ROADSHOW Week of Dec. 7, 2025
Here, you'll find all of the NEW projects, maintenance, and other work taking place in our 11 county district:
Boone, Bracken, Campbell, Carroll, Gallatin, Grant, Harrison, Kenton, Owen, Pendleton, and Robertson Counties
Click the button below to take a look at all of the projects happening right now.
New items or changes in project status are italicized.
*Inclement weather or other unforeseen circumstances may occur, so the information below is strictly of an advisory nature and is subject to change with no notice.
Pothole patching, sweeping, drain & ditch work, litter pick up, brush clearing, culvert repairs and additional work by our KYTC maintenance crews may occur on major interstates/state routes during non-peak daytime hours and at night.
Motorists should watch for roadside maintenance on interstates/highways throughout the district DAILY. We will send out information to the public if these tasks require significant impacts to traffic.
|
|
I-275 CARROLL CROPPER BRIDGE UPDATE
 STEEL REPAIR WORK
The shoring beam has been installed, and floor beam repair work is currently underway.
Once floor beam repairs are completed, and the overall T-1 steel repair project is finished, crews will reopen all westbound lanes by Wednesday, Dec. 31, and current weight restrictions for emergency vehicles will be lifted.
ZONE PAINTING PROJECT
On Friday, Dec. 5, KYTC announced a zone painting project to minimize future traffic interruptions and maintain the condition of a critical crossing ahead of the Brent Spence Corridor Project construction.
Zone painting is a necessary maintenance practice for steel bridges to project against corrosion, particularly in vulnerable areas such as floor beams and beneath joints, or where existing paint has deteriorated. The process involves cleaning and repainting only the affected sections to prevent the spread of rust and extend the overall life of the structure.
Only a single eastbound lane of the bridge will need to remain closed during the length of the zone painting project expected to be completed by March 31, 2026, weather permitting.
Crews will be working simultaneously with a separate contractor already on-site performing floor beam repairs on the bridge. Performing this work now, during the ongoing bridge repairs, saves time and will get the bridge full opened sooner.
|
|

-
I-71 – 69.8 – 77.4 mile points – A resurfacing project on I-71 from the Boone/Gallatin County line to the I-71 and I-75 interchange is now complete.
|
|

-
Dutch Ridge Road (KY 2370) – 3.99 – 5.24 mile points – A resurfacing project on Dutch Ridge Road beginning just north of Hargetts Lane to Augusta-Minerva Road (KY 435) is now complete.
-
Asbury Road (KY 875) – 6.18 – 9.24 mile points – A resurfacing project on Asbury Road from Brooksville-Germantown Road (KY 10) to Dutch Ridge Road (KY 2370) is now complete.
|
|

-
KY 22 – 10.68 – 11.55 mile point – A diamond grinding and roadway improvement project on KY 22 between Warsaw Road (KY 467) and U.S. 25 is now complete.
|
|

-
Senour Road (KY 2047) – 0.0 – 0.67 mile point – A tree/brush clearing project on Senour Road between Fowler Creek Road and Cloverridge Drive has been postponed to Monday, Dec. 8, weather permitting. This project will improve safety and drainage on Senour Road.
This work will include a full road closure to thru traffic between the working hours of 8 a.m. and 3 p.m. Local traffic will be maintained. The road will reopen daily by 3 p.m. Motorists are encouraged to find alternate routes to avoid the closure.
Weather permitting, the project is expected to be completed Tuesday, Dec. 9 at 3 p.m. We will provide an update if additional days of work are needed.
-
Bristow Road/Shaw Road (KY 536) – 2.54 – 4.47 mile points – A widening and safety improvement project on KY 536 is now in progress. Crews will be working on KY 536 beginning at Williamswoods Drive extending to Madison Pike (KY 17).
The project includes the following improvements:
-Widening throughout the project area from two lanes of vehicular traffic, to four lanes, to reduce congestion and improve traffic efficiency
-A new alignment will be created north of the current KY 536
-A new bridge will be constructed over the existing Independence Road. This portion will tie back into the current KY 536 at mile point 3.9
-A multi-use path will be built on both sides of KY 536 to improve bicycle/pedestrian connectivity
-Curb/gutter improvements along with storm sewer and drainage work
Additionally, two roundabouts will be built to improve traffic flow, reduce congestion and increase safety. These roundabouts will be located at the following intersections:
-The intersection of KY 536 and Williamswoods Drive
-On the newly constructed portion of KY 536 west of Independence Road
This work may involve several traffic impacts for equipment moving in and out of the work zone.
The project will require traffic switches, and other new traffic patterns. Prior to these occurring, KYTC will send out an updated press release, as well as a post on social media to inform the public. Message boards will also be in place to warn motorists of any upcoming traffic pattern changes.
The project is expected to be completed Fall 2027. Learn more about this project here.
|
|

-
U.S. 127 – 14.37 – 14.92 mile point – A resurfacing project on a portion of U.S. 127 in downtown Owenton is now complete.
-
Cull Road (KY 1761) – 0.0 – 4.81 mile point – A resurfacing project on Cull Road from KY 22 extending northerly to KY 3215 is now complete.
|
|
Didn't see the project you're looking for?
This report highlights NEW projects and UPDATES for on-going projects. Our website roadshow stores ALL the information for all the projects that are currently taking place around the district. Please visit the link below for the most detailed project descriptions.
Contact the D6 PIO Office for More Information:
|
|
|
|