Budget Systems Newsletter is a periodic communication sent to users of MMB's budget systems: Appropriation Maintenance Application (AMA), Budget Planning and Analysis System (BPAS), Capital Budget System (CBS), Departmental Earnings (DE), and the Fiscal Note Tracking System (FNTS). Have a question about or a suggestion for improving one of the budget systems? Email it to Budget Operations at budget.finance.mmb@state.mn.us, Subject: Budget Systems Newsletter.
The
SWIFT Administration Portal will be unavailable on Sunday, October 8, from 7 a.m. to noon due to system maintenance. During this time, users will not be able to access the budget systems, including AMA, BPAS, CBS, DE, and FNTS. Please plan ahead.
Both
BPAS and FNTS showed improved levels of overall user satisfaction in the latest
survey of statewide systems users conducted last May. This year’s survey included the AMA and CBS budget systems for the first time. The chart below
summarizes users’ mean overall level of satisfaction with each budget system,
rated on a scale of one to five: one being “Very Unsatisfied” and five “Very
Satisfied”:
BPAS
users continue to comment on BPAS’ lack of real-time data reporting, the time
it takes to run reports, and the complexity of the system’s multi-dimensional
database. FNTS’ rich text editor continues to be a challenge for its users. MMB
has already implemented a number of changes to FNTS suggested by survey
respondents and the FNTS User Group (see below), and has begun a revision to BPAS to address that system’s
challenges.
MMB’s Enterprise Resource and Planning (ERP) Steering
Committee gave the Budget Division approval on August 31 to move BPAS onto a different
information systems platform, to provide real-time data and reporting for the
biennial budget process. BPAS 2.0 will be a web-based relational database
system, built using Microsoft .NET, the software tool used to build MMB’s other
web-based statewide budget systems.
In addition to better reporting, BPAS 2.0 will
be easier and less costly to operate and maintain. Agency data entry will
remain at the fund, appropriation and account level, and the system’s screen
designs will resemble the current system, so users should be able to easily
make the transition to BPAS 2.0.
The project will be completed in phases, with components ready by August 2018 for agencies to
prepare base budgets for the November 30, 2018 submission. While BPAS 2.0 is being built, MMB will continue to use and
maintain the existing BPAS, a multi-dimensional database system built on
Oracle’s Hyperion software. MMB will evaluate the project’s status in May 2018;
if more time is required, the existing BPAS will be used for the 2020-2021
biennial budget process.
The project build (MN.IT staff and contract
developers) will be funded from Statewide Budget System Interagency
Telecommunications Account, which was created in 2016 with funds carried
forward from the 2013 legislature’s appropriation to MMB for budget information
systems development and implementation.
Look for regular updates on the BPAS 2.0 project in the Budget Systems Newsletter.
- FY2014 – 16 (actual) data has not changed since
the 2018-19 budget was published.
- FY2017 (actual) data was loaded into BPAS as of
hard close (August 11)
- FY2018 – 21 (budget) data is not the enacted
budget, but is May Base (which is February forecast with minor changes)
- BBIS and Transfer forms are pointed to November
Base scenario
- To run a report in BPAS you need to select the
November Base scenario
- Data in BBIS November Base FY2018 – 2021 will be
updated in a limited capacity to assist with the November General Fund
Balance/Statement and Consolidated Fund Statement
-
Governor’s Recommendation (Change), February
Forecast and Governor’s Rec Revised (Change Revised) in the Working version are
no longer available. If you need data from the Governor’s 2018-19 Biennial
Budget, MMB Budget Planning and Operations can retrieve it for you.
There are appropriations that need to be reconciled for FY2017 in BPAS. The reconciliation is needed because the Available Resources do not match the Uses in the appropriation as of the FY2017 hard close. These are primarily federal and special revenue fund appropriations. These appropriations need to be reconciled so the data can be used to produce the actual FY2017 data in the November 2017 General Fund Balance/Statement and Consolidated Fund Statement. If you have any appropriations that are not reconciled for FY2017, MMB Budget Planning and Operations will contact your agency directly by email with specific instructions.
The Capital Budget System (CBS) is open to all users
until October 20. At that time, state agency and local government users will no
longer have write-access in CBS, but users will still be able to run reports.
As of October 20, all screens must be completed and projects must be in Final
Submitted status in order to be included in the publication of final requests,
and for requests to be considered for inclusion in the Governor’s 2018 capital
budget.
|