Havering Travel Update
Information from Havering Council about possible travel hotspots in the next week
Edition 5: Friday 22 August 2014
|
|
 |

Havering Show temporary restrictions
The Havering Show takes place from 11am until 6pm at Harrow
Lodge Park, Hornchurch on Sunday 24 August and Bank Holiday Monday 25 August 2014.
There may be traffic congestion in the area so alternative
routes are advisable unless attending the show.
In addition, there will be temporary parking restrictions
between 11.30am and 5.30pm on both days on the park side of Abbs Cross Lane, between the
junction with Hornchurch Road and 136 Abbs Cross Lane.
To aid police access in the area, The Avenue will be one-way from
Abbs Cross Lane to Station Lane and Stanley Road will be one-way from Station
lane to Abbs Cross Lane.
|
Roadworks
On Friday 22 August 2014 between 9am and 4pm and on Tuesday 26 August 2014 from 6.30pm until Wednesday 27 August 2014 at 6.30am Ockendon Road, Upminster will be closed in both directions between its junctions
with Fen Lane and Clay Tye Road. Diversions will be in place.
Until Friday 22 August 2014 UK Power
Networks are working on electricity cables outside 27 Crow Lane, Romford.
Temporary traffic lights will be in use.
From Tuesday 26 August 2014 until Monday 1 September 2014 Morrison
Utility Services will be carrying out work outside 181 Upminster Road South, Rainham. Temporary traffic lights will be used.
From Tuesday 26 August 2014 until 2017 work by Transport for London (Tfl) to replace
the bridge which takes the A127 over the railway at Ardleigh Green is taking place. During this work there will be a 30mph speed
limit in place and some off-peak lane closures (10am until 3pm and 10pm until
5am).
From Wednesday 27 August 2014 until Friday 29 August 2014
Suttons Lane, Standen Avenue and Station Lane, Hornchurch will be closed each day between 6.30pm
and 6.30am. Diversions will be in place.
Ravenscourt Grove, Suttons Avenue and Suttons Gardens, Hornchurch will be closed from 6.30pm on Friday
29 August 2014 until 6.30am on Saturday 30 August 2014 and again between 6.30pm and
6.30am each day from Monday 1 September 2014 until Thursday 4 September 2014.
Until Sunday 7 September 2014 electricity cable ducts are being installed in Squirrells Heath Road, Harold Wood between the junction of Gubbins Lane and Redden Court Road. Temporary traffic lights will be used.
Until December 2014 in
Butts Green Road, Hornchurch. National Grid is
carriying out gas mains replacements in a half-mile stretch between Berther
Road and Slewins Lane. Temporary traffic lights will be used.
London Bridge rail
station from Saturday 23 August 2014 until Sunday 31 August 2014
Passengers who
travel via London Bridge mainline rail station, which is being rebuilt by
Network Rail while remaining open, are being urged to plan ahead for the last
nine days of August.
No First Capital
Connect or Southern services will call at London Bridge mainline rail station
and there will be no direct trains to Gatwick or Luton Airport stations.
London Bridge
Underground station will remain open.
More information is available here.
Public Transport updates
 |
|
The latest travel information about rail services through Rainham, Upminster and Upminster Bridge stations from c2c rail can be found here.
|
 |
|
The latest travel information about rail services through Emerson Park,
Gidea Park, Harold Wood, Romford and Upminster stations from Greater Anglia can be found here. |
|