ROADSHOW Week of June 22, 2025
Here, you'll find all of the NEW projects, maintenance, and other work taking place in our 11 county district:
Boone, Bracken, Campbell, Carroll, Gallatin, Grant, Harrison, Kenton, Owen, Pendleton, and Robertson Counties
Click the button below to take a look at all of the projects happening right now.
New items or changes in project status are italicized.
*Inclement weather or other unforeseen circumstances may occur, so the information below is strictly of an advisory nature and is subject to change with no notice.
Pothole patching, sweeping, drain & ditch work, litter pick up, brush clearing, culvert repairs and additional work by our KYTC maintenance crews may occur on major interstates/state routes during non-peak daytime hours and at night.
Motorists should watch for roadside maintenance on interstates/highways throughout the district DAILY. We will send out information to the public if these tasks require significant impacts to traffic.
|
|
GALLATIN & CARROLL COUNTIES:
-
Interstate 71 – 52.77 – 57.36 mile points – Evening/overnight bridge work is scheduled for Monday, June 30, and is expected to cause significant delays for through traffic.
Beginning at 7 p.m., contractors will begin setting bridge beams for the new I-71 overpass bridge over KY 47. This work will require six rolling roadblocks, each consisting of a 25-minute slow roll at 10 – 15 mph, followed by a complete stop of up to 15 minutes to accommodate the delivery and placement of each beam. After each beam is set, traffic will be allowed to clear before the next roadblock begins. The process will repeat six times throughout the night.
Although traffic will continue to move at reduced speeds during the rolling portion of the operation, motorists should anticipate total delays of more than one hour and are strongly encouraged to seek alternate routes. All work is expected to be completed by 8 a.m. on Tuesday, July 1, at which time all traffic control devices will be removed from the roadway.
In addition to the I-71 northbound impacts, KY 47 will experience up to six temporary closures of approximately 15 minutes each, managed by flaggers. These closures will occur only during the actual beam setting process and will help ensure safety for all travelers in the area.
Through traffic, especially commercial vehicles and long-distance travelers, are advised to consider using I-64 East to I-75 North as a detour route. While this alternate route adds approximately 30 – 40 minutes of drive time, it may ultimately save time and avoid significant congestion along I-71.
This work is part of the ongoing I-71 widening project on an approximately 4.59 mile portion of I-71 in Gallatin and Carroll Counties.
CAMPBELL & PENDLETON COUNTIES:
-
PORTIONS OF FLAGG SPRINGS PIKE (KY 10) AND CARTHAGE ROAD (KY 1996):
Four resurfacing projects in Campbell and Pendleton Counties are in progress.
Milling/paving operations are expected to be completed by the end of the day on Friday, June 20. Edge line striping will be the final task of the project.
|
|

-
Interstate 71 – 69.8 – 77.4 mile points – A resurfacing project on I-71 from the Boone/Gallatin County line to the I-71 and I-75 interchange is in progress.
Crews are currently working on completing base failure repairs throughout the project limits. Once base failure repairs have been completed, crews will shift to clearing, and then milling/paving operations.
Beginning at 7 p.m. on Friday, June 20, the I-75 northbound off-ramp to I-71 southbound (Exit 173) will be closed to allow crews to address base failure repairs. The closure is necessary to complete deep repairs that cannot be performed efficiently while being open to traffic.
The ramp is expected to reopen by 7 a.m. on Monday, June 23.
DETOUR: Exit 175 for Richwood Road (KY 338), re-enter I-71/75 southbound and use Exit 173 to merge onto I-71 southbound. Detour signage will be posted to guide motorists.
Additionally, a single lane closure on I-71 southbound will also be in place near the I-71/I-75 split during this weekend work. The closure will alternate between the left and right lanes as needed.
|
|

- Wellsburg Walcott Road (KY 1159) – 4.33 – 7.09 mile point – A resurfacing project on Wellsburg Walcott Road from the AA Highway (KY 9) to Mary Ingles Highway (KY 8) is now complete.
- Bridgeville Road (KY 875) – 0.0 – 2.07 mile point – A resurfacing project on Bridgeville Road from the Robertson/Bracken County Line to KY 352 is now complete.
|
|

-
Mary Ingles Highway (KY 6335) – 2.75 – 3.3 mile point – A utility project will begin on Monday, June 23. Duke Energy will be replacing utility poles along the highway. Mary Ingles Highway will be closed between south of Lester Lane and the 3.3 mile point. The closure will be in place Monday through Friday between the working hours of 9 a.m. and 3 p.m.
Message boards are in place to provide notice of the closure. Weather permitting, this permit project is expected to be completed Thursday, July 3 at 3 p.m.
-
Pooles Creek Road (KY 1998) – 0.0 – 1.73 mile points – A resurfacing project on Pooles Creek Road between AA Highway (KY 9) and Alexandria Pike (U.S. 27) is in progress.
Milling is now complete, crews will begin paving operations on Saturday, June 21. This work will be performed during daytime hours from 7 a.m. to 7 p.m.
During working hours, a single lane closure will be in place with flaggers on-site to direct traffic through the work zone.
-
Martha Lane Collins Boulevard (KY 2345) – 0.0 – 0.59 mile points – A resurfacing project on a portion of Martha Lane Collins Boulevard beginning at Alexandria Pike (U.S. 27) extending to Johns Hill Road (KY 3490) is in progress.
Base failure repairs on Martha Lane Collins Boulevard are now complete.
Milling will begin on Friday, June 20. Paving is scheduled for Tuesday, June 24. To minimize impacts on traffic, a majority of the work will take place during overnight hours from 7 p.m. to 7 a.m.
During working hours, a single lane closure will be in place with flagger on-site to direct traffic through work zone.
|
|

-
Interstate 75 – 157.7 – 162.7 mile points – A resurfacing project on a five-mile stretch of I-75, from just south of Dry Ridge to just north of the Sherman Mt Zion Road (KY 1994) overpass is in progress.
Beginning Sunday night, June 22, crews will shift work to the northbound lanes of I-75 within the project limits. A double lane closure will be in place to set up cones and prepare for upcoming resurfacing work.
Starting Monday night, June 23, crews will begin milling and paving the right lane and shoulder, followed by the center lane. During this phase, northbound traffic will be shifted to the left lane and shoulder, with two lanes remaining open.
|
|

-
River Road (KY 8) – 0.01 – 1.9 mile points – On Tuesday, June 17, Kenton and Robertson County KYTC maintenance crews began work on several mudslides between Amsterdam Road and the Villa Hills Marina. The road has a full closure in this area due to the slides. Crews anticipate the road to reopen in several weeks. KYTC will provide an update on social media and the District 6 Roadshow once the road is closer to reopening.
|
|
Didn't see the project you're looking for?
This report highlights NEW projects and UPDATES for on-going projects. Our website roadshow stores ALL the information for all the projects that are currently taking place around the district. Please visit the link below for the most detailed project descriptions.
Contact the D6 PIO Office for More Information:
|
|
|
|
|