Recap
-
Fairweather surveyed on H13418, H13422, and H13433. The last day of acquisition was 12AUG2021, when they commenced in port transit.
|
|
|
|
- The field unit conducted UAS testing in conjunction with RSD Augmenters on 10AUG, 11AUG, and 12AUG in Odiak Channel.
Looking Forward
-
Fairweather plans to retrieve shore power cables in Juneau on 14AUG, and continuing transit to inport in Ketchikan, AK, on 17AUG.
RAINIER
OPR-P336-RA-21 North Coast of Kodiak Island, AK
Recap
-
Rainier is alongside Juneau, AK, for crew rest and shelter-in-place.
|
|
|
|
Looking Forward
-
Rainier is alongside Juneau, AK, until the scheduled departure on 16AUG2021.
Contracted Vessels
OPR-J315-KR-21 Pascagoula, MS
Recap
-
Blake acquisition in survey areas H13488 and H13489.
-
Broughton acquisition in survey area H13487.
- One day down for Blake repairs and two weather days.
Looking Forward
- Currently in port for Tropical Storm Fred.
- Resume survey operations with Blake in H13489 and Broughton in H13487.
- Monitor Tropical Depression Grace.
- Scheduled crew rotation / port call 20AUG 2021.
|
OPR-Y390-KR-21 Green Bay, WI
Recap
- All vessels continued main scheme collection in H13473 using multi-vessel acquisition.
-
RV Endeavor collected investigation and fill data in H13470 and H13472.
-
RV Rapid collected investigation and fill data in H13472 and H13473 and cross lines in H13473.
- Weather hours occurred on 11AUG and 12AUG2021. RV Voxel had mechanical issues on 13AUG and 14AUG.
Looking Forward
-
RV Endeavor will complete bottom sample acquisition.
-
RV Endeavor and RV Rapid will complete mainscheme collection in H13473 and fill in H13467, H13470, H13472, and H13473.
-
RV Voxel will complete a closing patch test and will be hauled out in Oconto, WI.
|
OPR-K380-KR-21 Port Freeport & Approaches, TX
Recap
- The MV Atlantic Surveyor continued survey operations on H13503 (Sheet 2) and H13506 (Sheet 5).
- The RV Oyster Bay II and the field office were demobilized.
Looking Forward
- The MV Atlantic Surveyor survey operations will continue on H13503 (Sheet 2) and H13506 (Sheet 5).
|
OPR-Z394-KR-21 White Fish Bay, MI
Recap
- The RV Northstar Challenger continued 24‐hour survey operations with a port call mid‐week, and was able to survey through the weather conditions.
- The RV HF Stout and RV North Cove conducted daylight survey operations as permitted by weather.
Looking Forward
- All three boats will continue to apply remaining mileage to the three priority sheets, conduct fills and investigations, and evaluate available mileage for the overflow sheet.
|
OPR-R340-KR-21 Approaches to Egegik Bay, AK
Recap
- Crew rotation in Dillingham completed as scheduled on 10AUG2021, with survey resuming 11AUG.
- MBES collection occurred in Sheets H13438, H13440, and H13441. H13440 mainscheme collection is complete. Sealegs collected additional mainscheme data outside the bay in H13438 on 11AUG.
- GPS buoy telemetry reports no issues as of 13AUG.
- Surveying in H13441 at end of day 14AUG.
- Shore crew (JOA) travelled to Egegik and Pilot Point, both installs were successful and crew returned to Anchorage.
Looking Forward
- Prioritize H13438, and nearshore work (including Egegik Bay) with the Sealegs vessel when weather and tides allow.
S-R364-KR-21 Bering Sea Reconnaissance Survey
Recap
-
SD1033 and SD1067 continued survey along route 1a.
-
SD1030 and SD1034 continued survey along route 1b.
- Anemometer failed on SD1033 on 10AUG2021 and not expected to return to functionality during the mission. However, the vessel is still paired with SD1067 which has a working anemometer.
- Routes 1a and 1b were reduced in length and the vessels began following the shortened routes on 12AUG.
- The unmanned surface vehicles (USVs) were not in close proximity to any whaling communities this week.
Looking Forward
- The vessels will likely complete routes 1a and 1b due to their shortened length.
- They are likely to either minimally be in transit to 2a and 2b by the end of the week, or possibly on site at 2a and 2b.
- USVs are not scheduled to be in close proximity to any whaling communities next week.
|
|