|
Project overview
The Water Bureau is investing in reliable water service in North Portland. We will replace 1,800 feet of water main (pipe) with earthquake-resistant pipe and install six hydrants on North Schmeer Road.
|
|
Construction happening now
Construction will continue through August 2025.
The new water main (pipe) has been installed in the ground. Now crews will:
- Flush the new pipe with chlorinated water to sanitize the pipe
- Test the pipe to ensure it is sanitized
Once the new pipe is sanitized, we will connect it to existing service lines. Crews will:
- Notify neighbors of water shutoffs
- Shut off water from the existing pipe
- Connect the new pipe and service lines to the water system
- Turn on the water in the new pipe'
Water Bureau crews will post notices on front doors of affected properties at least 24 hours before a shutoff.
|
|
|
This project will require road closures on North Schmeer Road between North Vancouver Avenue and North Whitaker Road.
 Detour routes will change as work progresses. Traffic signs and flaggers will direct travelers around the closure areas. Stay alert and use caution as traffic may suddenly slow or stop.
|
|
Highlighting our Water Quality team |
|
|
Hydrant flushing is a technique used across the country to maintain water quality and clean the pipes that deliver water to homes and businesses.
As your drinking water flows from our sources to your tap, our certified staff work around the clock to keep your drinking water safe every step of the way.
We keep our water quality exceptional by:
- Protecting our drinking water sources
- Testing our water for contaminants
- Treating our water following state and federal regulations
- Maintaining our water systems
|
|
|
The City of Portland is committed to providing meaningful access. To request translation, interpretation, modifications, accommodations, or other auxiliary aids or services, contact 503-823-7432, Relay: 711.
Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas Translation and Interpretation: 503-823-7432, Relay: 711
This email was sent from an unmonitored inbox. Please do not reply. Instead, contact us at waterprojects@portlandoregon.gov.
|
|
|
|