There will be ACE PRODUCTION regularly-scheduled Maintenance Saturday evening, December 5, 2020 from 10:00pm ET to 4:00am ET Sunday, December 6, 2020 for ACE Infrastructure maintenance and the following ACE Deployment:
ACE Import Manifest – Truck Manifest
• A fix for Ticket #13632809: When truck trips with a very large number of in-bond shipments were released from primary processing, the Conveyance Departure event did not communicate properly to M1, resulting in the arrivals of in-bonds to get rejected. This caused each shipment a missing "89 (Depart Bill of Lading from Intermediate Port)" status notification (in-bond NS message) and bill transaction posting; and corresponding entries filed at destination to get stuck in an "admissible" status.
PGA/ITDS
- FDA/FOO - fixed bug in PN rule to reject in conditions when mandatory PG19 entity is missing
- FDA/FOO/CCW - Entry should not be accepted when FDA product code is not valid for the program/processing codes
- FDA/FOO - implemented fix related to valid source type codes
- FDA/BIO - Entry should not be accepted when mandatory PG20 country is missing
- FDA/FOO - fixed bug in PN rule to reject in conditions when mandatory PG23 AofC 'VFT' is missing
- FDA/FOO – fixed bug related to entity role codes allowed if LPCO type = PNC is not provided
- FDA/PE Spec validation rules enforcement
- FDA /804 – Canadian drug functionality (Processing Code 804)
- FWS status code and comments being sent on SO70 records
- FTZ bug fix for hold removal B4/BF NF message being sent to trade