There will be ACE PRODUCTION Scheduled Maintenance Saturday evening, February 22, 2020 from 2200 ET to 0400 ET Sunday, February 23, 2020 for the following ACE Deployments:
ACE Drawback
• New Drawback error message 575.
I575 is a new informational message for Drawback submissions with import entries that are entry type 06. The Drawback Error Dictionary has been updated to reflect this change (CSMS #41629711 - Updated Drawback Error Dictionary (v16) Posted on CBP.gov)
ACE FTZ
• Implementation of new / updated error messages, per CSMS #41569664 - New FTZ Error Codes deployment to ACE Production.
028 - FIRMS CODE NOT ON FILE
051 - FIRMS NOT BONDED FACILITY TYPE
127 - FIRMS CODE REQUIRED FOR PORT
210 - FIRMS CODE IS DEACTIVATED
211 - FIRMS CODE IS NOT AN FTZ
212 - NO TYPE 4 BOND LISTED ON FIRMS
213 - NO ACTIVE BOND LISTED ON FIRMS
A DRAFT version of Appendix P – e214 FTZ Error Codes has been published to CBP.gov under the DRAFT section of the CATAIR:
https://www.cbp.gov/document/technical-documentation/draft-ace-catair-appendix-p