Route 21 continues to operate on Lake Street during construction
There will be no construction update on May 3. Updates will resume on May 10.
Construction is active along Lake Street and Lagoon Avenue in Minneapolis, with major work currently along Lake Street and Lagoon Avenue between East Bde Maka Ska Parkway and Pillsbury Avenue.
Starting this week, the south (right-hand) lanes of Lake Street between Portland Avenue and 21st Avenue are closed, maintaining one lane in each direction for through traffic. More information on this work can be seen on project detour maps.
This work joins construction that is already active along Lake Street and Lagoon Avenue in Minneapolis between East Bde Maka Ska Parkway and Pillsbury Avenue, which is projected to switch sides starting in late May.
Schedule
-
Crews continue to install underground fiber optic cable along the corridor.
-
Separately from the B Line and Lake Street improvements, CenterPoint Energy is updating its infrastructure and gas meters in some locations. CenterPoint Energy staff may contact residents and businesses about potential short-term gas outages as they upgrade equipment. For more information on CenterPoint’s work, view its project website.
Current closure information
-
Dupont Avenue closed starting April 1 between 29th and 31st streets, including the intersection with Lake Street, for up to 8-10 weeks. Traffic is detoured to Lyndale Avenue during this time. During this closure, eastbound traffic on Lake Street will not be able to turn left at Dupont.
-
The intersection closure at Emerson & Lagoon Avenue started April 22, and will be closed for 2-3 weeks. Westbound traffic on Lagoon will remain open but reduced to two lanes, or one lane as needed.
-
The closure of Knox Avenue at Lagoon Avenue and at Lake Street will end May 3.
-
Oakland Avenue will be closed at the intersection of Lake Street starting May 2.
-
The north (right-hand) lanes of Lagoon Avenue between Dupont Avenue and East Bde Maka Ska Parkway are currently closed, maintaining two lanes for through traffic. This portion of Lagoon Avenue may be restricted to one lane to shorten the time needed for construction work and closures. This lane reduction is projected to last until mid-to-late May.
-
The south (right-hand) lane of Lake Street between Pillsbury Avenue and East Bde Maka Ska Parkway is currently closed, maintaining two lanes for through-traffic. This portion of Lake Street may be restricted to one lane between 9 a.m. and 3 p.m. to enable more efficient completion of construction work. This lane reduction is projected to last until mid-to-late May.
-
The south (right-hand) lane of Lake Street between Portland Avenue and 21st Avenue is currently closed, maintaining one lane in each direction for through-traffic.
Upcoming construction activities
Lake/Lagoon and Dupont Avenue
-
This week, crews completed storm sewer work, and began work on curb and gutter as well as other concrete work.
-
The week of April 29, crews will continue work on curb and gutter as well as other concrete work. Crews will also begin underground electrical work.
Lagoon Avenue and Fremont Avenue
-
This week, crews began concrete work at the intersection.
-
The week of April 29, crews will continue concrete work at the intersection. Major work at this intersection is scheduled to be complete by May 3.
Lagoon Avenue and Emerson Avenue
-
This week, crews completed concrete removals as well as storm sewer work.
-
The week of April 29, crews will complete curb and gutter work, and concrete patching work.
Lagoon Avenue and Humboldt Avenue
-
This week, crews began concrete work at the intersection.
-
The week of April 29, crews will continue concrete work at the intersection. Major work at this intersection is scheduled to be complete by May 3.
Lagoon Avenue and Irving Avenue
-
This week, crews completed electrical work and began concrete work.
-
The week of April 29, crews will continue concrete work at the intersection. Major work at this intersection is scheduled to be complete by May 3.
Lagoon Avenue and James Avenue
-
This week, crews completed electrical work and began concrete work.
-
The week of April 29, crews will continue concrete work at the intersection. Major work at this intersection is scheduled to be complete by May 3.
Lagoon Avenue and East Bde Maka Ska Parkway
-
This week, crews completed curb and gutter work, bus pad paving, and concrete patching.
-
The week of April 29, crews will install a temporary sidewalk. Major construction work at this intersection will be complete May 3.
-
Crews will return to finish the B Line station at the intersection later in the season.
Lake Street and East Bde Maka Ska Parkway
-
This week, crews completed underground electrical work, platform work, and concrete patching.
-
The week of April 29, crews will continue concrete work.
-
Crews will return to finish the B Line station at the intersection later in the season.
Lake Street and Knox Avenue
-
This week, crews completed storm sewer work and curb and gutter work.
-
The week of April 29, crews will complete underground electrical work and begin concrete work.
Lake Street and James Avenue
-
This week, crews completed concrete removals and began storm sewer work.
-
The week of April 29, crews will complete storm sewer work, curb and gutter work, and concrete patching.
Lake Street and Lyndale Avenue
-
Work began at this intersection the week of April 15 and will include concrete removals, storm sewer work, underground electric work, and construction of new pedestrian corners as well as a new B Line platform at the southeast corner of Lake & Lyndale. To facilitate this work, during the day, Lake Street may be reduced to one lane each direction without a left turn lane. You may see a traffic control agent at the intersection to keep traffic moving as smoothly as possible.
-
This week, crews completed storm sewer work and began underground fiber optic work.
-
The week of April 29, crews will complete underground fiber optic work, as well as curb and gutter work and bus pad paving.
Lake Street and Pillsbury Avenue
-
This week, crews completed curb and gutter work.
-
Next week, crews will complete underground electrical work.
Lake Street and Portland Avenue
-
Work at this intersection will begin the week of April 29 and will include concrete removals, storm sewer work, and installation of new pedestrian corners and a new concrete median.
Lake Street and Oakland Avenue
-
Work at this intersection will begin the week of April 29
-
Oakland Avenue will be closed at the intersection of Lake Street starting May 2.
-
Work will include concrete removals, storm sewer work, and installation of new pedestrian corners and a new concrete median.
Lake Street and Park Avenue
-
Work at this intersection will begin the week of May 6.
-
Work will include concrete removals, storm sewer work, and installation of new pedestrian corners.
Lake Street and Columbus Avenue
-
Work at this intersection will begin the week of May 6.
-
Work will include concrete removals, storm sewer work, and installation of new pedestrian corners.
Lake Street and Chicago Avenue
-
Work at this intersection will begin the week of May 6 and will include concrete removals, storm sewer work, underground electric work, and construction of new pedestrian corners as well as a new B Line platform at the southwest corner of Lake & Chicago.
Lake Street and Elliot Avenue
-
Work at this intersection will begin the week of May 6.
-
Work will include concrete removals, storm sewer work, and installation of new pedestrian corners.
General construction information
B Line and Lake Street improvements construction in 2024 will occur along Lake Street and Lagoon Avenue between France and Hiawatha avenues.
2024 construction work includes 15 B Line station platforms at eight intersections west of Hiawatha Avenue. Most construction in 2024 is related to Lake Street improvements funded by the City of Minneapolis and Hennepin County, which include:
-
Pedestrian and signal improvements at approximately 40 additional intersections.
-
Resurfacing and restriping of Lake Street and Lagoon Avenue, which includes 5.4 additional miles of bus-only lanes.
Work in the corridor will include station construction, utility work, pavement and intersection improvements, traffic signal changes, and resurfacing of the pavement on Lake Street and Lagoon Avenue.
When an area is under construction, the street will be partially closed to vehicle traffic in stages, with one side of the street being worked on at a time. At least one driving lane in each direction will be open throughout construction.
Sidewalks will remain open on at least one side of the street, and access will be maintained to homes and businesses. Parking on Lake Street and Lagoon Avenue will be restricted in some areas.
Metro Transit outreach staff will continue to canvass the 2024 construction area throughout spring to connect with businesses and residents along the route to share project and construction information.
|
Weekly walk-in construction office hours at locations on Lake Street will begin the week of May 20. More information including times and locations will be shared in this section in the coming weeks.
Any questions about B Line or Lake Street improvements construction can be directed to our construction hotline at 651-356-6995 or to BLine@metrotransit.org.
|