Hennepin Ave S reconstruction project - Weekly Update

PW project updates

Hennepin Ave S reconstruction

11/13/23

Hennepin Ave S reconstruction project overview

The City will reconstruct Hennepin Ave. between W. Lake St. and Douglas Ave. Construction will be phased over two years.
  • Phase 1 will be from Lake St W to 26th St occurring in 2024.
  • Phase 2 of the project is scheduled for 2025, covering the area between 26th St to Douglas Ave.

Latest project news

  • Utility Construction will continue on Phase 1 of the Hennepin S. Reconstruction Project from Lake St to 26th St. This work will continue throughout 2023 and into 2024.

  • Current Utility work consists of Center-Point Energy installing new gas mains on both sides of the corridor and installing new service connections.

Traffic impacts

  • Utility work using heavy equipment will increase noise, vibration, and dust in work areas and sidewalks.

  • Vehicle traffic will reduce travel lanes down to 1-lane in both directions during nonrush hours. Depending on the block’s construction activity.

  • Cross streets will at times be reduced to 1-lane.

  • Parking lanes will be closed at certain locations.

  • Business access will remain open during the construction.

  • Pedestrian detours will be set up as needed. Greater impacts can be expected at intersections where work is occurring.

  • Metro Transit bus stop closures will occur depending on location of activity. Service on the corridor will remain.


Visit our webpage

Visit the project page: 
www.minneapolismn.gov/government/projects/hennepin-ave-s/


WAYS TO STAY UPDATED

  • Starting in April, we’ll provide weekly construction updates. This will be posted as a downloadable PDF online.
  • You can also view project details and review past construction update meeting materials on the website.
  • Join us for our construction update meetings. Get more detailed information about how the work is progressing in our construction update meetings. These meetings are a place where we can discuss and answer any questions or concerns about the project.

Contact us

Visit the project page: 
www.minneapolismn.gov/government/projects/hennepin-ave-s/

Contact the construction engineer: Justin Gese,
jgese@sehinc.com, or 612-209-0731

Contact the project engineer: Adam Hayow,
adam.hayow@minneapolismn.gov or 612-673-2172


 


For reasonable accommodations or alternative formats please contact 311.

People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000. TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-673-2800, Hadii aad Caawimaad u baahantahay 612-673-3500.