Traffic and sound impacts
Next week, our contractors will continue conducting exploratory excavations using a vacuum truck to locate utilities and additional work along parts of Carpenter Lane, Cottrell Road, and Dodge Park Boulevard. This work is needed to prepare for updating these roads to Multnomah County roadway standards, including widening the pavement, resurfacing the asphalt, and adding a gravel shoulder.
What to expect
 |
Weekdays, June 22-26 7 a.m.-6 p.m.
|
 |
There will be intermittent noise, typically ranging from 75 to 90 dBA (similar to the sound level of a medium-sized tractor).
|
 |
Temporary lane closures with flaggers to direct traffic.
|
Construction activity for week beginning July 22, 2024
Construction work hours for the week beginning July 22 will be 7 a.m. and 6 p.m., Monday through Saturday. Deliveries and work to prepare or secure the site for the day may occur outside of these hours.
Work at and near the filtration site includes:
- Exploratory excavations using a vacuum truck to locate utilities and road improvements prep along parts of Carpenter Lane, Cottrell Road, and Dodge Park Boulevard
- Installation of tree protection fencing and erosion control measures on Carpenter Lane, Cottrell Road, and Dodge Park Boulevard
- Utility relocates on Carpenter Lane east of the Cottrell Road
- Moving equipment to the filtration facility site
- Installing security fencing around the perimeter of the site
- Building temporary construction roads at the facility site
- Installation of temporary water utilities at the facility site
- Heavy machinery excavating and grading into the SE stockpile area
- Soil stabilization including the use of tackifier to keep soil from leaving stockpiles
What to expect:
- 24-hour security at the filtration site
- Increased traffic near the facility site
- Filling of water trucks at the intersection of Carpenter and Cottrell
- Street sweeper operating on Carpenter Lane
- Light wetting of Carpenter Lane to keep dust down on the road
- Construction noise and vibration near the site
Work for the filtration pipelines includes:
- PGE working clearance along Lusted Road near Altman Road
What to expect:
- Temporary lane closures with PGE flaggers directing traffic on Lusted and Altman roads.
Find additional information about current and upcoming construction activities at portland.gov/filtration_activity.
Bull Run Filtration Coffee with the Contractor
The Portland Water Bureau will host an informal drop-in session where Bull Run Filtration Project neighbors can chat with representatives of the facility and pipeline construction teams, ask questions, and hear about recent progress and upcoming work.
Date: Thursday, August 8, 2024 Time: 9-10 a.m. Where: Sandy Community/Senior Center ‘Dining Room’ 38348 Pioneer Boulevard, Sandy, Oregon 97055
|
|
Get construction text alerts
Sign up to receive text notifications about temporary lane closures and other construction traffic information related to the Bull Run Filtration project.
|
|
|
The Bull Run Filtration Project will remove Cryptosporidium and other contaminants from the Bull Run water supply, producing cleaner, safer water for the one million people who use our water now and for future generations. The project is required by the federal Safe Drinking Water Act and must be completed by September 30, 2027, through a bilateral compliance agreement with the Oregon Health Authority.
To learn more, visit portland.gov/water/filtration.
|
|
|
Know someone who would be interested in updates about the Bull Run Treatment Projects? Please share the news!

The City of Portland is committed to providing meaningful access. To request translation, interpretation, modifications, accommodations, or other auxiliary aids or services, contact 503-823-7432, Relay: 711.
Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas Translation and Interpretation: 503-823-7432, Relay: 711
This email was sent from an unmonitored inbox. Please do not reply. Instead, contact us at bullrunprojects@portlandoregon.gov.
|
|
|
|