SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS - FIREX WEEK OF 29 APR - 05 MAY 24/HAZ OPS/CCGD5 BNM 0216-24

united states coast guard

1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (LOCAL) SURFACE GRIDS AREA BOUND BY
---- ------------ ------------- -------------
27-29 APR 2015-2115 2-7, 10-14, 19, 21 34-28N7 076-25W0
30 APR 2015-2100 35-13N2 075-05W7
01-03 MAY 2000-2100 34-14N2 073-57W2
32-39N7 076-12W6
32-39N7 076-42W9
33-00N6 076-42W9
33-33N2 076-55W3
34-05N2 076-06W9
29 APR-05 MAY 0000-2400 17 34-17N5 076-45W2
33-49N9 076-30W6
33-33N2 076-55W3
34-04N1 077-07W1
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANCELLED.
CANCEL AT//060600Z MAY 24//

BT