City of Minneapolis - 37th Ave NE Reconstruction Project

PW project updates

 

37th Ave NE Reconstruction

June 14, 2024

37th Ave NE Reconstruction: Project Overview

The Cities of Minneapolis and Columbia Heights are in the process of reconstructing 37th Ave NE between Central Ave and Stinson Blvd, and 37th Pl NE between 37th Ave NE and Stinson Blvd.

The project includes complete replacement of the street infrastructure including curb and gutter, roadway pavement, driveway aprons and sidewalk. New medians will be installed at key intersections to provide better access to a new shared-use trail on the north side of 37th Ave NE. This project also features wide boulevards on both the north and south side of the street. Boulevards will feature green storm water infrastructure to help capture and treat surface water runoff before it is collected in the storm sewer system.


Latest Project News

ACTIVITES IN THIS WEEK

  • Installation of the sidewalk along the south side of 37th Street, between Johnson St and Central, has been successfully completed. This section of sidewalk is now open for public use
  • Topsoil and seeding for the boulevard are underway across the entire project area.
  • Painting the retaining wall completed, and paving preparation work in front of it.
  • Preparation for closing the gap in the shared trial near the railroad tracks is in progress.. 

 

1

Retaining wall painted and paving preparation infront of it.

2

Restoration behid the walk with hydro seed

3

The new sidewalk look.

What's Coming Up

ACTIVITIES FOR THE UPCOMING WEEK: 

  • Installation of plants and trees along the boulevard between Johnson and Central on the south side of 37th will commence.
  • Paving of the shared trail will be conducted adjacent to both the retaining wall and the railroad tracks..
  • Paving for the alley behind the retaining wall is scheduled.
  • The sidewalk gap near the railroad crossing will be finalized.

 

TRAFFIC IMPACT 

 It will stay the same as it was last week.

  • Central intersection
    • The northbound traffic has no right turn access at 37th intersection
    • The south bound traffic has no left tern at the intersection.
    • Eastbound closed for through traffic. Due to the construction work, the lane restriction will continue. 
    • The eastbound general traffic detour:  Central ↔ 40th Ave NE ↔Stinson Blvd.
  • Between Central Ave and Johnson St
    • The westbound lane is open to traffic   
    • The eastbound of 37th  closed and will remain closed due to activities in the stretch. However, It's accessible for local traffic.
    • All side streets are open to traffic.
    • Alleys on the south side of 37th temporary will be closed for the removal process.
  • Between Johnson St and Stinson Blvd.
    • Open to traffic 
  • Stinson intersection 
    • Open to traffic

 

WEEKLY STAKEHOLDER MEETING

  • The project holds a weekly stakeholder meeting every Thursdays between 10:30 a.m. and 11:00 a.m. using Microsoft Team Meeting Virtually.  Please use the link below or the link in the project web page.to join the meeting. 

            Join the 37th Ave NE Project Weekly Stakeholder Meeting

  • The meeting will helps us to give you more detail information about the work progress update weekly bases and to have discussion on any concerns or question you have about the project. Please send me an email or give me a call if you have difficulty using the link above.

For more information, please visit the project website link below.

      https://www.minneapolismn.gov/government/projects/37th-ave-ne-reconstruction/

 

Thank you !

 



Stay connected

Visit the project website and sign-up for updates: 

https://www.minneapolismn.gov/government/projects/37th-ave-ne-reconstruction 

www.37thavene.com/

Contact the project team: 

Ayalew Getaneh, Project Manager, 612-499-7557,  Ayalew.Getaneh@minneapolismn.gov

Charles Oliver C. Field Inspector, 612-247-0977,  Charles.Oliverjr@minneapolismn.gov    


For reasonable accommodations or alternative formats please contact 311.

People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000. TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-673-2800, Hadii aad Caawimaad u baahantahay 612-673-3500.