|
 Traffic impacts
-
Lusted Road (between Hosner Road and Altman Road) July 19 and 26: Flagged two-way traffic on Saturdays while crews complete testing and install services for new Pleasant Home Water District water lines.
-
Dodge Park Boulevard (west of Cottrell Road) July 19 and 26: Flagged two-way traffic on Saturdays while crews set up equipment for clearing the public right-of-way on the south side of Dodge Park Boulevard.
-
Lusted Road (near county line) July 21 and 22: Flagged two-way traffic while crews complete exploratory pipeline work.
What to expect:
- Flaggers and temporary traffic controls to direct traffic
- Local and emergency access will be maintained
- Normal traffic flow outside shift hours
Other work happening the week of July 21
Staff will be at the project work sites during shift hours to perform various tasks. Work hours will be between 7 a.m. and 6 p.m., Monday through Saturday.
Filtration facility site activities include:
-
Off-hauling clean soils to permitted locations using approved haul routes
-
Delivering equipment and materials to the site
-
Remobilizing construction equipment
- Installing concrete formwork, piping, and utilities on site
- Completing repairs on overflow basin
-
Ongoing stormwater management and erosion control
- As needed street sweeping
- Ongoing 24/7 site security
Finished water pipeline site activities include:
- Clearing remaining material from public right-of-way along south side of Dodge Park Boulevard from Cottrell Road to where the finished water pipeline crosses Dodge Park Boulevard (about half-way between Cottrell and Altman roads)
- Remobilizing construction equipment
- Ongoing stormwater management and erosion control
Finished water intertie site activities include:
- Remobilizing construction equipment
- Ongoing stormwater management and erosion control
Raw water tunnel/pipeline site activities include:
- Remobilizing construction equipment
- Ongoing stormwater management and erosion control
What’s coming up
-
Single-lane closure on Altman Road between Pipeline Road and Lusted Road — estimated start July 29
-
Single-lane closure on Dodge Park Boulevard west of Cottrell Road intersection — Saturday 7/26 and 8/2, followed by ongoing Monday-Saturday lane closures this fall
-
Single-lane closure on Lusted Road east of Altman Road intersection — Saturday 7/26 and 8/2
-
Single-lane closure on Dodge Park Boulevard east of Cottrell Road intersection — estimated start in August
Neighbor information meetings
We are currently working to set the date and time for the next neighbor meeting in August. We will continue to share regular updates through our project e-news and on our website.
|
|
Get construction text alerts
Sign up to receive text notifications about temporary lane closures and other construction traffic information related to the Bull Run Filtration project.
|
|
|
The Bull Run Filtration Project will remove Cryptosporidium and other contaminants from the Bull Run water supply, producing cleaner, safer water for the one million people who use our water now and for future generations. The project is required by the federal Safe Drinking Water Act and must be in operation by September 30, 2027, through a bilateral compliance agreement with the Oregon Health Authority.
To learn more, visit portland.gov/water/filtration.
|
|
|
Know someone who would be interested in updates about the Bull Run Treatment Projects? Please share the news!

The City of Portland is committed to providing meaningful access. To request translation, interpretation, modifications, accommodations, or other auxiliary aids or services, or to file a complaint of discrimination, contact 503-823-4000 (311), Relay Service & TTY: 711
Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas Translation and Interpretation: 503-823-4000 (311), Relay: 711
This email was sent from an unmonitored inbox. Please do not reply. Instead, contact us at bullrunprojects@portlandoregon.gov.
|
|
|
|