I-35 from FM 3009 to FM 1518
Northbound
- Sunday, February 9, until Tuesday, February 11, 9 p.m. to 5 a.m. Multiple mainlane closures (3), exit ramp, and entrance ramp of northbound I-35 from Evans Road to Roy Richard Drive (FM 3009) for barrier work. Traffic should use next available ramps.
Southbound
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road, entrance ramp and exit ramp from Schertz Parkway to Corporate Drive for sidewalk, drainage, and driveway work. Traffic should follow detour signs.
- Sunday, February 9, until Tuesday, February 11, 9 p.m. to 5 a.m. Multiple mainlane closures (3), and entrance ramp closure, and exit ramp closure of southbound I-35 from Roy Richard Drive (FM 3009) to Schertz Parkway for column and cap work. Traffic should use next entrance and exit ramps.
- Monday, February 10, until Friday, February 14, 9 a.m. to 3 p.m. Left lane closure on southbound frontage road of I-35 from Alamo Parkway to Corporate Drive for traffic signal equipment installation work.
I-35 from FM 1518 to Loop 1604
Northbound
- Through Saturday, August 2, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for construction work.
- Through Monday, May 5, long-term closure (24/7). Exit ramp closure on northbound I-35 to Evans Road for construction work.
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road from Forum Parkway to Forum Access Road for drainage and barrier work.
- Sunday, February 9, until Tuesday, February 11, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road and exit ramp from Forum Parkway to Evans Road for cap work. Traffic should follow detour signs.
- Friday, February 14, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 frontage road from Agora Parkway to Forum Access Road, northbound I-35 collector ramp, and Forum Parkway intersection at I-35 for column and cap work. Traffic should follow detour signs.
Southbound
- Through Sunday, May 25, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, southbound I-35 entrance ramp at Old Austin Road, westbound I-35 collector ramp, northbound and southbound I-35 connector ramp to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for bridge deck work. Traffic should follow detour signs.
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Multiple mainlane closures (3) of southbound I-35 from Forum Parkway to Ferrell Road for bridge structure, striping, and barrier work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Schertz Parkway to Forum Parkway for bridge structure work.
- Sunday, February 9, until Thursday, February 13, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Forum Parkway to Gateway Boulevard for striping, barrier, temporary pavement, and demolition work. Traffic should follow detour signs.
- Sunday, February 9, until Tuesday, February 11, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from Old Austin Road to Forum Parkway for bridge deck work. Traffic should follow detour signs.
- Sunday, February 9, until Thursday, February 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Corporate Drive to Evans Road and Evans Road at I-35 intersection for bridge column and cap work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Retama Parkway to Forum Parkway for bridge deck work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Evans Road to Arcadia Drive and northbound to southbound turnaround of Evans Road at I-35 intersection for bridge deck work. Traffic should follow detour signs.
- Monday, February 10, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, southbound I-35 entrance ramp at Old Austin Road, westbound I-35 collector ramp, northbound and southbound I-35 connector ramp to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for bridge deck work. Traffic should follow detour signs.
- Monday, February 10, until Thursday, February 13, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Forum Parkway to McMorris Boulevard for bridge column and cap work.
- Monday, February 10, until Thursday, February 13, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road from Corporate Drive to Evans Road and full closure of Evans Road intersection at I-35 for bridge beam setting. Traffic should follow detour signs.
- Monday, February 10, until Thursday, February 13, 8 p.m. to 6 a.m. Multiple mainlane closures (3) on southbound I-35 from Corporate Drive to Evans Road for bridge beam setting.
- Wednesday, February 12, until Friday, February 14, 9 p.m. to 5 a.m. Entrance ramp closure on southbound I-35 frontage road from Old Austin Road to Forum Parkway for PCP & deck work. Traffic should follow detour signs.
Loop 1604 Interchange
Northbound
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for bridge structure and roadway work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 frontage road to northbound I-35 frontage road, and northbound I-35 connector ramp from Agora Parkway to Forum Parkway for column and cap work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on northbound I-35 collector ramp at Loop 1604 interchange, northbound I-35 frontage road from Pat Booker Road to Loop 1604 interchange and westbound Loop 1604 frontage road at Agora Parkway to I-35 frontage road at Forum Parkway for straddle cap work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, exit ramp, and entrance ramp from Pat Booker Road to Loop 1604 for bridge column work. Traffic should follow detour signs.
- Sunday, February 9, until Tuesday, February 11, 9 p.m. to 5 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, exit ramp, and entrance ramp from Forum Parkway to Evans Road for bridge column and cap work. Traffic should use next exit and entrance ramps.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 collector ramp at the Loop 1604 interchange for drilled shaft work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on northbound I-35 collector ramp at Loop 1604 interchange, northbound I-35 frontage road from Pat Booker Road to Loop 1604 interchange and westbound Loop 1604 frontage road at Agora Parkway to I-35 frontage road at Forum Parkway for column, cap, and bridge beam work. Traffic should follow detour signs.
Southbound
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 connector ramp to southbound I-35 mainlanes for bridge deck work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 collector ramp at Loop 1604 interchange for bridge deck work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 collector ramp at I-35 interchange, southbound I-35 collector ramp at Loop 1604 interchange, northbound and southbound I-35 connector ramps to westbound Loop1604 mainlanes, eastbound Loop 1604 connector ramp to northbound and southbound I-35 mainlanes, northbound I-35 exit ramp to Olympia Parkway, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to McMorris Boulevard, and IKEA-RBFCU Parkway intersection at Loop 1604 for bridge deck work. Traffic should follow detour signs.
- Monday, February 10, 8 p.m. to 6 a.m. Full closure on southbound I-35 collector ramp at Loop 1604 interchange for bridge deck work. Traffic should follow detour signs.
- Monday, February 10, until Wednesday, February 12, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 collector ramp at the I-35 interchange, and southbound I-35 connector ramp to eastbound Loop 1604 mainlanes for barrier work. Traffic should follow detour signs.
- Wednesday, February 12, until Saturday, February 15, 8 p.m. to 5 a.m. Full closure on westbound Loop 1604 collector ramp at I-35 interchange, southbound I-35 collector ramp at Loop 1604 interchange, northbound and southbound I-35 connector ramps to westbound Loop1604 mainlanes, eastbound Loop 1604 connector ramp to northbound and southbound I-35 mainlanes, northbound I-35 exit ramp to Olympia Parkway, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to McMorris Boulevard, and IKEA-RBFCU Parkway intersection at Loop 1604 for bridge beam setting. Traffic should follow detour signs.
- Thursday, February 13, until Saturday, February 15, 8 p.m. to 5 a.m. Full closure on westbound Loop 1604 collector ramp at I-35 interchange, southbound I-35 collector ramp at Loop 1604 interchange, northbound and southbound I-35 connector ramps to westbound Loop1604 mainlanes, eastbound Loop 1604 connector ramp to northbound and southbound I-35 mainlanes, northbound I-35 exit ramp to Olympia Parkway, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to McMorris Boulevard, and IKEA-RBFCU Parkway intersection at Loop 1604 for column cap setting. Traffic should follow detour signs.
Loop 1604 from I-35 Interchange to Nacogdoches Road
Eastbound
- Through Monday, March 31, long-term closure (24/7). Left lane closure on eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Boulevard for construction.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 collector ramp at I-35 interchange and eastbound Loop 1604 entrance ramp from Lookout Road to IKEA-RBFCU Parkway for bridge column and cap work. Traffic should follow detour signs.
- Monday, February 10, until Friday, February 14, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 mainlanes from Lookout Road to Pat Booker Road for bridge deck work. Traffic should follow detour signs.
- Monday, February 10, until Thursday, February 13, 8 p.m. to 6 a.m. Full closure of eastbound Loop 1604 mainlanes from Lookout Road to Pat Booker Road for bridge beam setting. Traffic should follow detour signs.
- Thursday, February 13, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 mainlanes from Gateway Boulevard to Pat Booker Road, full closure of eastbound Loop 1604 collector ramp at I-35 interchange and southbound I-35 collector ramp at Loop 1604 interchange for bridge deck work. Traffic should follow detour signs.
Westbound
- Monday, February 10, until Wednesday, February 12, 9 p.m. to 5 a.m. Full closure of westbound Loop 1604 mainlanes from Pat Booker Road to Lookout Road for bridge deck work. Traffic should follow detour signs.
- Monday, February 10, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of Lookout Road and turnarounds at Loop 1604 intersection for bridge deck work. Traffic should follow detour signs.
- Monday, February 10, until Wednesday, February 12, 9 p.m. to 5 a.m. Full closure of westbound Loop 1604 frontage road from Gateway Boulevard to Gateway Place for bridge deck work. Traffic should follow detour signs.
- Tuesday, February 11, until Thursday, February 13, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 mainlanes from Pat Booker Road to Gateway Boulevard, full closure of westbound Loop 1604 collector ramp at I-35 interchange, northbound I-35 connector ramp to westbound Loop 1604 mainlanes, and southbound I-35 collector ramp at Loop 1604 interchange for bridge deck work. Traffic should follow detour signs.
I-35 from Loop 1604 to Toepperwein Road
Northbound
- Through Wednesday, April 30, long-term closure (24/7). Full closure on I-35 northbound collector exit ramp and left lane closure on I-35 northbound frontage road from Pat Booker Road to Loop 1604 for bridge work.
- Through Wednesday, April 30, long-term closure (24/7). Entrance ramp closure from Shin Oak Drive to Pat Booker Road for bridge work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on northbound I-35, multiple lane closures (2) on northbound I-35 frontage road, entrance ramp and exit ramp closure from Toepperwein Road to Pat Booker Road for drilled shaft, column, and cap work.
- Sunday, February 9, until Tuesday, February 11, 9 p.m. to 5 a.m. Multiple mainlane closures (3), exit ramp of northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge column and cap work. Traffic should use next exit and entrance ramps.
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Full closure of Pat Booker Road at I-35 intersection and northbound I-35 exit ramp to Pat Booker Road for bridge structure work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road from Shin Oak Drive to Pat Booker Road for column and cap work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3) of northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure work.
Southbound
- Through Monday, June 30, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp, and exit ramp closures from Pat Booker Road to Toepperwein Road for bridge deck work.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Shin Oak Drive to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 frontage road at IKEA-RBFCU Parkway to southbound I-35 frontage road at Pat Booker Road, eastbound Loop 1604 connector ramp to southbound I-35 mainlanes, and southbound I-35 collector ramp closure at the Loop 1604 interchange for barrier work. Traffic should follow detour signs.
I-35 from Toepperwein Road to O’Connor Road
Northbound
- Through Sunday, April 13, long-term closure (24/7). Exit ramp closure on northbound I-35 to Toepperwein Road for construction work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp and entrance ramp closures from O’Connor Road to Judson Road for drilled shaft, column, and cap work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Judson Road to Toepperwein Road for drilled shaft, column, and cap work.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road and exit ramp from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, and entrance ramp from O’Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
Southbound
- Through Friday, February 28, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Crownpoint Drive for construction work.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Toepperwein Road to Judson Road for bridge deck work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp, and exit ramp closures from Judson Road to O’Connor Road for drilled shaft, column, and cap work.
- Monday, February 10, until Tuesday, February 11, 9 a.m. to 3 p.m. Right lane closure on southbound frontage road of I-35 from Crownpoint Drive to O’Connor Road for traffic signal equipment installation work.
- Monday, February 10, until Friday, February 14, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column cap setting. Traffic should follow detour signs.
I-35 from O’Connor Road to Thousand Oaks Drive
Northbound
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, alternating lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Thousand Oaks Drive to Weidner Road for drainage and drilled shaft work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, multiple lane closures (2) of northbound I-35 frontage road, right lane closure of eastbound O’Connor Road at I-35 intersection, and entrance ramp and exit ramp closures from Weidner Road to O’Connor Road for drainage and drilled shaft work.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, entrance ramp, and exit ramp from Starlight Terrace to Weidner Road, southbound to northbound turnaround at I-35 and Starlight Terrace intersection, northbound to southbound turnaround at I-35 and Weidner Road intersection for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure on northbound frontage road and exit ramp closure of I-35 from Weidner Road to O’Connor Road for barrier and striping work. Traffic should follow the detour signs.
Southbound
- Through Saturday, March 1, long-term closure (24/7). Right lane closure on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for bridge work.
- Through Thursday, May 22, long-term closure (24/7). Entrance ramp closure on southbound I-35 from O’Connor Road for bridge work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures (2) on southbound I-35 frontage road, and entrance ramp and exit ramp closures from O’Connor Road to Weidner Road for drilled shaft, column, and cap work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, and entrance ramp and exit ramp closures from Weidner Road to Thousand Oaks Drive for drainage and drilled shaft work.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from O’Connor Road to Tech Com Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Tech Com Drive to Weidner Road for cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp closure from Crownpoint Drive to O’Connor Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive for sidewalk and curb installation work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 6 a.m. Full closure of southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive for column work. Traffic should follow detour signs.
- Tuesday, February 11, until Saturday, February 15, 8 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Weidner Road to Thousand Oaks Drive for column cap setting.
- Tuesday, February 11, until Saturday, February 15, 8 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive, southbound to northbound turnaround of Thousand Oaks Drive at I-35 intersection, and northbound to southbound turnaround closure of Weidner Road at I-35 intersection for column cap setting. Traffic should follow detour signs.
I-35 from Thousand Oaks Drive to I-410 North Interchange
Northbound
- Through Tuesday, March 4. Left lane closure on northbound frontage road of I-35 from Randolph Boulevard to Starlight Terrace for bridge work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road from Crestway Drive to Weidner Road and Starlight Terrace at I-35 intersection for drainage, drilled shaft work, and cap work. Traffic should follow detour signs.
Southbound
- Through Tuesday, April 1, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
- Through Saturday, February 22, long-term closure (24/7). Southbound to northbound turnaround closure at Thousand Oaks for construction work.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 6 a.m. Full closure on southbound I-35 frontage road, exit ramp, and entrance ramp from Randolph Boulevard to Walzem Road for bridge deck work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 6 a.m. Full closure of southbound I-35 frontage road, and exit ramp from Thousand Oaks Drive to Randolph Boulevard, and northbound to southbound turnaround at Thousand Oaks Drive and I-35 intersection for column, and cap work. Traffic should follow detour signs.
- Tuesday, February 11, until Friday, February 14, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road and exit ramp from Thousand Oaks Drive to Randolph Boulevard and northbound to southbound turnaround of Thousand Oaks Drive at I-35 intersection for column cap setting. Traffic should follow detour signs.
- Tuesday, February 11, until Friday, February 14, 8 p.m. to 6 a.m. Multiple mainlane closures (2) on southbound I-35 from Thousand Oaks Drive to Randolph Boulevard for column cap setting. Traffic should follow detour signs.
I-410 North Interchange
Northbound
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 connector ramp to westbound I-410 mainlanes and entrance ramp from Randolph Boulevard to westbound I-410 mainlanes for bridge deck and cap work. Traffic should follow detour signs.
Southbound
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of southbound I-35 connector ramp to westbound I-410 mainlanes, Randolph Boulevard at I-35 intersection and southbound I-35 frontage road from Randolph Boulevard to Fratt Road for cap work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 6 a.m. Full closure of eastbound I-410 connector ramp to southbound I-35 mainlanes for bridge deck work. Traffic should follow detour signs.
I-410 North from Austin Highway (Loop 368)
Southbound
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Exit ramp from westbound I-410 mainlanes to southbound Austin Highway (Loop 368) for cap work. Traffic should use next exit ramp.
I-410 North from I-35 Interchange to Starcrest Drive
Eastbound
- Monday, February 10, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple mainlane closures (2) and entrance ramp of eastbound I-410 from Quail Creek Drive to Perrin Beitel for striping and barrier work.
- Monday, February 10, until Saturday, February 15, 9 p.m. to 5 a.m. Alternating lane closures on eastbound I-410 frontage road and entrance ramp closure from Perrin Beitel to Austin Highway (Loop 368) for cap work. Traffic should follow detour signs.
Westbound
- Through Tuesday, April 1, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure on westbound I-410 frontage road from Randolph Boulevard to Perrin Creek and northbound Austin Highway (Loop 368) frontage road from Interchange Parkway to westbound I-410 frontage road for cap work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of westbound I-410 frontage road and exit ramp from Perrin Creek to Perrin Beitel, and connector ramp from northbound Austin Highway (Loop 368) to westbound I-410 frontage road for bridge deck work. Traffic should follow detour signs.
- Sunday, February 9, until Saturday, February 15, 9 p.m. to 5 a.m. Full closure of entrance ramp on westbound I-410 frontage road from Perrin Creek to Perrin Beitel and exit ramp to Austin Highway (Loop 368) from southbound I-35 connector ramp to westbound I-410 mainlanes for cap work. Traffic should follow detour signs.
I-410 North from Starcrest Drive to Nacogdoches Road
Eastbound
- Through Friday, February 28, long-term closure (24/7). Left lane closure on eastbound frontage road of I-410 from Harry Wurzbach to Starcrest Drive for construction.
- Monday, February 10, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3) and entrance ramp of eastbound I-410 from Harry Wurzbach Road to Quail Creek Drive for striping and barrier work.
I-35 from I-410 North Interchange to Walzem Road
Northbound
- Monday, February 10, until Saturday, February 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3) of northbound I-35 from Walzem Road to Windcrest Drive for barrier and drilled shaft work.
I-35 from Walzem Road to Eisenhauer Road
Northbound
- Sunday, February 9, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 frontage road from Eisenhauer Road to Galahad Drive for drilled shaft work.
- Sunday, February 9, 9 p.m. to 5 a.m. Multiple left lane closures (2) on northbound I-35 frontage from Galahad Drive to Walzem Road for column work.
- Sunday, February 9, 9 p.m. to 5 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Innovation Way to Walzem Road for column work.
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for column work. Traffic should use next entrance ramp.
- Monday, February 10, until Friday, February 14, 9 p.m. to 5 a.m. Northbound to southbound I-35 frontage road turnaround closure at Walzem Road for column work.
- Monday, February 10, until Friday, February 14, 9 p.m. to 5 a.m. Multiple left lane closures (2) on northbound I-35 frontage from Galahad Drive to Walzem Road for column work.
- Monday, February 10, until Friday, February 14, 9 p.m. to 5 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Innovation Way to Walzem Road for column work.
- Friday, February 14, 11 p.m. to 7 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for column work. Traffic should use next entrance ramp.
- Friday, February 14, 11 p.m. to 7 a.m. Northbound to southbound I-35 frontage road turnaround closure at Walzem Road for column work.
- Friday, February 14, 11 p.m. to 7 a.m. Multiple left lane closures (2) on northbound I-35 frontage from Galahad Drive to Walzem Road for column work.
- Friday, February 14, 11 p.m. to 7 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Innovation Way to Walzem Road for column work.
- Saturday, February 15, 9 p.m. to 8 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for column work. Traffic should use next entrance ramp.
- Saturday, February 15, 9 p.m. to 8 a.m. Northbound to southbound I-35 frontage road turnaround closure at Walzem Road for column work.
- Saturday, February 15, 9 p.m. to 8 a.m. Multiple left lane closures (2) on northbound I-35 frontage from Galahad Drive to Walzem Road for column work.
- Saturday, February 15, 9 p.m. to 8 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Innovation Way to Walzem Road for column work.
Southbound
- Sunday, February 9, 9 p.m. to 5 a.m. Southbound to northbound I-35 frontage road turnaround closure at Eisenhauer Road for drilled shaft work.
- Monday, February 10, until Thursday, February 13, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 frontage road from Lanark Drive to Eisenhauer Road for utilities work.
I-35 from Eisenhauer Road to Rittiman Road
Northbound
- Through Tuesday, February 18, long-term closure (24/7). Right lane closure on northbound I-35 frontage road from Barrel Creek to Center Park Boulevard for utilities work.
I-35 from Rittiman Road to I-410 South Interchange
Northbound
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Exit ramp closure on northbound I-410 mainlanes to Rittiman Road for striping and barrier work. Traffic should use next exit ramp.
Southbound
- Sunday, February 9, until Friday, February 14, 9 p.m. to 5a.m. Multiple left lane closures (2) on southbound I-35 frontage road from Tejasco to Petroleum Drive for drilled shaft work.
- Monday, February 10, until Friday, February 14, 9 p.m. to 5 a.m. Multiple left lane closures (2) on southbound I-35 frontage road from Tejasco Road to Petroleum Drive for drilled shaft work.
- Friday, February 14, 11 p.m. to 7 a.m. Multiple left lane closures (2) on southbound I-35 frontage road from Tejasco to Petroleum Drive for drilled shaft work.
- Friday, February 14, 11 p.m. to 7 a.m. Multiple left lane closures (2) on southbound I-35 frontage road from Tejasco Road to Petroleum Drive for drilled shaft work.
- Saturday, February 15, 9 p.m. to 8 a.m. Multiple left lane closures (2) on southbound I-35 frontage road from Tejasco to Petroleum Drive for drilled shaft work.
- Saturday, February 15, 9 p.m. to 8 a.m. Multiple left lane closures (2) on southbound I-35 frontage road from Tejasco Road to Petroleum Drive for drilled shaft work.
- Sunday, February 16, 9 p.m. to 5 a.m. Multiple left lane closures (2) on southbound I-35 frontage road from Tejasco Road to Petroleum Drive for drilled shaft work.
Eastbound
- Wednesday, February 12, until Friday, February 14, 9 p.m. to 5 a.m. Right turn lane closure on eastbound Rittiman Road to southbound I-35 frontage road for drainage work.
I-35 and I-410 South Interchange
Southbound
- Friday, February 14, through Monday February 17, 9 p.m. to 5 a.m. Full closure on southbound I-35 connector ramp and entrance ramp to I-410 South for bridge work. Traffic should follow detour signs.
I-35 from I-410 South to Petroleum Drive
Northbound
- Through Friday, March 21, long-term closure (24/7). Left lane closure on the northbound I-35 frontage road to southbound I-410 frontage road for utilities work.
- Monday, February 10, until Friday, February 14, 9 p.m. to 7 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for sweeping and debris work.
- Friday, February 14, 11 p.m. to 7 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for sweeping and debris work.
I-410 South from I-35 to Binz Engleman Road
Northbound
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Alternating lane closures on northbound I-410 frontage road from Binz Engleman Road to Space Center Drive for striping and barrier work.
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Right lane closure on northbound I-410 mainlanes from Binz Engleman Road to Space Center Drive for striping and barrier work.
- Sunday, February 9, until Wednesday, February 12, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-410 frontage road between Binz Engleman Road and Space Center Drive for striping and barrier work. Traffic should use next entrance ramp.
- Monday, February 10, through April 16, long-term closure (24/7) Entrance ramp closure on northbound I-410 frontage road between Binz Engleman and Rittiman Road for bridge work. Traffic should follow detour signs.
- Monday, February 10, until Thursday, February 13, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road between Winnco Drive and Space Center Drive for utilities work. Traffic should use next entrance ramp.
- Monday, February 10, until Thursday, February 13, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 frontage road from Winnco Drive to Space Center Drive for utilities work.
Soutbound
- Monday, February 10, until Monday, February 17, 9 p.m. to 5 a.m. Exit ramp closure on southbound I-410 to Binz Engleman Road for drilled shaft work. Traffic should use prior exit ramp.
- Monday, February 10, until Monday, February 17, 9 p.m. to 5 a.m. Right lane closure on southbound I-410 mainlanes from Greatfare to Binz Engleman Road for drilled shaft work.
- Friday, February 14, 11 p.m. to 7 a.m. Exit ramp closure on southbound I-410 to Binz Engleman Road for drilled shaft work. Traffic should use prior exit ramp.
- Friday, February 14, 11 p.m. to 7 a.m. Right lane closure on southbound I-410 mainlanes from Greatfare to Binz Engleman Road for drilled shaft work.
- Saturday, February 15, 9 p.m. to 8 a.m. Exit ramp closure on southbound I-410 to Binz Engleman Road for drilled shaft work. Traffic should use prior exit ramp.
- Saturday, February 15, 9 p.m. to 8 a.m. Right lane closure on southbound I-410 mainlanes from Greatfare to Binz Engleman Road for drilled shaft work.
- Sunday, February 16, 9 p.m. to 5 a.m. Exit ramp closure on southbound I-410 to Binz Engleman Road for drilled shaft work. Traffic should use prior exit ramp.
- Sunday, February 16, 9 p.m. to 5 a.m. Right lane closure on southbound I-410 mainlanes from Greatfare to Binz Engleman Road for drilled shaft work.
OTHER LANE CLOSURES
- For your information, there are other lane closures underway within the I-35 NEX project this week, but they are not expected to affect traffic or create notable delays.
|