ODOT Region 1 Weekly Construction Update: January 27-Feburary 3
Oregon Department of Transportation sent this bulletin at 01/26/2018 12:55 PM PST
January 26, 2018
For more information: Katelyn Jackson 503-731-8503
Katelyn.Jackson@odot.state.or.us
Weekly Construction Update:
January 27-February 3, 2018*
*Schedules are subject to change due to weather and site conditions.
1. Visit TripCheck. Constantly updated with construction and crash data, TripCheck is the best way to learn about roadway conditions around the state.
2. Scroll down to the highways listed below to see impacts that affect you. Construction information is shown for one week, giving you the most up-to-date information for targeted areas in the Portland-metro region
3. Review this "quick glance" schedule. Construction information is shown for one week in a visual format, giving you the most up-to-date information for targeted areas in the Portland-metro region.
Interstate 5 – Pacific Highway – Interstate Sign Replacement Project
Project Description: This project will install, replace, repair and upgrade existing interstate signs and sign structures to meet current federal standards. The project area along I-5 will occur south of the Iowa Street viaduct and north of the OR 217 interchange.
Traffic Impacts:Shoulder closures (Exit 299A to OR 217) from 8 a.m. to 3 p.m
For more information: www.tinyurl.com/i5SignReplacementODOT2
Interstate 84 – Banfield Expressway – Regional Connections Project
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently. New electronic signs will be installed on U.S. 26 between I-405 and OR 217. During sign installations, there will be several full nighttime freeway closures. Work will be complete spring 2018.
Traffic Impacts: Double lane closures on I-84 (from I-5 to I-205) for eastbound direction Monday, westbound Tuesday through Friday, from 8 p.m. to 5:30 a.m.
For more information: www.odotrealtime.org
Interstate 84 – Columbia River Highway – Multnomah Falls sign installation
Project Description: This project will install a new electronic sign at the Multnomah Falls parking lot.
Traffic Impacts: No traffic impacts.
For more information: www.oregon.gov/odot/projects/pages/project-details.aspx?project=19642
Interstate 84 – Columbia River Highway – Wyeth to Lindsey Creek
Project Description: This project is constructing the next phase of the Historic Columbia River Highway State Trail. This segment will connect Wyeth Campgrounds to the State Trail at Lindsey Creek. Construction will occur through summer 2019.
Traffic Impacts: Periodic shoulder closures from Wyeth to Lindsey Creek. Cyclist access available through shoulder closure. Use caution.
For more information: www.oregon.gov/ODOT/Regions/Pages/State-Trail.aspx
Interstate 205 – East Portland Freeway – I-5 to the Abernethy Bridge
Project Description: This project will repave both directions of I-205 between the I-5 interchange in Tualatin and the south end of the Abernethy Bridge in West Linn.
Traffic Impacts: No traffic impacts.
For more information: www.i205construction.org
U.S. 26 – Sunset Highway – Cornelius Pass Road to 185th Avenue
Project Description: This project will widen U.S. 26 to three lanes in each direction between Cornelius Pass Road and NW 185th Avenue, replace the two Rock Creek bridges with one bridge, improve the north side of the Cornelius Pass Road interchange and build a sound wall on the north side of U.S. 26 in the Rock Creek neighborhood.
Traffic Impacts: Day shoulder closures on U.S. 26.
For more information: www.cornpass185.org
U.S. 26 – Sunset Highway – Regional Connections Project
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently. New electronic signs will be installed on U.S. 26 between I-405 and OR 217 and on I-84 between I-5 and I-205. New technology will be installed on TV Highway from OR 217 to Brookwood Parkway and on local Washington County roads. During sign installations on U.S. 26 and I-84, there will be several full nighttime freeway closures. Work will be complete in spring 2018.
Traffic Impacts: Night and day shoulder closures on U.S. 26.
For more information: www.odotrealtime.org or 24-hour noise hotline at 971-673-5239.
U.S. 26/OR 35 – Mt. Hood Highway – ODOT RealTime
Project Description: Construction is underway on a project that will place 13 electronic message signs along U.S. 26 and OR 35. These signs are part of the ODOT RealTime system and will provide travelers with real time information so they can make safe decisions.
Traffic Impacts: Periodic shoulder and lane closures, weather permitting.
For more information: www.oregon.gov/odot/projects/pages/project-details.aspx?project=18219
Oregon 8 – Tualatin Valley Highway – Regional Connections Project
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently.
Traffic Impacts: Single lane closures and shoulder closures on 185th Avenue, Cornelius Pass, Murray Road and Scholls Ferry Road from 9 a.m. to 3 p.m. weekdays.
For more information: www.odotrealtime.org
Oregon 99E – McLoughlin Boulevard – Harold to Harrison Paving
Project Description: This project will pave OR 99E in both directions between Harold Street in Portland to Harrison Street in Milwaukie. Also included in the project is replacing the Crystal Springs Bridge with a box culvert and reconstructing parts of the highway. Most lane closures will be at night. Four weekend closures of OR 99E northbound from Tacoma Street to Harold Street will take place in the summer. Work will be complete by the end of the year.
Traffic Impacts: No traffic impacts.
For more information: www.99Epaving.org
Oregon 213– Cascade Highway South – South Union Mills
Project Description: This project will improve safety on OR 213 at the intersection of South Union Mills Road by leveling out the crest of the hill to increase driver’s ability to see oncoming and turning traffic. This project will also add a standard right-turn lane on Union Mills and a center turning lane on OR 213 for southbound traffic.
Traffic Impacts: No traffic impacts.
For more information: www.OR213UnionMills.org
Oregon 213– Cascade Highway South – Highway repairs in Mulino
Project Description: Repair work is underway to install drains to create a path for water under the highway. Record setting rains reactivated an ancient landslide in March 2017. Roadway conditions will continue to change as additional movement of the landslide is expected.
Traffic Impacts: Travelers should be aware and look for traffic changes. Traffic is directed by flaggers around-the-clock. Speed is reduced to 45 mph.
For more information: www.OR213UnionMills.org
Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону (503) 731-4128.
이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: (503) 731-4128.
如果 您想了解这个项目翻译成简体中文的相关信息,请致电 (503) 731-4128.
For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call (503) 731-4128, TTY (800) 735-2900 or Oregon Relay Service 7-1-1.